34-115-24682

Well Details

Well ID: 34-115-24682
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2013-12-03
Unconventional:
Horizontal:
Producing: No
Violations: 0
Latitude: 39.6560105643
Longitude: -81.9697163398

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-187218000 2013-12-03 I am on site to witness the cementing of the conductor casing. Kilbarger Patterson rig 17 drilled 36" hole to a depth of 99'. Formation Cement then cemented 97' of 30" casing in place with 120 sacks of class A cement. There were good cement returns at surface.
-241695005 2013-12-16 Baker Hughes was on location preparing to log the hole and perf foramtion. If everything goes as planned, Artex will be setting the 4.5" sometime tomorrow morning.
-693895227 2014-01-13 The rig has moved off of location and there is a wellhead in place, however there is still drilling equipment on site. The pit is still open however the operator has recently graded the area.
1386227298 2013-12-05 I am on site to witness the cementing of the surface casing. Kilbarger Patterson rig 17 drilled 12 1/4" hole to a depth of 739'. The baffle was at 644' and the casing shoe was at 687'. They used three centralizers on the bottom. Formation Cement then cemented 687' of 9 5/8" casing in place with 230 sacks of class A cement. There were good cement returns at the surface however the casing head leaked so they were no able to hold the 700 psi. Heath, with Artex, will perform a annular test when they test the BOP.
2051023768 2014-08-15 Site now correctly meets 1509.072 preliminary requirements.