Well Details

Well ID: 34-155-24052
Loading map...
Country: United States
State: Ohio
County: Trumbull
Municipality: Hubbard Township
Operator Name: PAC DRILLING LLC
Well Pad ID:
Farm/Lease Name: FILICKY
License Status: Producing
License Date: 2012-01-05
Spud Date: 2012-01-16
Spud Drilling Contractor: G & H DRLG
Final Drill Date: 2012-01-21
Well Total Depth: 5354.00 ft
Configuration: Vertical
Latitude: 41.150000
Longitude: -80.610000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-01-05 Proposed Formations:CLINTON/MEDINA, Issued Date:1/5/2012, Expired Date:1/4/2014 12:00:00 PM, Drilling unit acres:41.45, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2012-01-21
Completion Report Received 2012-06-21
Construction Permit Expires 2013-01-04
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2012-07-16 5026 5030 5
2012-07-16 5042 5044 3
5026 5030 5
5042 5044 3
5053 5085 33
5026 5030 5
2012-07-16 5053 5085 33

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2012-01-26 H2O 20 136093 Gal 50000 Universal Well Services Inc.
2012-01-26 H2O 20 136093 Gal 0 Universal Well Services Inc. 500 sacks of sand

No problems were encountered.

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2012 PAC DRILLING LLC 15805.00 965.00 296
2013 PAC DRILLING LLC 15536.00 723.00 365
2014 PAC DRILLING LLC 13280.00 495.00 360
2015 PAC DRILLING LLC 10981.00 288.00 360
2016 PAC DRILLING LLC 7754.00 255.00 359
2017 PAC DRILLING LLC 6509.00 249.00 359
2018 PAC DRILLING LLC 6341.00 339.00 359

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2012 PAC DRILLING LLC Brine 104 296
2013 PAC DRILLING LLC Brine 37 365
2014 PAC DRILLING LLC Brine 14 360
2015 PAC DRILLING LLC Brine 41 360
2016 PAC DRILLING LLC Brine 0 359
2017 PAC DRILLING LLC Brine 0 359
2018 PAC DRILLING LLC Brine 0 359

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-152402007 2018-5-21 0:00: UP No Violations
-1734047941 2017-3-13 0:00: UP No Violations 0.60
-186385100 2019-2-4 0:00:0 UP No Violations 0.40
-722122340 2015-9-4 0:00:0 PW No Violations 1.00
-756822428 2012-2-2 0:00:0 UD No Violations
0152402007 2018-05-21 UrbanProduction Wells Violations Noted At the time of this inspection, the well was equipped with a plunger lift assembly. The annulus and flow line valves were open. A domestic gas supply was plumbed off of the wellhead with an open ball valve, a regulator, 3 inch drip tank and gas meter. There was identification posted at the well. No fencing was installed around the well, due to a pre-site waiver. The diked tank battery has two storage tanks and a separator. The 50 BBL poly tank had a leak at the hammer union on the dump line. The leak needs repaired. The pick-up lines have plugs and locks. The 210 BBL tank was missing the required urban safety equipment and needs installed per 1501:9-9--e). There was an identification sign posted at the tank battery. The identification sign was missing the required information per 1501:9-9-05(E)(1)(a-e). A locked chain link fence surrounds the tank battery. The 210 BBL tank extends more than 3 foot above the fencing. Raise the fencing around the tank battery or use low profile tanks to be in compliance with 1501:9-9--site inspection. Install the required gate with a lock at the access road entrance per 1501:9-9--9-
0186385100 2019-02-04 UrbanProduction Wells No Violations I conducted a compliance notice follow-up inspection for compliance notice 152402007, requiring multiple compliance issues involving urban requirments. At the time of this inspection, the hammer union on the dump line of the 50 BBL poly tank has been repaired. The 210 BBL tank was still missing the required urban safety equipment and needs installed per 1501:9-9-05E(4)(b-e). There was an identification sign posted at the tank battery that has been amended with the required information per 1501:9-9-05(E)(1)(a-e). A locked chain link fence surrounds the tank battery. The 210 BBL tank extends more than 3 foot above the fencing. Raise the fencing around the tank battery or use low profile tanks to be in compliance with 1501:9-9-05E(4)(f). There was no landscaping around the tank battery, however the tank battery was located in a wooded area. No gate has been installed at the entrance. The gate was not waived during the pre-site inspection. Install the required gate with a lock at the access road entrance per 1501:9-9-05E(2), and post the proper identification sign on the access road gate per 1501:9-9-05E(1)(f).

