Well ID: 37-113-20024 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.5486,"lon":-76.649269,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Sullivan | |
Municipality: Elkland Township | |
Operator Name: CHIEF OIL & GAS LLC | |
Well Pad ID: 149302 | |
Farm/Lease Name: SIGNORE UNIT 1 | |
License Status: Active | |
Spud Date: 2010-09-16 | |
Permit Date: 2010-08-09 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.5486 | |
Longitude: -76.649269 |
Date | Event |
---|---|
2010-08-09 | New Permit Application |
2010-09-14 | Performed Spud Operation |
2010-09-23 | New Permit Application |
2010-10-04 | Drilling Completion |
2010-12-31 | Drilling Completion |
2011-03-17 | DEVIATED |
2011-03-17 | NEWLY DRILLED |
2011-04-11 | Perforation |
2013-02-04 | Perforation |
2013-04-18 | REWORKED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-02-17 | 2013-02-17 | 7,457 | 3,679,872 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Provided By Customer | Base Fluid | Fresh Water | 100.0 | 54.0 | ||
Water | 7732-18-5 | 85.0 | None | |||||
Sand (Proppant) | Halliburton | Propping Agent | Crystalline Silica | 14808-60-7 | 99.9 | 45.0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CHIEF OIL & GAS LLC | 1,839,768.00 | 266 | 0.00 | 0 | 0.00 | 0 |
2014 | CHIEF OIL & GAS LLC | 1,568,371.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | CHIEF OIL & GAS LLC | 935,331.32 | 360 | 0.00 | 0 | 0.00 | 0 |
2016 | CHIEF OIL & GAS LLC | 472,626.65 | 191 | 0.00 | 0 | 0.00 | 0 |
2017 | CHIEF OIL & GAS LLC | 418,781.85 | 358 | 0.00 | 0 | 0.00 | 0 |
2018 | CHIEF OIL & GAS LLC | 267,540.78 | 349 | 0.00 | 0 | 0.00 | 0 |
2019 | CHIEF OIL & GAS LLC | 225,645.14 | 359 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 833.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0008451 |
2011 | CHIEF OIL & GAS LLC | Drill Cuttings | 46.47 Tons | LANDFILL | 301626 |
2013 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 737.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 94.10 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NC006 |
2013 | CHIEF OIL & GAS LLC | Produced Fluid | 1,156.10 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHIEF OIL & GAS LLC | Produced Fluid | 597.93 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHIEF OIL & GAS LLC | Produced Fluid | 294.88 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHIEF OIL & GAS LLC | Produced Fluid | 129.31 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 8.36 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2018 | CHIEF OIL & GAS LLC | Produced Fluid | 11.68 Bbl | REUSE (AT WELL PAD) | |
2019 | CHIEF OIL & GAS LLC | Produced Fluid | 5.02 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1915402 | Primary Facility | 2010-09-22 | Drilling/Alteration | No Violations Noted | |
1928631 | Primary Facility | 2010-11-18 | Routine/Complete Inspection | Violation(s) Noted | |
1940024 | Primary Facility | 2010-12-30 | Follow-up Inspection | No Violations Noted | |
1945369 | Primary Facility | 2010-11-29 | Drilling/Alteration | No Violations Noted | |
1945377 | Primary Facility | 2010-12-14 | Drilling/Alteration | No Violations Noted | |
1945381 | Primary Facility | 2010-11-19 | Drilling/Alteration | No Violations Noted | |
1953254 | Primary Facility | 2011-03-01 | Routine/Complete Inspection | Violation(s) Noted | |
1965476 | Primary Facility | 2011-04-13 | Routine/Complete Inspection | Violation(s) Noted | |
1968024 | Primary Facility | 2011-04-18 | Routine/Partial Inspection | Violation(s) Noted | |
1972124 | Primary Facility | 2011-05-09 | Routine/Partial Inspection | Violation(s) Noted | |
1978156 | Primary Facility | 2011-06-01 | Follow-up Inspection | No Violations Noted | |
2000075 | Primary Facility | 2011-08-30 | Follow-up Inspection | No Violations Noted | Follow up. 4/11 Flowback spill and E&S issues. E&S good. Soil sampling from spill also good. |
2272267 | Primary Facility | 2014-05-17 | Routine/Complete Inspection | No Violations Noted | |
2451638 | Primary Facility | 2016-02-18 | Routine/Complete Inspection | No Violations Noted | Routine inspection conducted to assess general conditions on site. No Chief representatives were present.
