If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-019-22164 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.52,"lon":-81.12,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Carroll | |
Municipality: Union Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-000348 | |
Farm/Lease Name: RUTLEDGE 10-14-6 | |
License Status: Producing | |
License Date: 2012-05-25 | |
Spud Date: 2012-09-10 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2012-09-27 | |
Well Total Depth: 13829.00 ft | |
Configuration: Horizontal | |
Latitude: 40.520000 | |
Longitude: -81.120000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2012-05-25 | Proposed Formations:TRENTON-BLACK RIVER, Issued Date:5/25/2012, Expired Date:5/25/2014 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2012-06-13 | Proposed Formations:POINT PLEASANT, Issued Date:6/13/2012, Expired Date:6/13/2014 12:00:00 PM, Drilling unit acres:152.69, Proposed Well Type:OG, Proposed Well Class:POOL |
Correction to Well | 2012-06-15 | CORRECTION TO APP TYPE, PERMIT NUMBER & CASING PROGRAM. STRATIGRAPHIC TEST CANCELLED PER OWNER REQUEST. |
Reached Total Depth | 2012-09-27 | |
Correction to Well | 2013-04-19 | CORRECTION TO SURFACE AND TARGET INFORMATION (FOOTAGE AND X,Y COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE CHANGED TO 142.19 ACRES. |
Completion Report Received | 2013-06-19 | |
Construction Permit Expires | 2014-05-25 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2013-06-24 | 8420 | 13726 | 680 |
8420 | 13726 | 680 | |
8420 | 13726 | 680 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 12/13/2012 | 12/13/2012 | 7647.00 | 4,762,716.0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | ||||||||
Acid, Hydrochloric 15pct, A264,
B244, B317, J475, J580, J609, J610, L058, L071, Northern White Sand, 100 Mesh Sand |
Schlumberger | Acid, Anti-Bacterial Agent, Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent, KCl Substitute, Scale Inhibitor, Proppant - Natural | Quartz | 14808-60-7 | 97.84 | 19.43 | ||
2-Propenoic acid, 2-methyl-, polymer
with sodium 2-methyl-2-((1-oxo-2- propen-1-yl)amino)-1-propanesulfonate (1:1) |
136793-29-8 | 0.00472000 | 0.00094000 | |||||
Choline chloride | 67-48-1 | 0.44 | 0.08 | |||||
Glycerin, natural | 56-81-5 | 0.01 | 0.00327000 | |||||
Urea | 57-13-6 | 0.00290000 | 0.00058000 | |||||
Acrylamide-sodium-2-acrylamido-2-methlypropane
sulfonate copolymer |
38193-60-1 | 0.04 | 0.00876000 | |||||
Glutaraldehyde | 111-30-8 | 0.03 | 0.00700000 | |||||
Methanol | 67-56-1 | 0.00387000 | 0.00077000 | |||||
Sodium sulfate | 7757-82-6 | 0.01 | 0.00358000 | |||||
Peroxydisulfuric acid, diammonium salt | 7727-54-0 | 0.00719000 | 0.00143000 | |||||
Trisodium phosphate | 7601-54-9 | 0.00429000 | 0.00085000 | |||||
Fatty acids, tall-oil | 61790-12-3 | 0.00284000 | 0.00056000 | |||||
Boric acid, dipotassium salt | 1332-77-0 | 0.05 | 0.01 | |||||
Sodium erythorbate | 6381-77-7 | 0.00374000 | 0.00074000 | |||||
Hydrochloric acid | 7647-01-0 | 1.01 | 0.20 | |||||
Potassium hydroxide | 1310-58-3 | 0.01 | 0.00327000 | |||||
Ammonium sulfate | 7783-20-2 | 0.04 | 0.00827000 | |||||
Guar gum | 9000-30-0 | 0.47 | 0.09 | |||||
Fresh Water | Carrier/Base Fluid | Water | 7732-18-5 | 100.00 | 84.83 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2012-12-15 | H2O | 15 | 6243 Bbl | 383810 | Schlumberger | STAGE 7
40 SHOTS |
2012-12-15 | H2O | 15 | 6218 Bbl | 383540 | Schlumberger | STAGE 9
40 SHOTS |
2012-12-15 | H2O | 15 | 5844 Bbl | 386480 | Schlumberger | STAGE 6
40 SHOTS |
2012-12-13 | H2O | 15 | 6355 Bbl | 387100 | Schlumberger | STAGE 1
40 SHOTS |
2012-12-18 | H2O | 15 | 6048 Bbl | 382320 | Schlumberger | STAGE 14
40 SHOTS |
2012-12-15 | H2O | 15 | 5909 Bbl | 390692 | Schlumberger | STAGE 8
40 SHOTS |
2012-12-14 | H2O | 0 | 5932 Bbl | 378572 | Schlumberger | STAGE 3
40 SHOTS |
2012-12-14 | H2O | 15 | 7010 Bbl | 388240 | Schlumberger | STAGE 2
40 SHOTS |
2012-12-17 | H2O | 15 | 6177 Bbl | 381951 | Schlumberger | STAGE 10
40 SHOTS |
2012-12-14 | H2O | 15 | 5864 Bbl | 386620 | Schlumberger | STAGE 4
