X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-121-23995

Well Details

Well ID: 34-121-23995
Loading map...
County: Noble
Municipality:
Operator Name: HUNTER DISPOSAL LLC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2001-10-15
Unconventional: No
Configuration: Vertical
Well Status: Active Injection
Violations: 0
Latitude: 39.65380676
Longitude: -81.47547542

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2001-0 0.0 0.0
2002-0 0.0 0.0
2003-0 22992.0 247.0
2004-0 16054.0 94.0
2005-0 5022.0 27.0
2006-0 0.0 24.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1007606664 2010-01-20 Inspection revealed that pump was in operation during my inspection, noted two Key Energy tankers unloading at facility.

Note: Swabs on center piston in need of replacement and stone is needed on road to unloading pad.

-1010353906 2012-09-18 Inspection revealed that injection pump was in operation today and it was noted that fluid end of pump is in need of replacement it sounds like it has internal problems and needs to be addressed.
-1067095854 2011-02-07 Inspection revealed that injection pump is in operation and it was noted that several vac trucks were at site today unloading brine water.
1071135733 2014-04-23 On the day of my inspection I accompanied Dave Ball. Pressure was 480 lb and the pump was running. No violations noted.
1093786476 2004-08-25 Restoration satisfactory, pits have been filled and location restored and vegatation established.

Rabbit well 1-100bbl located within dike area.

1135757786 2013-02-28 Inspection revealed that injection pump was in operation today and well attendant stated that they were not receiving much water at this time due to weather conditions.
-1154905397 2009-03-04 Inspection revealed that injection pump was in operation during my inspection, noted Key Energy truck unloading at site during my inspection, noted that #2 cylinder piston was dripping a little will notify well owner and discuss pump repair is needed.
1171616172 2010-07-13 On site to witness placing of liner in new proposed water tank storage area,area covered was approximately 125' wide X 100' long and stone was placed on it by slinger truck and dike walls are too be covered also after applying adhesive then stone on top of that.

Note: Liner was 30 mil black plastic.

-1174701335 2012-11-28 Inspection revealed that injection pump was in operation during my inspection and it was noted that several vacuum trucks were waiting to unload at facility .

Note: Walked flow line area to monitor area for potential leaks none were found today.

-1207000141 2010-05-19 Inspection revealed that well is in operation and injection pump was running during my inspection, on site to witness clean up of brine&oil within dike area(tanks ran over) all spillage was contained within dike area and all brine and oil was cleaned up and properly disposed of, instructed well tender to apply a few absorbent pads to area in case any oil became present at site.
1211408293 2008-05-21 Site evaluation for converting to SWIW Permit, inspection revealed existing flow line to permit #4037 located approximately 40' to south of wellhead and wet weather run located approximately 150' to west and small water way 300' to north of well no water wells located within 1000' of site that could be located, remind applicant that road to wellhead will need o be constructed and properly maintained.
1222529978 2008-09-24 On site to witness Producer's Service Corp. spot 1000 gal acid into well bore and pressure test flow line from pump house to wellhead, filled line with H2O and pressured tested 2 plastic coated line pipe to 1680 psi and monitored weld seams for 15 min no leaks detected released pressure and then proceeded to place well into operation.
1223001252 2012-04-17 Inspection revealed that injection pump was in operation today and it was noted that 2 union on plumbing on discharge side of pump is in need of replacement, well tender stated he would shut pump down and repair leaking union and it was also noted that filter transfer pump is in need of seal replacement and well tender stated that they had one ordered.
1223422674 2008-10-07 Operator called and requested that I be present to witness them reapply pressure to annulus of tubing, line to recorder failed and they lost pressure on annulus so they wanted to have pressure reapplied and wanted Inspector present to witness the job being preformed they had Timco's solvent pressure up on annulus with 4 gal H2O with inhibitor added.
-1233527775 2013-01-30 Inspection revealed that injection pump was in operation today and several owned vacuum trucks were at site during my inspection.
1258582921 2009-11-17 Inspection revealed that injection pump was in operation during my inspection,noted that pistons on pump had been recently changed.
1266442843 2010-02-17 On site towitness operator remove bad storage tank and replace with 2-500 bbl storage tanks and replumb and test plumbing for leakage (non noted).

Note:Five Centralas tankers were unloading at facility and two RET vac trucks and 2 EC tankers were at site during my inspection.

