X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-119-28742

Well Details

Well ID: 34-119-28742
Loading map...
County: Muskingum
Municipality:
Operator Name: BYERS DONALD OIL & GAS LLC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2011-09-22
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 40.15940155
Longitude: -82.15385497

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-0 0.0 2143.0
2013-0 0.0 1041.0
2014-0 0.0 365.0 668.0 365.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1045297275 2011-11-01 Rig was drilling at depth of 1560' in the Big Cinnamon. They drilled into this formation at 1510'.
1131961116 2012-01-09 On day of inspection B&J cable rig set 5.5casing for production.Cemenco set cement in place .Good circulation.Set pipe above formation and rig will drill thru and produce open hole or thru liner.
116613770 2011-10-04 Rig set surface casing. Cemenco cemented casing with good circulation established.
1327464595 2012-01-05 On day of inspection Drilling rig is at a depth of 3045'.Rig is presently drilling in the Gray Shale.
-1460442325 2011-10-21 Stopped by rig and they had left for the week end. No violations noted .
1536972854 2011-11-25 Drilling at depth of 2400'.Still into lime.
-1642979960 2012-01-20 On day of inspection cable rig was drilled to total depth of 3117'. Operator was sand pumping well.Rig operator stated that frac was on 1-23-12 at 8:00am.
-277689669 2011-12-28 On day of inspection rig is at depth of 2960'.Bottom of lime is at 2895.
-442979429 2012-01-13 On day of inspection cable rig was drilling at a depth of 3080'.Started into the clinton formation.
452883776 2011-09-28 On day of inspection the rig is drilling 10 hole. The rig spudded on 9-22-11.
543044510 2011-11-18 Drilling into the Big Lime at depth of 2190'. Top of the Big Lime is at 2005'.
687894524 2012-09-14 Preliminary Restoration has passed on 9-14-12 by Patrick Shreve. Well is equipped with artificial lift system and two 100 barrel tanks. Dike and id are in place.
-764391486 2011-10-11 Rig is drilling through the Berea at a depth of 743'.
809707426 2011-12-01 Drilling at depth of 2575'.Still in the lime.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.