If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-059-24438 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.01115793,"lon":-81.31366179,"icon":""}]} |
| County: | |
| Municipality: | |
| Operator Name: | |
| Well Pad ID: | |
| Farm/Lease Name: | |
| First Permit Date: | |
| Last Permit Date: | |
| Spud Date: 2015-01-09 | |
| Unconventional: | |
| Configuration: | |
| Well Status: Well Drilled | |
| Violations: 0 | |
| Latitude: 40.01115793 | |
| Longitude: -81.31366179 |
| INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
|---|---|---|---|---|---|---|
| -1494001365 | 2015-01-26 | On the day of my inspection I witnessed that Nomac Drilling Rig #72 was 75% rigged up with plans to re-spud well tomorrow. | ||||
| -1875242522 | 2015-04-23 | On the day of my inspection the site passed preliminary restoration according to ORC 1509.072A. | ||||
| 2032354800 | 2015-01-30 | On the date of inspection I am on site to witness the cementing of the 9.625 inch intermediate casing. I was informed by Chesapeake consultant, Matt Whitehead, that the Nomac 72 rig had drilled a 12.25 inch diameter hole to a depth of 2010 feet. 9.625 inch diameter, 40.00lbs/ft. casing was set at 2000 feet. The Rotary Kelly Bushing (RKB) is at a height of 20 feet above ground level. All depths are measured from this height. The rig circulated on the hole prior to rigging up the cement head. Schlumberger pumped 735sk of Class A cement, 15.6ppg, 1.23 yield, 2% D178, 0.2% D046, 0.4% B348, 0.3% D202, 0.6% D013. Schlumberger displaced cement with 148bbl of water. Plug was bumped after pumping an additional bbl of water, floats held, 48bbl of cement returned to surface. | ||||
| 545906019 | 2015-01-11 | On the day of my inspection I witnessed that Express Energy Services had drilled a 26 inch diameter hole to the depth of 120 feet hitting water at 105 feet and ran 120 feet of 20 inch conductor pipe. Express gained circulation and cemented pipe with 230 sacks Class A cement with 2% CaCl and .5#/sk. of floseal. Displaced cement with 39bbls of fresh water and had good cement returns of 18bbls to surface. | ||||
| 987624541 | 2015-01-28 | On the day of my inspection I witnessed that Nomac Drilling Rig #70 drilled a 17.5 inch diameter hole to the depth of 639 feet. Wyoming Casing Crew ran and set 628 feet of 13.375 inch 54.5#/ft J-55 casing. Schlumberger was on site and gained circulation with 25bbls of gel followed by 10bbls of fresh water and cemented casing with 596 sacks of Class A 15.6ppg, 1.22cuft/sk. cement. Cement weight was verified by mud scales. Had good returns of 29bbls, plug was landed at 277psi and pressured to 860psi for 5 minutes and the floats held with |
For data sources see[1]