X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-115-24682

Well Details

Well ID: 34-115-24682
Loading map...
Country: United States
State: Ohio
County: Morgan
Municipality: Deerfield Township
Operator Name: ARTEX OIL COMPANY
Well Pad ID:
Farm/Lease Name: LAPP UNIT
License Status: Producing
License Date: 2013-11-07
Spud Date: 2013-12-03
Spud Drilling Contractor: KILBARGER DRLG
Final Drill Date: 2013-12-17
Well Total Depth: 6476.00 ft
Configuration: Vertical
Latitude: 39.650000
Longitude: -81.960000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-11-07 Proposed Formations:KNOX, Issued Date:11/7/2013, Expired Date:11/7/2015 12:00:00 PM, Drilling unit acres:50, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2013-12-17
Completion Report Received 2014-05-27
Construction Permit Expires 2015-11-07
Record Last Modified 2017-02-10

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2015-01-30 6315 6395 111
6315 6395 111
6315 6395 111

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2020-01-08 H2O 15 22000 Gal 0 Producers Service Corporation

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 ARTEX OIL COMPANY 22971.00 81.00 365
2015 ARTEX OIL COMPANY 2287.00 0.00 365
2016 ARTEX OIL COMPANY 1533.00 0.00 365
2017 ARTEX OIL COMPANY 1394.00 0.00 365
2018 ARTEX OIL COMPANY 956.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 ARTEX OIL COMPANY Brine 2286 365
2015 ARTEX OIL COMPANY Brine 0 365
2016 ARTEX OIL COMPANY Brine 0 365
2017 ARTEX OIL COMPANY Brine 0 365
2018 ARTEX OIL COMPANY Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-187218000 2013-12-3 0:00: DD No Violations 5.50
-241695005 2013-12-16 0:00 DD No Violations 1.00
-693895227 2014-1-13 0:00: DD No Violations 0.50
0187218000 2013-12-03 Drill / Deepen / Reopen No Violations I am on site to witness the cementing of the conductor casing. Kilbarger Patterson rig 17 drilled 36 hole to a depth of 99. Formation Cement then cemented 97 of 30 casing in place with 120 sacks of class A cement. There were good cement returns at surface.
0241695005 2013-12-16 Drill / Deepen / Reopen No Violations Baker Hughes was on location preparing to log the hole and perf foramtion. If everything goes as planned, Artex will be setting the 4.5 sometime tomorrow morning.
0693895227 2014-01-13 Drill / Deepen / Reopen No Violations The rig has moved off of location and there is a wellhead in place, however there is still drilling equipment on site. The pit is still open however the operator has recently graded the area.
1386227298 2013-12-05 Drill / Deepen / Reopen No Violations I am on site to witness the cementing of the surface casing. Kilbarger Patterson rig 17 drilled 12 1/4 hole to a depth of 739. The baffle was at 644 and the casing shoe was at 687. They used three centralizers on the bottom. Formation Cement then cemented 687 of 9 5/8 casing in place with 230 sacks of class A cement. There were good cement returns at the surface however the casing head leaked so they were no able to hold the 700 psi. Heath, with Artex, will perform a annular test when they test the BOP.
2051023768 2014-08-15 Preliminary Restoration No Violations Site now correctly meets 1509.072 preliminary requirements.

For data sources see[9]

References