34-055-20773

Well Details

Well ID: 34-055-20773
Loading map...
County: Geauga
Municipality:
Operator Name: PETROX, INC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 1984-06-10
Unconventional: No
Configuration: Vertical
Well Status: Active Injection
Violations: 0
Latitude: 41.60286567
Longitude: -81.02072239

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1050582730 2005-02-15 Pressure in compliance. Phone Call
1050582730 2005-02-15 Pressure in compliance. Phone Call
1050582730 2005-02-15 Pressure in compliance. Field Visit or Inspection
1050582730 2005-02-15 Pressure in compliance. Phone Call
1050582730 2005-02-15 Pressure in compliance.
1050582730 2005-02-15 Pressure in compliance.
1050582730 2005-02-15 Pressure in compliance.
1050582730 2005-02-15 Pressure in compliance.
1050582730 2005-02-15 Pressure in compliance.
1050582730 2005-02-15 Pressure in compliance.
1050582730 2005-02-15 Pressure in compliance.
1050582730 2005-02-15 Pressure in compliance.
1050582730 2005-02-15 Pressure in compliance.
1050582730 2005-02-15 Pressure in compliance.
-1078643233 2014-12-26 The valve on the tubing/casing annulus was frozen. No violations were found at the time.
-1084737270 2009-07-14 Checked tank battery and well pressures.
1090249002 2004-07-19 on site to status check site . Checked well head unable to get to gaeuga to turn on gate locked .checked inside tank battery combo 2843.No violation found at time of inspection.
1123000203 2005-07-26
1179886596 2013-08-29 My inspection of the well and injection facility found no violations.
-1198281731 2012-06-29 My inspection today found: The well shut down above it's allowable limits and no one on site. The area around the well, disturbed during well work over, has been graded. Seeding needs to take place. Operator will be contacted in regards to the well being 10psi over it's allowable limit.
1242700925 2012-03-28 My inspection of this well site found the well in operation and the pressure on the annulus was 0 PSI. The injection pressure was recorded using a Division of Oil and Gas gauge. Pressure fluctuated between 700 and 860 PSI. The gauge needle was bouncing to the point an accurate reading could not be obtained. When I shut the valve, the pressure on the gauge was at 860 PSI. There was standing water around the well head which I tested for Chlorides and registered 97 PPM. The Chlorides are residual from a well workover conducted over the winter. There was standing water behind the south end of the tank battery covering a brine scald. I tested this water for Chlorides and it tested at 6808 PPM. It appears the well tender was siphoning the dike free of both standing water and released brine. I contacted JR, who tends the well, and I informed him that the well is at it's maximum pressure, to shut down and check pressure. The brine scald area outside of the tank battery needs removed and the area reclaimed. He stated that he was on his way and that the switch on the pump may need changed. I notified him that these missues must be addressed immediately.
1250i226 2002-05-15 Check U.I.C. facility.
1250i252 2002-09-04 Check U.I.C. facility.
1270734432 2010-04-07 well in complance pressure(700)
-1276022014 2004-09-15
1281635773 2010-07-22 Well tender on site working on maintained of the well. Well man door was locked at the time of inspection. Operator will be getting me a key. Well site was in good repair.
1292960404 2010-12-21 Well was in operation. Lease road was open up to the storage area. Well location had 1.5' of snow on it. Injection pressure 40 PSI, 4.5 casing annulus pressure was 530 PSI. Man door to the well was locked. Identification signs were posted.
1300471222 2011-03-18 Injection pressure of 20 PSI. Annulus pressure of 220 PSI. Samples of the standing water in the dike were collected and tested: Chlorides = > 631 PPM and pH = 8.4 on a low range Quantab. JR, operator of the well, has been pumping standing water into the storage tanks. Replacement tank is on location, out side of the tank battery. Operator is continuing to improve facilities.
1309199044 2011-06-27 Well is operating. Operator has two of the 210BBLs in the battery cut and cleaned.. Two 210 BBl tank shave been painted. Two new tank on site. Spoke to JR, they will be working over the battery after the holiday. New stone for the floor of the battery and new tanks. New identification signs posted at the entrance of the site, at the battery and on the wellhead. Unable to take injection pressure, lock was frozen. Contacted JR, he will replace lock. Operator mowed lease road and area around well. Dike is in good repair, operator will be brining a load of soil in to cover exposed sections of the liner.
1312982879 2011-08-09 Annular pressure was 700 PSI and injection pressure was 570 PSI. Operator has reconfigured tank battery. Loading pad was clear of water and debris. Dike was in good repair. Stone in the battery is stained with rust. Operator has a sump, with a pump, in the south east corner of the dike Discharge for the pump is plumbed into a storage tank. Valves had threaded plugs in them.
1317312524 2011-09-29 Met JR on location. Tank battery has standing water in it from the recent heavy rains. Tested chlorides of the water inside the dike area. Clorine = 336 PPM. Operator can discharge water. Tank battery is in good repair. Identification sign is posted. Off loading pad has been steam cleaned. Sump is clear and able to function. Injection well was not operating this day. Lease road is stable. Operator has installed a lease road gate. Load lines were locked. Man door to the tank battery has a lock installed on it.
1320784573 2011-11-08 Well is not operating. The operator has a load of tubing on location as well as equipment for well servicing. Free water in the tank battery was contained by the sump. Vegetation around the perimeter of the battery needs mowed.
1320950370 2011-11-10 Service rig is on location and the tubing has been pulled from well. New tubing is on site. Dropped off completion report information for the operator in their mailbox.
1321452143 2011-11-15 Operator has tripped the reconditioned Baker Lockset packer into the hole. The operator circulated the inhibitor bottoms up and the packer was set at 3304'. Tubing (2.375, R-3 4.75 lb) was set at 3300'. The operator pressured up the annulus to 780 PSI and tested pressure at 5 minute and 15 minutes with no drop in pressure. Passed the Mechanical Integrity Test (MIT). The work pit was lined and the pit fluids were pumped into a water truck after work was completed. On the previous service day it was believed that the lower section of perforated zone sanded in. The operator had circulated on the well to clean sand from perforations on 11/14/11. On that date they had 17' of open perforations. The operator had planned to attempt to clean additional sand out of the hole but felt they had enough perforations open to operate the well.
1325090983 2011-12-27 Annulus pressure was zero. The tubing pressure, when tested, was zero. There was a small amount of flow when testing for vacuum. There was a bull plug on the left hand side of shut off valve on annulus which was not tight. The shut off was threaded tight on the annulus. The fence around the wellhead, which was taken down when operator serviced the well, has not been repaired.
1335356617 2012-04-23 My inspection today found no violations. The annulus pressure on the well was 300 PSI. The injection pressure was 500 PSI. The well was not operating at the time of my inspection. The area around the wellhead, which had been disturbed by working over the well during the winter, has been graded. This area is barren at this time and it may need to be limed, fertilized and seeded if vegetation does not reestablish itself. The brine scald, found south of the tank battery dike during previous inspections, has been bio-remediated and vegetation has started to reestablish itself. The lease road gate was locked at the time of inspection.
1342104637 2012-07-11 My inspection of the well site and injection facility was accompanied by another inspector, Tom Hill.

