34-019-22146

Well Details

Well ID: 34-019-22146
Loading map...
County: Carroll
Municipality:
Operator Name: CHESAPEAKE EXPLORATION LLC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2012-11-26
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 40.64131312
Longitude: -80.96978829

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-12 43075.0 461.0
2013-6 27249.0 455.0
2013-9 64809.0 490.0
2014-3 48213.0 92.0 322.0 92.0
2014-1 39838.0 65.0 514.0 65.0
2014-4 50168.0 92.0 297.0 92.0
2014-2 49439.0 87.0 333.0 87.0
2015-1 37334.0 89.0 315.0 89.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1355421197 2012-11-27 I was on site to witness the cementing of the 13 3/8 surface casing. My inspection revealed that Nomac 43 has drilled a 17.5 hole to a total depth of 794' and ran 792' of 13 3/8 casing. They installed 6 bowspring centralizers on joints 1,2,5,8,11,14. Schlumberger cemented the casing with 722 sacks of Class A (D901) cement with 2% CaCl (S001) , .2% D46, and .125 pound per sack D130 (cello flake). They pumped a 25 barrel gel spacer, 10 barrels of freshwater, and then 154 barrels of cement. The cement had a density of 15.6 pound per gallon and had a yield of 1.2 cubic feet per sack and they used 5.252 gallons of mix water per sack. They displaced the plug with 115 barrels of water and bumped the plug at 22:35 hrs with 288 PSI.There was good circulation throughout the job and 33 barrels of cement was circulated to surface. They conducted the casing integrity test at 1023 PSI; test approved. No violations at this time.
-980054454 2012-11-29 I was on site to witness the cementing of the 9 5/8 intermediate casing string. My inspection revealed that Nomac Rig #43 has drilled a 12 1/4 hole to a total depth of 1625' and ran 1615' of 9 5/8 casing with 13 bowspring centralizers installed on joints 1,2,5,8,11,14,17,20,23,26,29,32,35. Schlumberger cemented the casing with 550 sacks of Class A (D901) cement with 10% Salt (D044),.2% D046 (antifoam),.15% D153 (antisettling), and .125 pound per sack D130 (lost circulation). Schlumberger pumped a 25 barrel gel spacer, a 10 barrel water spacer, and 119 barrels of cement slurry. They displaced the plug with 116 barrels of water and bumped the plug at 14:15 hrs. There was good circulation throughout the job and 23 barrels of cement was circulated to surface. My inspection revealed no violations at this time.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.