Site vegetated with >70% vegetative cover, and temporary erosion and sediment control BMPs have been removed. No ESCGP was issued for this site as the total area of disturbance is less than 5 acres. No evidence of accelerated erosion or sedimentation was observed. Drilling is currently underway. Containment was in place under the drill rig and appurtenant equipment. Containment was also being used for pumps and generators that were not within the drilling mat area. No evidence of leaks or spills was observed. At the time of inspection, the pad surface was very muddy. However, all of the mud was contained on the pad. No voilations were cited during this inspection. |
2460841 | Primary Facility | 2016-03-02 | Routine/Complete Inspection | No Violations Noted | Routine inspection conducted to assess general conditions on site. No Chief representatives were present.
Drilling activity is still underway. Site containment was in place and all equipment, chemicals, and fuels on site were located within the containment. No evidence of spills was observed outside of the containment on the pad surface. Some containments were partially filled with water; the water should be removed to provide maximum containment capacity. No violations were cited during this inspection. |
2466436 | Primary Facility | 2016-03-21 | Incident- Response to Accident or Event | Viol(s) Noted & Immediately Corrected | Response to reported spill of drilling mud. Hose sprang leak and approx. 10 gallons of mud were released to well pad and area south of pad. Affected area being scraped and debris removed. |
2497476 | Primary Facility | 2016-05-27 | Administrative/File Review | No Violations Noted | 5/27/16: The DEP has reviewed the 5/2/16 document titled "Site Characterization Summary” for the Signor Well Pad 1H release reported to the DEP on 3/20/16 by Chief O&G. The report was reviewed in accordance with Alternative Remediation provision of department policy document 800-5000-001 Addressing Spills and Releases at Oil and Gas Well Sites or Access Roads. No technical deficiencies were noted. |
2529568 | Primary Facility | 2016-10-20 | Routine/Complete Inspection | No Violations Noted | Routine inspection to assess site conditions during flowback operations.
Screened electrical conductivity in puddls on the well pad surface. Readings ranged from 242 uS/cm to 879 uS/cm. No evidence of any spills such as staining, sheens, or odors were observed. An area of erosion has started near the southeast corner of the well pad. This appears to be the low corner of the pad, and it appears the flow has concentrated and eroded pad material down the fill slope. None of the eroded material has left the limit-of-disturbance for the site. Merle Wade of Chief was on site and informed of this finding. No violations were cited during this inspection. |
2534935 | Primary Facility | 2016-11-02 | Follow-up Inspection | No Violations Noted | Arrived @ 11:17. Routine inspection of unconventional gas pad following stimulation and flow back. The site was wet following heavy rain, a worker onsite was vaccing up standing water. Flow back equipment was onsite. The Signore North Unit 4H and Signore North Unit 5H were in production. The 1H was not in production at the time of my inspection. Left location @ 11:30. |
2537579 | Primary Facility | 2016-11-17 | Complaint Inspection | Viol(s) Noted & Immediately Corrected | Inspection conducted in response to spill reported to the Department by Chief Oil & Gas, LLC (Spill Notification ID No. 323649). Chief reported that approximately 20 gallons of brine leaked during the replacement of a produced water tank to the ground surface. The spilled fluid was immediately removed with a vacuum truck and the affected pad substrate was excavated and removed. New gravel was put in place.