1272710821 2010-04-29 Inspection revealed that well is in operation, noted that injection pump had been changed out since my last inspection, new pump is equipped with five cylinders instead of conventional triplex style.
1276554357 2010-06-11 Inspection revealed that well is in operation injection pump was running during inspection.

Note: Both tranfer pumps inside pump house are in need of repair(seals are out on both pumps).

1281490269 2010-08-10 On site to witness acid job being preformed on injection well, Producers Services pumped 2000 gal of 15%acid down well at a rate of 1.4 bpm at average pressure of 1550 psi and displaced with 100 gal water then injection pump was placed back in operation and it appeared that injection pressure was still declining after injection pump was started up will check back tomorrow and recheck pressures at wellhead.
1289040952 2010-11-05 Inspection revealed that Producer's Services were on site performing acid treatment on well they pumped 2000 gal. of 15%acid at a rate of 1.1 bpm and pumped 1700 gal then we shut down and let acid soak for 15 min and then we pumped additional 300 gal and displaced into formation and shut well in too let acid soak they will resume operations later today.
1294264730 2011-01-04 Inspection revealed that pump was in operation during my inspection.

Note: On site to witness owner apply sealant to exterior of dike liner and place stone on it with stone slinger truck they applied seven tandem loads of stone to liner.

1323898655 2011-12-14 Inspection revealed that well was shut down to perform 2000 gallon acid treatment. Producers Services preformed work and flushed tubing. Hunter Disposal personnel hooked well back up and placed the well back into operation.
1326846835 2012-01-17 On site to witness the Boots&Coots snubbing unit run 2.875 tubing into the well to retrieve the faulty packer. They had to wash the tool onto the top of the packer. The Baker Tool representative then released the packer and they let the element relax for 30 minutes. They then started too pull the packer.
1326934377 2012-01-18 On site to witness new packer and tubing run into well. The rig stopped 60' off of setting depth today. They will set the packer tomorrow, then flush annulus and test ithe integrity of casing and tubing.
1327740337 2012-01-27 Onsite to witness setting of packer and testing of tubing annulus. Producers Service pumped 70 barrels water, with inhibitor, down tubing and up backside. Once they had clean fluids at the surface the tubing was reattached to the packer, the packer was set at @ 5575' and testing began. They pressured up to 1830 PSI and they monitored the pressure for 15 min with a 30 PSI decline - test passed. They then pumped 50 barrels down tubing to ensure that they were pumping into formations. They will start rigging down tomorrow and perform an acid job on Monday. I informed the well owner that a variance would need to be applied for since we had to move packer up hole to achieve proper testing.
1328658135 2012-02-02 Well is in operation stopped to check pressures due to fact of recent tubing change in well.

Note: Instructed site foreman to work on getting small leaks in pump house addressed before they become major problems.

1336312850 2012-05-03 Inspection revealed that pump was in operation today and several vacuum trucks were unloading during my inspection.
1343949401 2012-08-01 Inspection revealed that injection pump was in operation during my inspection, it was noted that pump has several leaks that need to be addressed and it was also noted that filter housing and transfer pump is in need of replacement.
-1367839989 2010-03-01 Inspection revealed that injection pump was in operation during my inspection,noted B&D Oil Gathering tanker unloading at facility during my inspection.

Note: Stone has been applied to drive going to unloading pad since my last inspection.

1375898120 2013-08-06 Inspection revealed that injection pump was in operation today and it was noted that storage tanks are being cleaned out this week ad solids are being solidified and hauled to a approved landfill.
1385497600 2013-11-26 Inspection revealed that injection pump was not in operation today and operator stated that storage tanks were nearly empty and they were not expecting very many trucks today due to weather conditions.
1405381784 2014-07-14 On site to witness 2000 gallon acid treatment on well Producers Services pumped acid and displaced it with brine water and they let it soak for one hour before placing well back into operation.
1405552035 2014-07-14 On site to witness Producers Services perform 2000 gal acid treatment on said well.
-1418890895 2012-01-20 I received a call from the well operator that the pressure has risen on the tubing annulus. The packer was set, tested and passed on 1/19/2012. The pressure rose on the tubing annulus overnight and the decision was made to attempt to move packer uphole 4' and reset the packer. They will then test the packer and monitor pressures for an extended period of time to ensure that it is in proper working order.
1426880460 2015-03-20 Producers Services on site to perform 2000 acid treatment on said well they pumped 1000 gallon of acid and displaced it into formation and let soak for one hour and then pumped remaining 1000 gallon and displaced it into formation again and let soak for one additional hour before placing well back into operation.
144038833 2014-10-24 Inspection revealed that injection pump was in operation during my inspection and it was noted that three company vacuum trucks were unloading at the facility during my inspection.
1468069377 2012-01-04 Received call from well operator of said well is showing sign of equalizing pressures told them to shut well down and get service rig on site ASAP to correct problem they stated that rig would be there this afternoon and would be ready to test tubing in morning for possible hole in tubing if not they will pull tubing and packer too find problem.
-1477032340 2013-01-16 Inspection revealed that injection pump was in operation today and tank area was clean and in near future owner will need to perform cleaning of unloading pad.

