If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-019-22164 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.52973754,"lon":-81.12821157,"icon":""}]} |
County: Carroll | |
Municipality: | |
Operator Name: CHESAPEAKE EXPLORATION LLC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2012-09-10 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 40.52973754 | |
Longitude: -81.12821157 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2013-12 | 75722.0 | 9957.0 | ||||
2013-6 | 114738.0 | 20555.0 | ||||
2013-9 | 88262.0 | 13686.0 | ||||
2014-3 | 49183.0 | 84.0 | 5733.0 | 84.0 | ||
2014-1 | 58914.0 | 83.0 | 8231.0 | 83.0 | ||
2014-4 | 36114.0 | 72.0 | 4254.0 | 72.0 | ||
2014-2 | 48927.0 | 84.0 | 6373.0 | 84.0 | ||
2015-1 | 45852.0 | 84.0 | 4796.0 | 84.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-1222647589 | 2015-01-20 | I was on location to conduct a status check of this well. The well is of plunger lift construction. Jersey barriers were installed around the wellhead. The tank battery consisted of 8, 400 BBL production tanks and was diked. A windsock was installed on the top of the production tanks. Other production equipment on the well pad consisted of: | ||||
239463427 | 2012-06-26 | I was on site to check the status of the well site construction. My inspection revealed that the contractor has built the lease road and the well site. All erosion and sedimentation controls have been installed and are functional. |
For data sources see[2]