Well ID: 34-029-21849 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.8121286456,"lon":-80.9007153994,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2014-07-17 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 40.8121286456 | |
Longitude: -80.9007153994 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1247444992 | 2014-07-17 | |||||
-1489636207 | 2014-08-07 | I was on site to witness the pit solidification with Inspector John Fleming. Chem Tech, Inc. was doing the pit solidifying. Three bulk trucks of lime used to solidify pits. Mix looks good. A 140 bbl tank is on site. Summit well service was there to empty the tank. Access road and site are in good repair. | ||||
-1625849855 | 2014-07-18 | |||||
-810483309 | 2014-07-24 | |||||
1408977749 | 2014-08-14 | I was on site to check on the status of the pits. Pit solidification was complete and pits were completely covered over and graded. Crews were building tank battery pad and dike when I arrived. The flow lines were going to be installed later in the day. The access road and site are stable. | ||||
1714987941 | 2014-07-15 | I stopped at the site to check on the drilling rigs move-in progress. The access road was cut and covered with crushed limestone. Brush was cleared and stockpiled for the owner for firewood and the drilling pad was cut. Erosion prevention measures have been taken. The drilling rig was not yet on location, but pieces were beginning to arrive. The pits had not yet been dug. The wells were staked. I took GPS readings for the well and access road entries. | ||||
243123482 | 2014-07-22 | |||||
866985563 | 2014-07-16 | I was on site to check on the status of the construction of the pits. The road fabric was in place in the west pit and the east pit was still under construction. Mentioned erosion possibilities to Russell Miller of Vanguard on west side of pad and we discussed measures to be taken. Full permit was posted in the doghouse. |