Note: Curb in front of garage door opening is in need of replacement.

1478070199 2009-02-12 Inspection revealed that injection pump was in operation during my inspection,as noted from last inspection stone is needed on drive to unloading pad vac trucks are tracking mud onto state highway as they exit facility.

Note: B&D oil was unloading brine at facility during my inspection.

-1502004210 2015-05-28 Inspection revealed that injection pump was in operation today and in conversation with operator stating that they were planning on replacing current injection pump in the near future.
-1538136065 2010-05-24 Stopped by well site too check and see if recent acid job on well helped injection pressure it was noted that current pressure was at lowest point it has been in quite some time.
1550157510 2012-06-04 Inspection revealed that injection pump was in operation during my inspection.

Note: New fluid end on injection pump since my last inspection.

1561092856 2010-05-20 On site to witness Producers services preformed acid job on injection well they placed 1000 gal of 15% acid in well and displaced with fresh water into injection zone and shut well in, operator will resume operations 5/21/2010.
-1575556100 2010-04-13 Inspection revealed that injection pump was in operation during my inspection.

Note: Gear end on injection pump showing signs of bearing failure, talked to well tender and he stated that they were planning on changing out pump tomorrow.

1577465112 2014-01-03 On site along with Producers Services to perform 2000 gallon acid job on said well.
1591662479 2013-02-13 Inspection revealed that injection pump was in operation today and facility is in satisfactory condition this inspection.
-1591808433 2015-04-07 Inspection on this indicated that injection pump was in operation and it was noted that several company owned vacuum and tanker trucks were waiting to unload at the facility during my inspection.
1600549545 2008-09-04 On site to witnees operator attempt to retrive lost tools in hole they ran 2.375 tubing in hole with overshot and bumper sub&hydrolic jars and got a hold of tools on first run they will attempt to knock out bridge plug tomorrow if cable company can install new sand line on rig.
-1607557888 2012-01-26 On site to witness the packer and tubing run into the well. The first packer would not test so decision was made to aquire a second packer and run it in well. They plan on setting and testing the new packer tomorrow.
1632639188 2014-09-16 Inspection revealed that injection pump was in operation during my inspection and it was noted that three company owned tankers were unloading at the facility during my inspection.
-16530251 2013-04-10 Inspection revealed that injection pump was in operation during my inspection .

Note: Talked to Rick Zigenfoose concerning restoring pipeline rightaway which they disturbed when they installed new flow line to well during the winter months.

-1670994569 2014-07-08 Inspection revealed that injection pump was in operation during my inspection and it was noted that several company owned vacuum trucks were waiting to unload at facility and there was a third party company on site repairing unloading pad as requested by inspector.
-1748487897 2012-01-05 On site to determine if operator has tubing leak or packer failure they had Baker Tool rep close down hole valve and they pressured up on tubing no pressure decline tubing has integrity, then we pressured up on annulus and pressure declined it was determined that fluids were leaking by packer they are making plans on getting snubbing unit on site to remove tubing and packer and replace packer and tubing next week.
-1826208093 2013-10-16 Inspection revealed that injection pump was in operation today and it was noted that there are several exposed spots on liner that need to be covered with stone and it was noted that there are several 3&4 valves in need of plugs placed in them when not in use and number three cylinder on injection pump is in need of repair and unloading pad is in need of repair as we discussed.
1873522700 2014-12-11 Inspection revealed that injection pump was in operation today and it was noted that three company owned tankers were unloading at the facility during my inspection.
1877858963 2009-12-14 Inspection revealed that owner is currently in process of having storage tanks cleaned out and pump was in operation during my inspection.