40 SHOTS |
2012-12-19 | H2O | 15 | 6285 Bbl | 385230 | Schlumberger | STAGE 17
40 SHOTS |
2012-12-18 | H2O | 15 | 6122 Bbl | 384580 | Schlumberger | STAGE 13
40 SHOTS |
2012-12-19 | H2O | 15 | 6258 Bbl | 383100 | Schlumberger | STAGE 16
40 SHOTS |
2012-12-18 | H2O | 15 | 5743 Bbl | 383261 | Schlumberger | STAGE 15
40 SHOTS |
2012-12-17 | H2O | 15 | 5938 Bbl | 383360 | Schlumberger | STAGE 12
40 SHOTS |
2012-12-15 | H2O | 15 | 5679 Bbl | 385580 | Schlumberger | STAGE 5
40 SHOTS |
2012-12-17 | H2O | 15 | 6152 Bbl | 381199 | Schlumberger | STAGE 11
40 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | CHESAPEAKE EXPLORATION LLC | 278722 | 44198 | 241 |
2014 | CHESAPEAKE EXPLORATION LLC | 193138 | 24591 | 323 |
2015 | CHESAPEAKE EXPLORATION LLC | 157396 | 16968 | 354 |
2016 | CHESAPEAKE EXPLORATION LLC | 121342 | 12637 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | 97915 | 9018 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | 85651 | 8078 | 362 |
2019 | CHESAPEAKE EXPLORATION LLC | 20442 | 1898 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | CHESAPEAKE EXPLORATION LLC | Brine | 7347 | 241 |
2014 | CHESAPEAKE EXPLORATION LLC | Brine | 1848 | 323 |
2015 | CHESAPEAKE EXPLORATION LLC | Brine | 1839 | 354 |
2016 | CHESAPEAKE EXPLORATION LLC | Brine | 3252 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 2098 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 1127 | 362 |
2019 | CHESAPEAKE EXPLORATION LLC | Brine | 208 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1222647589 | 2015-1-20 0:00: | PW | No Violations | |
-1292360419 | 2015-9-28 0:00: | PL | No Violations | |
-195274567 | 2019-9-26 0:00: | PW | No Violations | 1.00 |
-550350565 | 2019-8-28 0:00: | PW | No Violations | 1.00 |
-976386351 | 2019-8-19 0:00: | PW | No Violations | |
0239463427 | 2012-06-26 | Drill / Deepen / Reopen | No Violations | I was on site to check the status of the well site construction. My inspection revealed that the contractor has built the lease road and the well site. All erosion and sedimentation controls have been installed and are functional. |
0983051032 | 2017-12-12 | Production Wells | No Violations | I was on location to conduct a status check of this well. The pad is equipped with four producing wells, and this well was equipped with a plunger lift assembly. Proper identification was posted at the access road entrance, the pad entrance, the wells, and tank battery. The tank battery was surrounded by a steel dike. Other production equipment on the well pad consisted of:
The lease road was in good repair. No violations were observed at the time of inspection. |
1222647589 | 2015-01-20 | Production Wells | No Violations | I was on location to conduct a status check of this well. The well is of plunger lift construction. Jersey barriers were installed around the wellhead. The tank battery consisted of 8, 400 BBL production tanks and was diked. A windsock was installed on the top of the production tanks. Other production equipment on the well pad consisted of:
|
1292360419 | 2015-09-28 | Preliminary Restoration | No Violations | I was on location to conduct a preliminary restoration inspection. The well is equipped with a plunger lift unit. Jersey barriers were installed around the wellhead. The well is properly identified with a clear, legibly marked well identification sign. The tank battery consisted of eight 400 BBL production tanks and was diked. The tanks are located within a spray-lined and sealed secondary containment. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipators. There is a truck grounding area for trucks collecting condensate and/or produced water. Lightning protection and a windsock is installed on top of the production tanks. Other production equipment on the well pad consisted of:
|
132745946 | 2019-9-4 0:00:0 | PW | No Violations | 2.00 |
239463427 | 2012-6-26 0:00: | DD | No Violations | 1.00 |
983051032 | 2017-12-12 0:00 | PW | No Violations | 0.80 |
For data sources see[10]