If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-113-20024 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.5486,"lon":-76.649269,"icon":""}]} |
County: Sullivan | |
Municipality: Elkland Township | |
Operator Name: CHIEF OIL & GAS LLC | |
Well Pad ID: 149302 | |
Farm/Lease Name: SIGNORE UNIT 1 | |
First Permit Date: 2010-08-09 | |
Last Permit Date: 2010-09-23 | |
Spud Date: 2010-09-14 | |
Unconventional: Yes | |
Horizontal: Yes | |
Well Status: ACTIVE | |
Violations: 13 | |
Latitude: 41.5486 | |
Longitude: -76.649269 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2010-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2013-1 | 585021.0 | 84.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2013-2 | 1254747.0 | 182.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2014-1 | 1218919.0 | 181.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2014-2 | 349452.0 | 184.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2015-02 | 93394.02 | 28.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2015-01 | 94162.0 | 31.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2015-03 | 93518.37 | 27.0 | 0.0 | 0.0 | 0.0 | 0.0 |
For data sources see[1]
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2010-0 | DRILLING FLUID WASTE | 833.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0008451 | SUNBURY GENERATION WASTE WATER TRMT FAC | SHAMOKIN DAM | PA |
2010-2 | DRILLING FLUID WASTE | 833.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0008451 | SUNBURY GENERATION WASTE WATER TRMT FAC | SHAMOKIN DAM | PA |
2011-1 | DRILL CUTTINGS | 46.47 | Tons | LANDFILL | 301626 | WHITE PINES LANDFILL | MILLVILLE | PA |
2013-1 | FRACING FLUID WASTE | 94.1 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NC006 | CLEAN STREAMS LLC WILLIAMSPORT FACILITY | WILLIAMSPORT | PA |
2013-1 | FRACING FLUID WASTE | 737.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING | |||
2013-1 | PRODUCED FLUID | 912.1 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING | |||
2013-2 | PRODUCED FLUID | 244.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | |||
2014-1 | PRODUCED FLUID | 497.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | |||
2014-2 | PRODUCED FLUID | 100.93 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY |
For data sources see[2]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
1915402 | 2010-09-22 | No Violations Noted | ||||
1928631 | 2010-11-18 | Violation(s) Noted | 599686 | 201G - Failure to post permit number, operator name, address, telephone number in a conspicuous manner at the site during drilling | ||
1928631 | 2010-11-18 | Violation(s) Noted | 599687 | 102.4NOPLAN - No E&S plan developed, plan not on site | ||
1928631 | 2010-11-18 | Violation(s) Noted | 599688 | 102.11 - Failure to design, implement or maintain BMPs to minimize the potential for accelerated erosion and sedimentation. | ||
1940024 | 2010-12-30 | No Violations Noted | ||||
1945369 | 2010-11-29 | No Violations Noted | ||||
1945377 | 2010-12-14 | No Violations Noted | ||||
1945381 | 2010-11-19 | No Violations Noted | ||||
1953254 | 2011-03-01 | Violation(s) Noted | 605617 | 102.11 - Failure to design, implement or maintain BMPs to minimize the potential for accelerated erosion and sedimentation. | ||
1953254 | 2011-03-01 | Violation(s) Noted | 605618 | SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. | ||
1965476 | 2011-04-13 | Violation(s) Noted | 608808 | 78.66A - Failure to report release of substance threatening or causing pollution | ||
1965476 | 2011-04-13 | Violation(s) Noted | 608809 | 402CSL - Failure to adopt pollution prevention measures required or prescribed by DEP by handling materials that create a danger of pollution. | ||
1965476 | 2011-04-13 | Violation(s) Noted | 608810 | 78.57 - Failure to post pit approval number | ||
1965476 | 2011-04-13 | Violation(s) Noted | 608811 | SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. | ||
1968024 | 2011-04-18 | Violation(s) Noted | 609422 | SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. | ||
1968024 | 2011-04-18 | Violation(s) Noted | 609423 | 78.56(1) - Pit and tanks not constructed with sufficient capacity to contain pollutional substances. | 78.56(a) | |
1968024 | 2011-04-18 | Violation(s) Noted | 609424 | CSL402POTPOL - There is a potential for polluting substance(s) reaching Waters of the Commonwealth and may require a permit | ||
1972124 | 2011-05-09 | Violation(s) Noted | 610730 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Eroded fill slope caused sediment discharge outside LOD and failed E/S controls. | |
1978156 | 2011-06-01 | No Violations Noted | ||||
2000075 | 2011-08-30 | No Violations Noted | Follow up. 4/11 Flowback spill and E&S issues. E&S good. Soil sampling from spill also good. |
For data sources see[3]