If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-23048 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.02,"lon":-81.52,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: OHIO VALLEY ENERGY SYSTEMS COR | |
Well Pad ID: | |
Farm/Lease Name: PEERY | |
License Status: Producing | |
License Date: 2008-04-08 | |
Spud Date: 2008-06-06 | |
Spud Drilling Contractor: WILDCAT DRILLING | |
Final Drill Date: 2008-06-10 | |
Well Total Depth: 4140.00 ft | |
Configuration: Vertical | |
Latitude: 41.020000 | |
Longitude: -81.520000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2008-04-08 | Proposed Formations:OHIO SHALE THRU CLINTON, Issued Date:4/8/2008, Expired Date:4/8/2009 6:00:00 AM, Drilling unit acres:21.24, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2008-06-10 | |
Completion Report Received | 2008-09-29 | |
Construction Permit Expires | 2009-04-08 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2008-11-07 | 3927 | 3968 | 41 |
3927 | 3968 | 41 | |
3927 | 3968 | 41 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 15 | 2122 Bbl | 60000 | 1000 GALLONS IC ACID |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | OHIO VALLEY ENERGY SYSTEMS COR | 0.00 | 86.00 | 15 |
2009 | OHIO VALLEY ENERGY SYSTEMS COR | 8518.00 | 1752.00 | 365 |
2010 | OHIO VALLEY ENERGY SYSTEMS COR | 5451.00 | 769.00 | 336 |
2011 | OHIO VALLEY ENERGY SYSTEMS COR | 4500.00 | 566.00 | 365 |
2012 | OHIO VALLEY ENERGY SYSTEMS COR | 3621.00 | 401.00 | 366 |
2013 | OHIO VALLEY ENERGY SYSTEMS COR | 2529.00 | 345.00 | 365 |
2014 | OHIO VALLEY ENERGY SYSTEMS COR | 2019.00 | 232.00 | 365 |
2015 | OHIO VALLEY ENERGY SYSTEMS COR | 1633.00 | 242.00 | 365 |
2016 | OHIO VALLEY ENERGY SYSTEMS COR | 1230.00 | 219.00 | 365 |
2017 | OHIO VALLEY ENERGY SYSTEMS COR | 1132.00 | 93.00 | 365 |
2018 | OHIO VALLEY ENERGY SYSTEMS COR | 418.00 | 172.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 333 | 15 |
2009 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 1238 | 365 |
2010 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 541 | 336 |
2011 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 301 | 365 |
2012 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 272 | 366 |
2013 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 256 | 365 |
2014 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 234 | 365 |
2015 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 264 | 365 |
2016 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 74 | 365 |
2017 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 162 | 365 |
2018 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 31 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1822064016 | 2008-6-12 0:00: | DD | No Violations | |
-183112909 | 2008-6-10 0:00: | DD | No Violations | |
0113639727 | 2008-07-03 | Drill / Deepen / Reopen | No Violations | The site is being graded. The pits have been solidified and covered over. |
0183112909 | 2008-06-10 | Drill / Deepen / Reopen | No Violations | Wildcat is drilling ahead. The pits are fenced, lined and in good condition. |
0367617141 | 2008-06-24 | Drill / Deepen / Reopen | No Violations | The drilling pits have been solidified and covered. |
113639727 | 2008-7-3 0:00:0 | DD | No Violations | |
1137017239 | 2008-06-03 | Drill / Deepen / Reopen | No Violations | The location has been built and the rig should arrive in the next day or two. The ID and permit are posted at the entrance. No violations at this time. |
1213926688 | 2008-06-09 | Drill / Deepen / Reopen | No Violations | Wildcat is drilling ahead. The pits are lined, fenced and in good condition. No violations at this time. |
1214870039 | 2008-06-17 | Drill / Deepen / Reopen | No Violations | The drilling pits have been pumped down and are lined and fenced. No violations at this time. |
1219067594 | 2008-08-11 | Drill / Deepen / Reopen | No Violations | The tank battery is being built and the site has been graded. The well can be turned on as soon as the fence has been installed. |
1229439435 | 2008-12-03 | Preliminary Restoration | No Violations | Preliminary restoration is approved. |
1546214747 | 2008-06-06 | Drill / Deepen / Reopen | No Violations | Wildcat is on location and started drilling. Should be ready to set surface casing late tonight or early tomorrow morning. The pits are lined and in good condition. |
1822064016 | 2008-06-12 | Drill / Deepen / Reopen | No Violations | The drilling pits are fenced, lined and in good condition. No violations at this time. |
367617141 | 2008-6-24 0:00: | DD | No Violations |
For data sources see[9]