Note: Stone is needed on driveway to unloading pad it will help eliminate tracking mud onto state highway and creating safety hazard.

-1891307927 2011-03-15 On site to witness acid job on injection well, Producers Services pumped 2000 gal of 15%HCL into well and we left well shut in and they will resume operations tomorrow.
191109629 2008-12-04 Inspection revealed that pump was in operation during my inspection, well caretaker was changing filter in filter house during my inspection.

Note:three Key Energy trucks were unloading at site during my inspection and one company owned truck was waiting to be unloaded discussed with caretaker future plans on getting stone placed on road to unloading site to help on tracking mud out onto state route 821.

-1948211525 2011-12-19 Stopped by site to check with operator to comfirm that they were making plans on building up back wall of unloading pad too secure water from going over back wall and getting in to local stream.
-1966013636 2015-02-05 Inspection revealed that injection pump was in operation during my inspection and it was noted that one company owned tanker was unloading at the facility during my inspection.
1969175373 2009-09-18 Inspection revealed that well is in operation,pump was in operation during my inspection and company truck was unloading at facility during my inspection.

Also noted that stone has not been applied to lease road as suggested on my last inspection.

1984160823 2010-10-06 Inspection revealed that pump was not in operation during my inspection, noted that new pump house is nearly constructed and storage tanks have been painted and according to well tender stone for covering liner is too be applied in the near future.
2040766803 2013-07-17 On site to witness Producers Services perform acid job on well they pumped 2000 gal of 15% acid and then displaced it into formation and let it soak for 15 minutes then resumed displacement of fluid into formation average treating pressure was 1640 psi and ISIP was noted@1140 psi and after 10 minutes it was 1117 psi,rigged down Producers and operator was going to let well rest the remainder of the day before they start to injecting fluids again.
2043421804 2008-10-02 No violations noted ,facility appears to be in satisfactory condition this inspection.

Pump was in operation during my inspection,disturbed area around wellhead has been graded and seeded&mulched awaiting vegetation to be established old production tank site has been graded and seeded&mulched also,well owner still needs to place stone on lane to wellhead.

-2133566655 2014-04-23 Inspection revealed that injection pump was in operation today and it was noted that several tankers were waiting in line preparing to unload at facility.
256642301 2009-08-14 Inspection revealed that well is in operation, injection pump was running during my inspection.

Note: 1/4 valve on tubing is in need of replacement and driveway needs to be graded and stone applied to help minimize tracking mud etc.. Out onto state highway.

273405765 2011-05-19 On site with Tom Tomastik to inspect well site.

Note: Driveway needs more stone and access road to wellhead needs to be maintained.

280413014 2012-10-23

Inspection revealed that injection pump was in operation during my inspection and it was noted that company owned vacuum trucks were unloading at facility during my inspection. Note: Took water sample from pump house and took to lab to be analyzed.

-361736519 2012-01-23 On site to witness the operator try and move packer. Setting depth of packer is 5684'. They were unable to move it today due to downhole conditions. They will attempt to release and reset packer tomorrow. Zero pressure was left on the annulus today and they will check pressure tomorrow to determine if packer is leaking,
-362983007 2010-07-20 Inspection revealed that injection pump was in operation during my inspection, noted that seals on transfer pump is in need of replacement and pump house is in need of a good cleaning.
383651968 2008-09-17 On site to witness operator run Packer&new 2.875 into well,Baker Set Lock type packer with down hole shut off valve overall BHA is 20.50' longtotal tubing in hole is 5760.15' packer setting depth is 5743',tested annulus of tubing@1680 psi and monitored pressure for 15 min with no decline in pressure blee pressure on annulus to 500 psi and left well shut in awaiting foe acid job to be preformed and testing of flow line at later date before placing well into operation.
399130625 2010-11-03 Inspection revealed that well is in operation and pump was in operation during my inspection, noted that new pump house is nearly completed and once completed they will move pumps to new facility and place them into operation.
-410383361 2012-01-30 On site to witness Producers Services perform acid job on said well they pumped 500 gal of 20% and 1500 gal of 15% acid into well and displaced it into formations and let soak for 30 min and then proceeded to displace into formation at a rate of 1.2 bpm with 50 bbl of fresh water pressure was noted@1300 psi and after shutting well in it was noted @1080 psi then job was complete and Producers rigged down equipment and well was placed back into operation.
-415386596 2009-12-28 Inspection revealed that well is in operation and pump was running during my inspection.

