34-163-20950

Well Details

Well ID: 34-163-20950
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date:
Unconventional:
Configuration:
Well Status:
Violations: 0
Latitude: 39.28144749
Longitude: -82.38590264

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1143603904 2015-03-09 The surface casing cement had fell to approx. 70'. Formation cement on site, they grouted the surface to surface. The cement stayed at the surface.
1424867438 2015-02-24 Kilbarger has the site prepared. They have moved the rig on site and have prepared to start drilling on 02/25/15.
-161569947 2015-03-06 Kilbarger rig number 8 has reached 360 feet. They will be drilling today after all of the equipment gets started. 12 of snow and -6 degrees. Surface casing should be ran by Saturday 3/7/15.
-173050174 2015-03-07 Surface casing inspection. 497' of 9.62 surface pipe ran thru the Big Injun. Good cement returns.
1743607786 2015-04-22 Producers services on performing well stimulation. The well broke down at 1250 PSI. No violations noted.
2011959488 2015-03-13 Kilbarger rig 8 has began running 4.5 production casing. Formation Cementing on site to cement the production casing. The production casing they used was used casing. The casing was tested by Buckeye. I requested the inspection paperwork from Buckeye. I will obtain the testing paperwork on Monday 3/16/15.
-672156973 2015-02-27 13.25 conductor has been set to 113'. The conductor was cemented to surface with good cement returns.
-746181370 2015-03-02 Kilbarger rig 8 is preparing to begin drilling for the 9.62 surface casing. I instructed Kilbarger to route a ditch around the site using erosion control devices as the topography above the site will drain to the drilling pad. They are using silt fence and straw bales to manage the run off when the temperature warms above freezing.
815251769 2015-02-27 Kilbarger Drilling reached TD by 2300 hours. 103' of 13.38 conductor was ran with 4 centralizers. The casing was cemented back to surface on 3/1/15.
846750103 2015-05-12 The tank battery has been completed. The well is pumping flow back water from the stimulation job.
-898525866 2015-03-03 Kilbarger rig 8 has tripped back out of the hole to replace the bit. They will be drilling until they reach total depth to set the 9.62 surface casing.
-962832035 2015-02-25 Kilbarger drilling has rigged up and spudded the well. They are using 13.25 conductor, and 9.62 surface casing in case there is a mine void.

For data sources see[1]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20.