Well ID: 34-031-27165 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.341962,"lon":-81.62149598,"icon":""}]} |
County: Coshocton | |
Municipality: | |
Operator Name: NGO DEVELOPMENT CORP. | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2013-10-07 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Well Drilled | |
Violations: 0 | |
Latitude: 40.341962 | |
Longitude: -81.62149598 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2014-0 | 8092.0 | 338.0 | 193.0 | 338.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-1060832029 | 2014-10-02 | On the day of my inspection I found that the entire site had been graded out and planted. Approximately 60% of the site was growing with well established vegetation. The other 40% had recently been re-planted. Grass was growing on the re-planted section, but it was not enough growth to pass restoration at this time. | ||||
1314673696 | 2013-12-04 | On the day of my inspection I found that the mud pit was closed and the blow pit was solidified. The site was not reclaimed. The well head was shut in and there was no production equipment in place. There were three 500 barrel frac tanks at the site. | ||||
1381154655 | 2013-10-07 | On the day of my inspection I found that Kilbarger Drilling rig 1 was rigged up on location preparing to spud. The drilling pits were dug and lined and the permit was on display in the doghouse. | ||||
1381186230 | 2013-10-07 | On the day of my inspection I found that Kilbarger Drilling rig 1 drilled a 17 hole to 65' and ran new 11.75 conductor casing to 62'. Petroset broke circulation and pumped 100 sacks of class A cement. Good circulation was maintained throughout the job with 6 barrels of cement returns. | ||||
1381346100 | 2013-10-09 | On the day of my inspection I found that Kilbarger Drilling rig 1 drilled an 11 surface hole on air to 798' and ran new 8.625 surface casing to 759'. They were circulating the hole with the mud pump upon my arrival. Petroset broke circulation and pumped 270 sacks of class A cement. Good circulation was maintained throughout the job with 11 barrels of cement returns. | ||||
-1610835078 | 2013-10-09 | On the day of my inspection I found that Kilbarger Drilling rig 1 had drilled an 11; surface hole on air to 798'. They were in the process of running new 8.625 surface casing. The permit was on display in the doghouse, there were no sags or tears in the pit liners and there were no leaks or spills. | ||||
-1789777297 | 2013-10-08 | On the day of my inspection I found that Kilbarger Drilling rig 1 was drilling an 11 surface hole on air. They were at a depth of 206' and reported that they were in hard material which was slowing them down considerably. The permit was on display in the doghouse, there were no sags or tears in the pit liners and there were no leaks or spills. | ||||
1926990058 | 2015-04-07 | On the day of my inspection I found that the portion of the site that still needed erosion control was now planted in agricultural crops. This site passes preliminary restoration. | ||||
1967470023 | 2013-12-30 | On the day of my inspection I found that the well was not equipped for production. No production equipment had been installed and nothing had been done to restore the drill site. The ground was snow covered. | ||||
-1984684645 | 2014-06-06 | On the day of my inspection I found that the drill site was graded out to the approximate original contour and the pits were closed. The wellhead was equipped with a plunger lift system and the tank battery was in place with dike. The site still needs to be planted for erosion control. | ||||
-2082404984 | 2013-10-22 | On the day of my inspection I found that all of the drilling equipment had been removed from the location. The mud pit was still open and 75% drained. The blow pit was in the process of being solidified and closed. The well head was shut in and there were no leaks or spills. | ||||
-622722026 | 2013-10-02 | On the day of my inspection I found that the excavating crew was on location preparing to move the drilling rig in. The location was cut and the entrance was graveled. The pits were not started. |
For data sources see[2]