If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-23048 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.02388424,"lon":-81.52065101,"icon":""}]} |
County: Summit | |
Municipality: | |
Operator Name: OHIO VALLEY ENERGY SYSTEM CORP | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2008-06-06 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 41.02388424 | |
Longitude: -81.52065101 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2008-0 | 0.0 | 86.0 | ||||
2009-0 | 8518.0 | 1752.0 | ||||
2010-0 | 5451.0 | 769.0 | ||||
2011-0 | 4500.0 | 566.0 | ||||
2012-0 | 3621.0 | 401.0 | ||||
2013-0 | 2529.0 | 345.0 | ||||
2014-0 | 2019.0 | 365.0 | 232.0 | 365.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
113639727 | 2008-07-03 | The site is being graded. The pits have been solidified and covered over. | ||||
1137017239 | 2008-06-03 | The location has been built and the rig should arrive in the next day or two. The ID and permit are posted at the entrance. No violations at this time. | ||||
1213926688 | 2008-06-09 | Wildcat is drilling ahead. The pits are lined, fenced and in good condition. No violations at this time. | ||||
1214870039 | 2008-06-17 | The drilling pits have been pumped down and are lined and fenced. No violations at this time. | ||||
1219067594 | 2008-08-11 | The tank battery is being built and the site has been graded. The well can be turned on as soon as the fence has been installed. | ||||
1229439435 | 2008-12-03 | Preliminary restoration is approved. | ||||
1546214747 | 2008-06-06 | Wildcat is on location and started drilling. Should be ready to set surface casing late tonight or early tomorrow morning. The pits are lined and in good condition. | ||||
-1822064016 | 2008-06-12 | The drilling pits are fenced, lined and in good condition. No violations at this time. | ||||
-183112909 | 2008-06-10 | Wildcat is drilling ahead. The pits are fenced, lined and in good condition. | ||||
367617141 | 2008-06-24 | The drilling pits have been solidified and covered. |
For data sources see[2]