PAC needs to: 1) Install the required urban safety equipment on the 210 BBL production tank and needs installed per 1501:9-9-05E(4)(b-e). 2) Raise the fencing around the tank battery or use low profile tanks to be in compliance with 1501:9-9-05E(4)(f). 3) Install the landscaping around the tank battery. 4) Install the required gate with a lock at the access road entrance per 1501:9-9-05E(2), and post the proper identification sign on the access road gate per 1501:9-9-05E(1)(f).

0295248186 2012-01-22 Urban Drill / Deepen / Reopen No Violations The production casing was successfully cemented with 200 sacks of Unitropic cement. The cement operation and site conditions were acceptable.
0308464393 2012-01-17 Urban Drill / Deepen / Reopen No Violations The installation and cementing of surface casing was witnessed. Cement operation and site conditions were acceptable.
0722122340 2015-09-04 Production Wells No Violations I was on location for a status check. During my inspection, I found the well in production. The well is equipped with plunger lift assembly. The tank battery consists of a 210 barrel production tank, a 50 barrel, poly brine tank, and a vertical, mechanical separator. There is dike around the tank battery. An identification sign is posted. There is no urban safety equipment on the production tank. There are locked, chain link fences surrounding the well and tank battery. The lease road is in stable condition. I called and spoke with PAC Drilling. I instructed PAC to immediately install the proper urban safety equipment on the production tank. Follow-up inspections will be conducted.
0756822428 2012-02-02 Urban Drill / Deepen / Reopen No Violations The contractor was mixing two truck loads of dust into the drilling pits. All conditions were acceptable.
1330528435 2012-01-10 Urban Drill / Deepen / Reopen No Violations The well location was under construction and the blow pit had been excavated. All conditions were acceptable.
1346865092 2012-09-05 UrbanPreliminary Restoration No Violations I completed an Urban Preliminary Restoration inspection. My inspection found the well surrounded by a chain link fence and equipped with a plunger lift unit (rabbit). The tank battery was surrounded by a chain link fence and contained one 210 barrel storage tanks, one 50 barrel brine storage tank, the proper identification posted, and a separator. The production equipment had the proper spacing, the pit were closed, and all the debris removed. The site has been graded and seeded to prevent erosion and sedimentation. Inspection passed.
1393018518 2012-01-17 Urban Drill / Deepen / Reopen No Violations The blowout preventer held 400 PSI for 15 minutes without loss and passed test.
1547660380 2020-3-31 0:00: UP No Violations
1734047941 2017-03-13 UrbanProduction Wells No Violations

--up lines have plugs, but are missing locks. The 210 bbl. storage tank is missing the required urban safety equipment. There is an identification sign posted at the tank battery. The identification sign is missing the required information per 1501:9-9-05(E)(1)(a--site inspection.

PAC needs to: 1) Correct the identification sign to be in compliance with 1501:9-9--e) at the tank battery with: Well owners address and phone number Property street address or nearest address to the access road entrance. 2) Raise the fencing around the tank battery or use low profile tanks to be in compliance with 1501:9-9- 3) Install the require gate with a lock at the access road entrance per 1501:9-9- 4) Post the proper identification sign on the access road gate per 1501:9-9- 5) Install locks on all pick-up lines or remove the handles per 1501:9-9- 6) Install urban safety equipment on the production tank as required by 1501:9-9--e): Activated charcoal filters. Functioning low-pressure relief valve. Tank hatch lids sh

295248186 2012-1-22 0:00: UD No Violations
308464393 2012-1-17 0:00: UD No Violations

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
0152402007 US-OH-114546 2018-05-25 9-05E1 ID (a-i)
0152402007 US-OH-114547 2018-05-25 9-05E2 FENCING (a-d)
0152402007 US-OH-114548 2018-05-25 9-05E4 TANKS (a-i)
0152402007 US-OH-114549 2018-05-25 9-9-05(A)9 No SPCC dike/or failure to keep dike free of water or oil

For data sources see[9]

References