X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-019-22332

Well Details

Well ID: 34-019-22332
Loading map...
County: Carroll
Municipality:
Operator Name: CHESAPEAKE EXPLORATION LLC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2013-03-09
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 40.71624038
Longitude: -80.95892766

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-12 138066.0 5167.0
2013-9 116178.0 8472.0
2014-1 92432.0 86.0 3823.0 86.0
2014-2 83789.0 90.0 2873.0 90.0
2014-3 75516.0 90.0 2831.0 90.0
2014-4 70269.0 92.0 2783.0 92.0
2015-1 57019.0 90.0 2101.0 90.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1363108264 2013-03-05 I went to the site to check on the status of the rig move. The derrick was still down, and equipment was being moved from drilling the 1H to the 3H.
1363289973 2013-03-13 I was onsite to check the status of drilling for the intermediate casing. They were currently 1350' of their target depth of 1500'. They estimate that they will be cementing casing in 9 hours time.
1364922186 2013-03-26 I went to the site and met with drilling consultant Rodney Bean, and reviewed the drilling data, and the planned production casing installation data. The well was drilled to a total measured depth of 13,705' this morning.
1541479049 2013-03-11 I went to the site to witness the cementing of the surface casing. The drilling contractor, Nomac 39, spudded the well on 03/11/2013. The 17.50' diameter surface hole was drilled to 785
206835090 2013-03-14 I was onsite to witness the cementing of the 9 5/8 intermediate casing that was set to 1491'. There were delays in the job as the wrong shoe joint parts were ordered and they needed new ones to be ordered to run the casing. There was also a delay as there was a miscommunication between Halliburton and Chesapeake as to when the required callout time was. In total 16 barrels of cement came back to surface with full returns through the job. Cement was scaled at 14.7ppg at end of the job, target was 15.6.
31179649 2013-03-13 I met on site with drilling consultant Rodney Bean. Rig was drilling intermediate hole at 1000'. Anticipated finishing intermediate hole in early hours of morning 03/14/2013.
-46257149 2013-03-28 I went to the site to witness the cementing of the production casing. The drilling contractor, Nomac 39, drilled an 8.75 diameter hole from beneath the base of the intermediate casing at 1491
-528006226 2013-03-18 Met with drilling supertintendent John Snook. Rig was tripping at 6900'.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.