Brine was dripping from a union at the well head.

Brine was pooling on the unloading pad.

The well tender was instructed to fix the leak and cl

1364750994 2013-03-29 My inspection found the well was not being operated at the time I was on location. Tubing pressure was at 0 psi and the 4.5 was at 575 psi. The pressures were recorded using a Division of Oil and Gas guage. The tank battery was surrounded by a proper dike and a chain link fence. The tank battery consisted of six 210 BBL tanks and three 300 BBL frac tanks. The building that houses the pumping equipment was inside the dike as well. The proper identification was located on the tank battery. The lease road was in stable condition. No violations found at time of inspection.
1380025732 2013-09-24 My inspection found the annulus valve was open. The casing pressure to be 760 psi. The tubing pressure was at 0 psi. The well was not being operated at the time of inspection. Nothing else had changed since my last inspection. No violations to report.
1387297860 2013-12-17 My inspection found the annulus valve was open. The 4.5 casing pressure was 760 psi. The tubing pressure was at 0 psi. The well was not being operated at the time of inspection. Nothing else had changed since my last inspection. No violations to report.
1394114976 2014-03-06 My inspection found the annulus valve was open. The 4.5 casing pressure was 760 psi. The tubing pressure was at 0 psi. The well was not being operated at the time of inspection. Nothing else had changed since my last inspection. No violations to report.
1480667397 2012-07-17 I inspected the site to check the status of the annulus pressure. Inspection on 06/29/12 found the annulus pressure to be zero. Inspection on 07/11/12 found the annulus pressure to be 750psi. On this day the annulus pressure was 720psi. I call J.R. the well tender and left a message requesting that he releive the pressure on the annulus to 250psi. If annulus pressure increase, further assesment of the well will be needed. I also asked him to call me and let me know if he charged the annulus, this would explain the increase in pressure. The loading pad was free of water and brine. The lease road gate was locked. Bull plug has been placed in the 1/4 inch valve.
-1511995788 2012-07-11 My inspection today found: The salt water injection well within it's allowable limits. A hammer union, before the well head, was dripping brine. The annulus has two valves on it. The first valve is a 2 inch ball valve and the second valve is a 1/4 inch ball valve. The 1/4 inch ball valve leaks. An absorbent pad was placed under the valve after testing. There is a barren area south of the well, the area is approximately 50 feet by 100 feet. The barren area is from the well being worked over when the soil was soft. Brine scalding is evident in the barren area and there is iron and salt staining. There is wildlife tracks and areas where they have scrapped the ground on the barren area. The loading pad and sump had standing water in it. The water in the loading pad tested over 4000ppm chlorides. I contact J.R., the well tender, and advised him to lime, fertilize and seed the barren area. The 1/4 inch valve needs a plug, a needle gauge installed on it or replaced. Loading pad needs water removed from it. Per J.R., he was planning on bringing brine truck over this day to unload the pad. The land owner walked over and meet with me after the inspection. He asked about seeding and repairing the area around the wellhead. I informed him that it's being addressed. The land owner asked about constructing a pond behind the tank battery. I informed him that he should speak to the company and Call Before You Dig.
-1544671900 2004-11-16 On site checked well status
1622686319 2006-05-10 on site to check well pressure.
1701629374 2008-05-29 no violatio of UIC.
-1745755834 2006-10-10 well in compliance
-1831207852 2006-07-12 no violation at time of inspection
-183820628 2012-10-26 My inspection of the injection facility and well found no violations.
184381459 2012-07-11 FOLLOW UP TO NOV # -2106136306 FOLLOW UP TO NOV # 1342104637 My inspection of the well site was accompanied by another inspector, Tom Hill.

