Well ID: 34-155-24052 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.1535748,"lon":-80.61334206,"icon":""}]} |
County: Trumbull | |
Municipality: | |
Operator Name: PAC DRILLING LLC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2012-01-16 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 41.1535748 | |
Longitude: -80.61334206 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-0 | 15805.0 | 965.0 | ||||
2013-0 | 15536.0 | 723.0 | ||||
2014-0 | 13280.0 | 360.0 | 495.0 | 360.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1330528435 | 2012-01-10 | The well location was under construction and the blow pit had been excavated. All conditions were acceptable. | ||||
1346865092 | 2012-09-05 | I completed an Urban Preliminary Restoration inspection. My inspection found the well surrounded by a chain link fence and equipped with a plunger lift unit (rabbit). The tank battery was surrounded by a chain link fence and contained one 210 barrel storage tanks, one 50 barrel brine storage tank, the proper identification posted, and a separator. The production equipment had the proper spacing, the pit were closed, and all the debris removed. The site has been graded and seeded to prevent erosion and sedimentation. Inspection passed. | ||||
1393018518 | 2012-01-17 | The blowout preventer held 400 PSI for 15 minutes without loss and passed test. | ||||
295248186 | 2012-01-22 | The production casing was successfully cemented with 200 sacks of Unitropic cement. The cement operation and site conditions were acceptable. | ||||
308464393 | 2012-01-17 | The installation and cementing of surface casing was witnessed. Cement operation and site conditions were acceptable. | ||||
-756822428 | 2012-02-02 | The contractor was mixing two truck loads of dust into the drilling pits. All conditions were acceptable. |