If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-019-22486 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.60663338,"lon":-81.08423139,"icon":""}]} |
County: Carroll | |
Municipality: | |
Operator Name: R E GAS DEVELOPMENT LLC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2013-10-04 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 40.60663338 | |
Longitude: -81.08423139 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2014-3 | 72136.0 | 42.0 | 7604.0 | 42.0 | ||
2014-4 | 93678.0 | 92.0 | 8070.0 | 92.0 | ||
2015-1 | 62574.0 | 90.0 | 4940.0 | 90.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1382369851 | 2013-10-21 | I was on site to witness the cementing of the 13 3/8 inch surface casing. My inspection revealed that Sidewinder Drilling Rig # 63 has drilled a 17.5 inch hole to a total depth of 1016 feet and ran 1015 feet of 13 3/8 inch (54.5 pound per foot/ inside diameter of 12.615 inches) casing into the wellbore. They installed 8 centralizers on the casing string (on joints 1,2,6,10,14,18,22,25). Universal cemented the casing with 802 sacks of Type 1 3% CaCl, 0.2% foam check, and 1/4 pound per sack flake. They pumped 171 barrels of cement slurry, pumped 149 barrels of displacement, and there were 31 barrels of cement returns to surface. Plug bumped at 4:20pm and they pressured up on the casing. Universal released the pressure and the floats held. My inspection revealed no violations at this time. | ||||
1382595860 | 2013-10-24 | I was on site to witness the cementing of the 9 5/8 inch intermediate casing. My inspection revealed that Sidewinder Rig # 63 has drilled a 12 1/4 inch hole to a total depth of 2045 feet and ran 2045 feet of 9 5/8 inch casing (40 pounds per foot / inside diameter 8.835 inches). They installed 14 centralizers on the casing string ( on joints 1,2,6,10,14,18,22,26,30,34,38,42,46, and 47). Universal cemented the casing with 635 sacks of Gas Block 2% CaCl and 0.15% CR3. The cement had a density of 15.7 pounds per gallon, a yield of 1.29 cubic feet per sack, and they used 5.54 gallons of mix water per sack. Universal pumped 146 barrels of cement slurry, pumped 154 barrels of displacement, and there were 34 barrels of cement returns to surface. They bumped the plug with 1000 psi and increased the pressure to 1520 psi. to check the plug and casing integrity. Note: The pressure held and the test was approved. My inspection revealed no violations at this time. |
For data sources see[2]