Brine was dripping from a union at the well head.

Brine was pooling on the unloading pad.

The well tender was instructed to fix the leak and clean off the unloading pad.

-1856538865 2014-05-16 An inspection of the well and injection facility found no violations.
1884172925 2007-09-10 no violation.
-1919037749 2014-09-23 An inspection of the well and injection facility found no violations. A new gauge and valve were installed on the tubing. The well was fenced-in and the gate was locked.
2059367429 2011-10-18 Annulus and injection pressures were over the limit of the 1000 PSI ODNR issue gauge. The needle gauge that the operator had on site read over 1100 PSI. Spoke to JR, the well tender who was on site. He stated that 150 barrels of fresh water had been put down the hole and that caused the over pressure of the injection. 1. Injection well is to be shut down and pressure relieved. 2. Once annulus has equalized with the tubing an MIT test must be completed and passed before injection well can go back into production. Spoke to JR on 10/20/11. He stated that the operator is going to get a service rig on site, pull tubing, replace tubing and inspect packer. Inspector will need to witness activities.
-2106136306 2012-07-11 FOLLOW UP TO NOV # 1342104637 My inspection of the well site was accompanied by another inspector, Tom Hill.

Brine was dripping from a union at the well head.

Brine was pooling on the unloading pad.

The well tender was instructed to fix the leak and clean off the unloading pad.

2137333294 2012-08-22 My inspection of the well site and injection facility found no violations. The pump was off at the time.
349466828 2003-10-07 no violation
372455924 2011-11-14 At the time of inspection operator had completed tripping out tubing and had circulated on well. Operator felt that the well had sanded in. They only had 17 feet of open perfs. They were not able to circulate out any sand. Impression block may be ran on Wednesday.
-403556584 2004-05-03 well back in field annulus psi 450/tubing psi not receving brine at time of inspection.
-44545181 2009-02-03 No violation In compliance
-509763392 2015-03-30 My inspection found the annulus valve was open. The 4.5 casing pressure was 760 psi. The tubing pressure was at 250 psi. The well was not being operated at the time of inspection. No changes since my last inspection. No violations to report.
513467342 2002-12-06 Check U.I.C. facility.
718050614 2005-05-17 pressures in compliance.
727979154 2007-02-20 not active
-738004149 2008-01-30 well in complance.
-789101302 2013-06-28 My inspection found the annulus valve was open. The casing pressure to be 725 psi. The tubing pressure was at 0 psi. The well was not being operated at the time of inspection. Nothing else had changed since my last inspection. No violations to report.
840145097 2008-07-15 no violation
-846923724 2005-10-04 no violation
UIC1409 1993-05-11 1509.22 (A) (2) STORAGE
UIC1410 1993-05-11 1509.03 RULES
UIC1411 1993-05-11 1501: 9-3-05 (A)(6) CONSTRUCTION
UIC491 1988-01-25 42073.54792
UIC492 1988-01-25 42131.54792
UIC493 1988-01-25 42129.54792
UIC494 1988-01-25 1509.22 (C)(3)
UIC942 1990-07-09 1509.22 (A) (1) (2) STORAGE & DISPOSAL
UIC943 1990-07-09 1501.9-3-05 (A) (6) CONSTRUCTION & CONVE
UIC944 1990-07-09 1501. 9-03-04 (A) PREVENT OF CONTAMINA