Note: All storage tanks have been cleaned out and sludge hauled to approved site, need stone on driveway to unloading pad.

-453832949 2011-06-20 Inspection revealed that pump was in operation during my inspection it was noted that 2 valve on wellhead needs to be replaced and restoration work around facility needs to be finished in the near future.
478374554 2008-11-04 No violations noted, facility appears to be in satisfactory condition this inspection.

Note: Proper signage is required at location by the road and stone is needed on lane going too said well.

-487316344 2014-04-11 Inspection revealed that injection pump was in operation during my inspection and it was noted that several company owned vacuum trucks were waiting to unload at facility during my inspection.
-498762838 2011-08-30 Inspection revealed that injection pump was in operation during my inspection and it was noted that pump is in need of having packing replaced on pump and several leaks on plumbing was pointed out to operator that needs to be fixed ASAP.
503432940 2004-01-02 No violations noted,rabbit well location will need to be seeded &mulched when work is completed on disposal well next too this existing well.
524226825 2011-04-04 Inspection revealed that injection pump was in operation today.

Note: Stone is needed on driveway to unloading facility to help cut down on tracking mud onto state highway and also restoration work around new pump house and surrounding area needs to be completed as soon as weather permits.

530109804 2015-01-05 Inspection revealed that injection pump was in operation during my inspection and it was noted that three company owned vacuum trucks were unloading at the facility on this day of my inspection.
554229073 2013-12-20 Inspection revealed that injection pump was in operation and it was noted that four company owned vacuum trucks were unloading at facility during my inspection.
-596616002 2014-06-03 Inspection revealed that injection pump was in operation during my inspection and it was noted that several company owned vacuum trucks were unloading at facility during my inspection.
-634337737 2009-10-27 Inspection revealed that injection pump is in operation it was running during my inspection, noted a small seep on injection pump will inquire about it with operator and have him repair.

Note: More stone is needed on drive going to unloading pad it will help cut down on tracking mud onto highway and reduce risk of causing potential hazard at site.

697443642 2011-01-14 On site to witness testing of new poly flow line they pressured up line to 300 psi and waited required interval and then applied more pressure to line and again waited required interval, once we acquired 1800 psi we monitored pressure for 15 min with no decline in pressure.
700037772 2009-04-28 Inspection revealed that well is in operation, injection pump was in operation noted two Key Energy trucks unloading at site during my inspection and also there was a crew applying seed&mulch to area around pump house.
-710280961 2010-09-09 Inspection revealed that well is in operation and upgrades at facility are progressing, new tanks have been installed and a new pump house is being built and new poly flow injection line will be put into place in the near future.
-711904290 2011-02-22 Inspection revealed that well was not in operation today,talked to well tender and he stated they have brine haulers coming to site later today to unload.
74062113 2015-02-24 Inspection revealed that injection pump was in operation today and it was noted that there was several company owned vacuum trucks waiting to unloading at the facility during my inspection.
-799488934 2012-10-30 Inspection revealed that injection pump was in operation today and there were several company owned vacuum trucks unloading at facility during my inspection.
835876322 2009-01-05 Inspection revealed that well is in operation.

Note: Pump was not in operation during my inspection, noted that stone is needed on road to unloading pad to help minimize tracking mud out onto state highway when brine trucks are leaving facility.

860190599 2014-11-10 Inspection revealed that injection pump was in operation during my inspection and it was noted that one Hall Drilling vacuum truck was unloading and one company owned vacuum truck was on the unloading pad during my inspection and it was noted that one of the storage tanks is being cleaned out so owner can replace valves on the bottom of the storage tank.
-915066175 2013-06-04 Injection pump was in operation today and it was noted that two company owned vacuum trucks were unloading at facility during my inspection.
-92346585 2013-09-19 Inspection revealed that injection pump was in operation today and it was noted that unloading pad is in need of repair it has encountered cracks in concrete and they will need to be repaired ASAP to prevent any seepage from pad from entering fresh water strata.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.