34-153-22985

Well Details

Well ID: 34-153-22985
Loading map...
County: Summit
Municipality:
Operator Name: M & M ROYALTY LTD
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2007-11-02
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 41.13808439
Longitude: -81.55270967

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2008-0 7155.0 1917.0
2009-0 8753.0 1378.0
2010-0 6736.0 875.0
2011-0 5527.0 884.0
2012-0 6395.0 645.0
2013-0 4312.0 605.0
2014-0 3414.0 365.0 511.0 365.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1196454420 2007-11-26 The trash pit is closed and the site has been rough graded. No violations at this time.
-1269273916 2007-11-06 After plugging back to 700' on 11/05, Union went back into the hole and did not encounter any solid cement to a depth of 900'. M&M decided to plug back again. This time, Universal broke circulation and plugged back from 900' to 600' with 90 sacks of class A with 2% calcium chloride and 5% salt. The plug was again spotted with open ended drill pipe. Union will wait a minimum of 12 hours before going back in the hole.
-1507399003 2010-02-17 Status check inspection found no violations at this time.
-1548041417 2007-11-13 Union Drilling should TD the well tomorrow. The steel pits are functioning properly and the location is in good condition. No violations at this time.
1818162988 2010-02-05 Inspected site for tour on Senate Bill 165
1912792162 2007-11-08 Union Rig 24 is drilling ahead and is trying to correct the hole deviation problems.
-2129356113 2007-11-05 Union drillied to 1400' and the hole was out 19 degrees. Petroset broke circulation and plugged back from 1371' to 700' with 185 sacks of class A cement with 2% calcium chloride pumped through open ended drill pipe. Union will wait at least 8 hours before going back in the hole.
-436202514 2008-07-30 Preliminary restoration is approved.
666989815 2008-01-31 The tank battery is being built and a pump jack is being assembled. No violations at this time. Preliminary restoration is not due until August 2008.
-759939186 2007-11-01 Union Drilling Rig 24 is moving on site and should spud tomorrow. The permit required that the well be drilled with steel pits which are on site and being set in place. No violations at this time.
944413899 2011-07-21 Recent flooding has caused no apparent structural damage to either the well or to the tank battery. No violations at this time.

For data sources see[2]