Mitigation efforts had been completed at the time of my inspection. New gravel was evident at the location of the spill. No odor or staining that could indicate residual contamination was noted. Because the brine spilled on the pad surface, this release had the potential to pollute waters of the Commonwealth, which is in violation of 35 P.S. § 691.402(b). Title 35 P.S. § 691.402(b) prohibits conducting activities regulated by permits issued pursuant to Section 402 of The Clean Streams Law to prevent the potential of pollution contrary to the issued permits or without a permit. Further, since the spill |
2598747 | Primary Facility | 2017-05-26 | Routine/Complete Inspection | No Violations Noted | Three wells in production phase. Three separators within containment. No leaks from production equipment. Site has very steep fill slopes and requires further stabilization to prevent further erosion. |
2812127 | Primary Facility | 2018-12-06 | Routine/Complete Inspection | No Violations Noted | Arrived onsite for a routine inspection at 12:57; the weather was ~30°F and windy.
There were 3 properly tagged Marcellus wells staged for production. The well cellars were filled with ice. There were 3 GPUs onsite and in secondary containment. The secondary containment onsite was about 25% filled with ice. The pad area was reduced in size and the site was greater than 70% vegetative cover. No E&S issues were observed. No violations noted at the time of inspection. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1928631 | 599686 | 11/18/2010 | 2010-11-18 | 201G - Failure to post permit number, operator name, address, telephone number in a conspicuous manner at the site during drilling | Administrative | |
1928631 | 599687 | 11/18/2010 | 2010-11-18 | 102.4NOPLAN - No E&S plan developed, plan not on site | Administrative | |
1928631 | 599688 | 11/18/2010 | 2010-11-18 | 102.11 - Failure to design, implement or maintain BMPs to minimize the potential for accelerated erosion and sedimentation. | Administrative | |
1953254 | 605617 | 03/01/2011 | 2011-03-01 | 102.11 - Failure to design, implement or maintain BMPs to minimize the potential for accelerated erosion and sedimentation. | Administrative | |
1953254 | 605618 | 03/01/2011 | 2011-03-01 | SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. | Environmental Health & Safety | |
1965476 | 608808 | 04/13/2011 | 2011-04-13 | 78.66A - Failure to report release of substance threatening or causing pollution | Administrative | |
1965476 | 608809 | 04/13/2011 | 2011-04-13 | 402CSL - Failure to adopt pollution prevention measures required or prescribed by DEP by handling materials that create a danger of pollution. | Environmental Health & Safety | |
1965476 | 608810 | 04/13/2011 | 2011-04-13 | 78.57 - Failure to post pit approval number | Administrative | |
1965476 | 608811 | 04/13/2011 | 2011-04-13 | SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. | Environmental Health & Safety | |
1968024 | 609422 | 04/18/2011 | 2011-04-18 | SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. | Environmental Health & Safety | |
1968024 | 609423 | 04/18/2011 | 2011-04-18 | 78.56(1) - Pit and tanks not constructed with sufficient capacity to contain pollutional substances. | Administrative | 78.56(a) |
1968024 | 609424 | 04/18/2011 | 2011-04-18 | CSL402POTPOL - There is a potential for polluting substance(s) reaching Waters of the Commonwealth and may require a permit | Environmental Health & Safety | |
1972124 | 610730 | 05/09/2011 | 2011-05-09 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | Eroded fill slope caused sediment discharge outside LOD and failed E/S controls. |
2466436 | 754778 | 2016-03-21 | 2016-03-21 | CSL 402(b) | Environmental Health & Safety | |
2466436 | 754779 | 2016-03-21 | 2016-03-21 | 91.34A | Environmental Health & Safety | |
2537579 | 772386 | 2016-11-17 | 2016-11-17 | CSL 402(b) | Environmental Health & Safety | |
2537579 | 772387 | 2016-11-17 | 2016-11-17 | 91.34(A) | Environmental Health & Safety |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
608808 | 269988 | NOV - Notice of Violation | Comply/Closed | 2011-08-30 | |||
608809 | 269988 | NOV - Notice of Violation | Comply/Closed | 2011-08-30 | |||
608811 | 269988 | NOV - Notice of Violation | Comply/Closed | 2011-08-30 |