If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-22985 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.13,"lon":-81.55,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: SOUND ENERGY CO INC | |
Well Pad ID: | |
Farm/Lease Name: CEDARWOOD UNIT | |
License Status: Producing | |
License Date: 2007-09-25 | |
Spud Date: 2007-11-02 | |
Spud Drilling Contractor: UNION DRLG | |
Final Drill Date: 2007-11-15 | |
Well Total Depth: 3683.00 ft | |
Configuration: Directional | |
Latitude: 41.130000 | |
Longitude: -81.550000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2006-09-28 | Proposed Formations:CLINTON, Issued Date:9/28/2006, Expired Date:9/28/2007 6:00:00 AM, Drilling unit acres:41.04, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2007-09-25 | Proposed Formations:CLINTON, Issued Date:9/25/2007, Expired Date:9/24/2008 6:00:00 AM, Drilling unit acres:41.04, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2007-11-15 | |
Correction to Well | 2007-12-14 | CORRECTION TO TARGET INFORMATION: FOOTAGE= 285'SL & 1025'WL OF LOT 69; X= 2,260,739 AND Y= 536,999. |
Completion Report Received | 2008-02-29 | |
Construction Permit Expires | 2008-09-24 | |
Change of Owner | 2015-05-12 | Operator changed from 7626, M & M ROYALTY LTD to 4327, SOUND ENERGY CO INC |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2008-06-09 | 3481 | 3559 | 33 |
3481 | 3559 | 33 | |
3481 | 3559 | 33 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 57000 Gal | 60000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | M & M ROYALTY LTD | 7155.00 | 1917.00 | 314 |
2009 | M & M ROYALTY LTD | 8753.00 | 1378.00 | 365 |
2010 | M & M ROYALTY LTD | 6736.00 | 875.00 | 365 |
2011 | M & M ROYALTY LTD | 5527.00 | 884.00 | 365 |
2012 | M & M ROYALTY LTD | 6395.00 | 645.00 | 366 |
2013 | M & M ROYALTY LTD | 4312.00 | 605.00 | 365 |
2014 | M & M ROYALTY LTD | 3414.00 | 511.00 | 365 |
2015 | SOUND ENERGY CO INC | 2931.00 | 300.00 | 305 |
2016 | SOUND ENERGY CO INC | 4101.00 | 452.00 | 365 |
2017 | SOUND ENERGY CO INC | 3656.00 | 456.00 | 365 |
2018 | SOUND ENERGY CO INC | 3234.00 | 462.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | M & M ROYALTY LTD | Brine | 250 | 314 |
2009 | M & M ROYALTY LTD | Brine | 230 | 365 |
2010 | M & M ROYALTY LTD | Brine | 88 | 365 |
2011 | M & M ROYALTY LTD | Brine | 45 | 365 |
2012 | M & M ROYALTY LTD | Brine | 30 | 366 |
2013 | M & M ROYALTY LTD | Brine | 76 | 365 |
2014 | M & M ROYALTY LTD | Brine | 0 | 365 |
2015 | SOUND ENERGY CO INC | Brine | 77 | 305 |
2016 | SOUND ENERGY CO INC | Brine | 78 | 365 |
2017 | SOUND ENERGY CO INC | Brine | 0 | 365 |
2018 | SOUND ENERGY CO INC | Brine | 129 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1269273916 | 2007-11-6 0:00: | DD | No Violations | |
-1507399003 | 2010-2-17 0:00: | PW | No Violations | |
-1548041417 | 2007-11-13 0:00 | DD | No Violations | |
-2129356113 | 2007-11-5 0:00: | DD | No Violations | |
-436202514 | 2008-7-30 0:00: | PL | No Violations | |
-759939186 | 2007-11-1 0:00: | DD | No Violations | |
0436202514 | 2008-07-30 | Preliminary Restoration | No Violations | Preliminary restoration is approved. |
0666989815 | 2008-01-31 | Drill / Deepen / Reopen | No Violations | The tank battery is being built and a pump jack is being assembled. No violations at this time. Preliminary restoration is not due until August 2008. |
0759939186 | 2007-11-01 | Drill / Deepen / Reopen | No Violations | Union Drilling Rig 24 is moving on site and should spud tomorrow. The permit required that the well be drilled with steel pits which are on site and being set in place. No violations at this time. |
0944413899 | 2011-07-21 | UrbanProduction Wells | No Violations | Recent flooding has caused no apparent structural damage to either the well or to the tank battery. No violations at this time. |
1196454420 | 2007-11-26 | Drill / Deepen / Reopen | No Violations | The trash pit is closed and the site has been rough graded. No violations at this time. |
1269273916 | 2007-11-06 | Drill / Deepen / Reopen | No Violations | After plugging back to 700 on 11/05, Union went back into the hole and did not encounter any solid cement to a depth of 900. M&M decided to plug back again. This time, Universal broke circulation and plugged back from 900 to 600 with 90 sacks of class A with 2% calcium chloride and 5% salt. The plug was again spotted with open ended drill pipe. Union will wait a minimum of 12 hours before going back in the hole. |
1507399003 | 2010-02-17 | Production Wells | No Violations | Status check inspection found no violations at this time. |
1548041417 | 2007-11-13 | Drill / Deepen / Reopen | No Violations | Union Drilling should TD the well tomorrow. The steel pits are functioning properly and the location is in good condition. No violations at this time. |
1818162988 | 2010-02-05 | Drill / Deepen / Reopen | No Violations | Inspected site for tour on Senate Bill 165 |
1912792162 | 2007-11-08 | Drill / Deepen / Reopen | No Violations | Union Rig 24 is drilling ahead and is trying to correct the hole deviation problems. |
2054627557 | 2018-12-27 | UrbanProduction Wells | No Violations | The wellhead was surrounded with a locked board on board wooden fence and dike. I. D. signage was posted on the fence. The well was operated as an electric pumping well. A domestic gas tap and meter was connected to the 4.5 casing. The tank battery was also surrounded with a wooden fence and dike. The fence was locked and legible I. D. signage was posted. The equipment in the tank battery included two (2) 100 barrel stock tanks, one (1) 50 barrel brine tank, one (1) 2408 separator with an orifice gas measurement meter. The gas meters chart reflected the current production period. The tanks were compliant with SB 165. The load lines were locked and plugged. Dominion / EOG had a measurement station inside the tank battery. |
2129356113 | 2007-11-05 | Drill / Deepen / Reopen | No Violations | Union drillied to 1400 and the hole was out 19 degrees. Petroset broke circulation and plugged back from 1371 to 700 with 185 sacks of class A cement with 2% calcium chloride pumped through open ended drill pipe. Union will wait at least 8 hours before going back in the hole. |
666989815 | 2008-1-31 0:00: | DD | No Violations | |
944413899 | 2011-7-21 0:00: | UP | No Violations |
For data sources see[9]