If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-045-21276 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.93043627,"lon":-82.73544689,"icon":""}]} |
County: Fairfield | |
Municipality: | |
Operator Name: ENVERON CORPORATION | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2001-01-22 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Plugged and Abandoned | |
Violations: 0 | |
Latitude: 39.93043627 | |
Longitude: -82.73544689 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2001-0 | 17618.0 | 1316.0 | ||||
2002-0 | 60958.0 | 3944.0 | ||||
2003-0 | 69547.0 | 4843.0 | ||||
2004-0 | 37402.0 | 2645.0 | ||||
2005-0 | 21763.0 | 1519.0 | ||||
2006-0 | 15537.0 | 1048.0 | ||||
2007-0 | 28088.0 | 0.0 | ||||
2008-0 | 45632.0 | 0.0 | ||||
2009-0 | 29474.0 | 0.0 | ||||
2010-0 | 22450.0 | 0.0 | ||||
2011-0 | 16138.0 | 0.0 | ||||
2012-0 | 8216.0 | 0.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-1115842547 | 2003-02-12 | INSPECTION REVEALED NO VIOLATIONS NOTED THIS DATE. WEATHER CONDITIOTNS: SUNNY AND 18 DEGREES. | Informal Letter | |||
-1115842547 | 2003-02-12 | INSPECTION REVEALED NO VIOLATIONS NOTED THIS DATE. WEATHER CONDITIOTNS: SUNNY AND 18 DEGREES. | Compliance Notice | |||
-1115842547 | 2003-02-12 | INSPECTION REVEALED NO VIOLATIONS NOTED THIS DATE. WEATHER CONDITIOTNS: SUNNY AND 18 DEGREES. | Compliance Notice | |||
-1115842547 | 2003-02-12 | INSPECTION REVEALED NO VIOLATIONS NOTED THIS DATE. WEATHER CONDITIOTNS: SUNNY AND 18 DEGREES. | Compliance Notice | |||
-1115842547 | 2003-02-12 | INSPECTION REVEALED NO VIOLATIONS NOTED THIS DATE. WEATHER CONDITIOTNS: SUNNY AND 18 DEGREES. | Compliance Notice | |||
1161116575 | 2005-07-07 | No violations noted this date. | ||||
1248i145 | 2002-01-02 | Inspection revealed No ID sign posted at the well head or the storage tank. I left a note at the separator. Weather conditions: Partly cloudy & 29 degrees. | ||||
1248i185 | 2002-01-25 | Follow-up inspection from 01/02/2002 revealed Non-Compliance to put up the proper Identification as requested by a note I left on site. This NOV is to inform you that you have until February 4,2002 to have the proper identification posted at the well head and/or the tank battery. | ||||
1248i283 | 2002-03-05 | WEATHER CONDITIONS: Mostly sunny and 38 degrees. Meet with John Britton on site and was advised that the signs are being made and he should have them up on all the wells by the end of next week. Inspector will follow-up on or about 03/19/2002. | ||||
1248i341 | 2002-04-04 | Follow-up to verbal NOV of 03/05/2002 revealed non-compliance. Owner needs to post the proper ID information at the well head and/or the storage tanks. | ||||
1248i37 | 2001-04-09 | No violations noted this date. | ||||
1248i74 | 2001-06-04 | |||||
1548008302 | 2013-08-26 | I spoke with Donny from Knox energy. The 4.5 casing is parted at 1087. I have consulted Pat Shreve on the best method to properly get the cement plugs where they belong. I will be meeting Knox energy on 08/27/2013 to discuss the options to plug this well. | ||||
36274018 | 2002-04-15 | Follow-up revealed no ID posted at the well head and/or the storage tank as required . | ||||
771343959 | 2013-08-27 | Formation Cementing on site 0840 hours, first plug set with circulation. Knox Energy pulled tubing up to 1870'. Appalachian well service used ten shot to perforate at 1870. Formation placed 300' of cement at the perforations to cover the queenston and clinton zones. Lime plug set as well as bottom of surface and surface plugs set. All plugs circulated with the exception of the surface plug witch was grouted from the surface. Fluid level was at 140'. | ||||
iDIAN006106 | 2001-06-04 |
For data sources see[2]