Well ID: 34-115-24682 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.6560105643,"lon":-81.9697163398,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2013-12-03 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 39.6560105643 | |
Longitude: -81.9697163398 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-187218000 | 2013-12-03 | I am on site to witness the cementing of the conductor casing. Kilbarger Patterson rig 17 drilled 36" hole to a depth of 99'. Formation Cement then cemented 97' of 30" casing in place with 120 sacks of class A cement. There were good cement returns at surface. | ||||
-241695005 | 2013-12-16 | Baker Hughes was on location preparing to log the hole and perf foramtion. If everything goes as planned, Artex will be setting the 4.5" sometime tomorrow morning. | ||||
-693895227 | 2014-01-13 | The rig has moved off of location and there is a wellhead in place, however there is still drilling equipment on site. The pit is still open however the operator has recently graded the area. | ||||
1386227298 | 2013-12-05 | I am on site to witness the cementing of the surface casing. Kilbarger Patterson rig 17 drilled 12 1/4" hole to a depth of 739'. The baffle was at 644' and the casing shoe was at 687'. They used three centralizers on the bottom. Formation Cement then cemented 687' of 9 5/8" casing in place with 230 sacks of class A cement. There were good cement returns at the surface however the casing head leaked so they were no able to hold the 700 psi. Heath, with Artex, will perform a annular test when they test the BOP. | ||||
2051023768 | 2014-08-15 | Site now correctly meets 1509.072 preliminary requirements. |