Well ID: 34-133-24419 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.02713218,"lon":-81.12918969,"icon":""}]} |
County: Portage | |
Municipality: | |
Operator Name: ORION PETRO CORP | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2011-09-12 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 41.02713218 | |
Longitude: -81.12918969 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2011-0 | 0.0 | 0.0 | ||||
2012-0 | 1613.0 | 347.0 | ||||
2013-0 | 1180.0 | 359.0 | ||||
2014-0 | 863.0 | 365.0 | 123.0 | 365.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-1000262820 | 2011-09-17 | I witnessed the cementing of 4.5 casing by Petroset on Poulson rig #10. There were no violations at this time. | ||||
-134548978 | 2011-11-09 | The top soil on the drilling location has been rough graded. There were no violations at this time. | ||||
2011910702 | 2011-09-12 | I performed a rig inspection on Poulson's rig #10. The rig crew were running into the hole with 11.75 conductor. This inspection satisfies 1501:9-9-03. There were no violations at this time. | ||||
-2124167844 | 2011-09-13 | I performed an inspection on Poulson rig #10. The rig were drilling an 11 hole on fluid and the depth was 299'. This inspection satisfies 1501:9-9-03. There were no violations at this time. | ||||
23305217 | 2011-09-12 | I witnessed the cementing of the 11.75 conductor by Petroset on Poulson rig #10. There were no violations at this time. | ||||
-346531823 | 2011-09-12 | I performed a status check on Roy Poulson's rig #10. The rig crew were still rigging the equipment up. The drilling pit was in place. There were no violations at this time. | ||||
495642508 | 2011-09-13 | I witnessed the cementing of the 8 5/8 casing by Petroset on Poulson rig #10. There were no violations at this time. | ||||
862758419 | 2011-09-07 | I received a call from Mr. Robert Besau(330-257-2302)of Rte 224 in Atwater. He wanted to know about the drilling of the well and what the company is going to do for keeping the water out of the location. He also was concerned about the smell,his water well and oil getting into the ditch. Mr. Besau stated that they were making the location now. He is concerned about the noise of the pumping unit from his house. His house is 156' from the wellhead with a small woods as a barrier. I told him the electric motor would not make much of a noise. He wanted a guarantee that there would not be any noise coming from the pumping unit. I could not do that. I stated that I would check the drilling location out and talk to Orion about his concerns. I talked face to face with the Orion field superintendent Warren Shoenselt cell 330-464-9634 about this matter. He stated that Mr. Besau had talked with him about all these issues. Warren is going to treat this well as a HB-278 well. Warren will check his water well before the drilling starts. A charchol filter will be installed at the tank battery along with a privacy fence and trees will be planted. The wellhead will have a dike around it for the protection from the ditch. The tank battery will have a higher dike around it for the same reason. This complaint is resolved. |
For data sources see[2]