Well ID: 34-031-27165 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.34,"lon":-81.62,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Coshocton | |
Municipality: Adams Township | |
Operator Name: DIVERSIFIED PRODUCTION LLC | |
Well Pad ID: | |
Farm/Lease Name: SPALDING | |
License Status: Producing | |
License Date: 2013-09-05 | |
Spud Date: 2013-10-07 | |
Spud Drilling Contractor: KILBARGER DRLG | |
Final Drill Date: 2013-10-13 | |
Well Total Depth: | |
Configuration: Vertical | |
Latitude: 40.340000 | |
Longitude: -81.620000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2011-08-08 | Proposed Formations:BEREA - COPPER RIDGE, Issued Date:8/8/2011, Expired Date:8/7/2013 12:00:00 PM, Drilling unit acres:190, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2013-09-05 | Proposed Formations:BEREA-CLINTON, Issued Date:9/5/2013, Expired Date:9/5/2015 12:00:00 PM, Drilling unit acres:186.573, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2013-10-13 | |
Completion Report Received | 2015-08-20 | |
Construction Permit Expires | 2015-09-05 | |
Change of Owner | 2018-03-07 | Operator changed from 98, NGO DEVELOPMENT CORP. to 8685, M & R INVESTMENTS OHIO LLC |
Record Last Modified | 2018-03-08 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2015-08-24 | 4614 | 4682 | 62 |
4614 | 4682 | 62 | |
4614 | 4682 | 62 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 11/14/2013 | 11/14/2013 | 4828 | 92355 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Pro Clay Firm LP | Producers Service Corp | clay control | ethylene glycol | 107-21-1 | 40 | 0.00425 | 35 |
2-propen-1-aminium, N, N-dimethyl-N-2propenyl | 26062-79-3 | 0 | 0.00213 | 17 | ||||
Buffer 1 | Producers Service Corp | pH Control | Sulfamic Acid | 5329-14-6 | 100 | 0.00613 | 50 | |
Pro Clear Slik-2 | Producers Service Corp | Friction Reducer | methanol | 67-56-1 | 5 | 0.00159 | 13 | |
alchols, C12-16, ethoxylated | 68551-12-2 | 70 | 0.02233 | 182 | ||||
2-butoxyethanol | 111-76-2 | 10 | 0.00319 | 26 | ||||
Irontrol | Producers Service Corp | iron control | sulfamic acid | 5329-14-6 | 70 | 0.00858 | 70 | |
IC Acid | Producers Service Corp | Acid | Hydrochloric Acid | 7647-01-0 | 15 | 0.04923 | 402 | |
Pro NE-21 | Producers Service Corp | surfactant | 2-butoxyethanol | 111-76-2 | 40 | 0.00797 | 65 | |
alchohols, C12-16, ethoxylated | 68551-12-2 | 70 | 0.01396 | 114 | ||||
methanol | 67-56-1 | 30 | 0.00598 | 49 | ||||
Pro Breaker 4 | Producers Service Corp | breaker | Sucrose | 57-50-1 | 46 | 0.00015 | 1 | |
Ethylene Glycol | 107-21-1 | 14 | 0.00005000 | 0 | ||||
Pro Gel 4 | Producers Serivce Corp | gel | Guar Gum Blend | 9000-30-0 | 100 | 0.23004 | 1878 | |
FLC | Producers Service Corp | fluid loss | modified polysaccaride | 9005-25-8 | 50 | 0.01838 | 150 | |
crystalline silica in form of quartz | 14808-60-7 | 65 | 0.02389 | 195 | ||||
water | NGO Development | treatment carrier | water | 7732-18-5 | 100 | 94.4227 | 770702 | |
Silica Sand | Producers Service Corp | proppant | Crystalline Silica (quartz | 14808-60-7 | 100 | 4.90061 | 40000 | |
Pro Hib II | Producers Service Corp | Inhibitor | propargyl alcohol | 107-19-7 | 30 | 0.00015 | 1 | |
dimethylcocoamine, bis(chloroethyl)ether,
diquaternary ammonium salt |
68607-28-3 | 60 | 0.0003 | 2 | ||||
glycol ethers | 111-76-2 | 40 | 0.0002 | 2 | ||||
ethylene glycol | 107-21-1 | 40 | 0.0002 | 2 | ||||
ethoxylated nonylphenol | 68412-54-4 | 10 | 0.00005000 | 0.405 | ||||
methanol | 67-56-1 | 30 | 0.00015 | 1 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | NGO DEVELOPMENT CORP. | 8092.00 | 193.00 | 338 |
2015 | NGO DEVELOPMENT CORP. | 5745.00 | 99.00 | 365 |
2016 | NGO DEVELOPMENT CORP. | 4333.00 | 50.00 | 365 |
2017 | NGO DEVELOPMENT CORP. | 3419.00 | 75.00 | 365 |
2018 | NGO DEVELOPMENT CORP. | 1825.00 | 0.00 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | NGO DEVELOPMENT CORP. | Brine | 176 | 338 |
2015 | NGO DEVELOPMENT CORP. | Brine | 111 | 365 |
2016 | NGO DEVELOPMENT CORP. | Brine | 94 | 365 |
2017 | NGO DEVELOPMENT CORP. | Brine | 0 | 365 |
2018 | NGO DEVELOPMENT CORP. | Brine | 0 | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1060832029 | 2014-10-2 0:00: | PL | No Violations | |
-1610835078 | 2013-10-9 0:00: | DD | No Violations | |
-1789777297 | 2013-10-8 0:00: | DD | No Violations | |
-1968594870 | 2016-8-17 0:00: | PW | No Violations | 1.00 |
-1984684645 | 2014-6-6 0:00:0 | PL | No Violations | |
-2082404984 | 2013-10-22 0:00 | DD | No Violations | |
-622722026 | 2013-10-2 0:00: | DD | No Violations | |
0622722026 | 2013-10-02 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that the excavating crew was on location preparing to move the drilling rig in. The location was cut and the entrance was graveled. The pits were not started. |
1060832029 | 2014-10-02 | Preliminary Restoration | No Violations | On the day of my inspection I found that the entire site had been graded out and planted. Approximately 60% of the site was growing with well established vegetation. The other 40% had recently been re-planted. Grass was growing on the re-planted section, but it was not enough growth to pass restoration at this time. |
1314673696 | 2013-12-04 | Preliminary Restoration | No Violations | On the day of my inspection I found that the mud pit was closed and the blow pit was solidified. The site was not reclaimed. The well head was shut in and there was no production equipment in place. There were three 500 barrel frac tanks at the site. |
1381154655 | 2013-10-07 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that Kilbarger Drilling rig 1 was rigged up on location preparing to spud. The drilling pits were dug and lined and the permit was on display in the doghouse. |
1381186230 | 2013-10-07 | Casing String Witnessed | No Violations | On the day of my inspection I found that Kilbarger Drilling rig 1 drilled a 17 hole to 65 and ran new 11.75 conductor casing to 62. Petroset broke circulation and pumped 100 sacks of class A cement. Good circulation was maintained throughout the job with 6 barrels of cement returns. |
1381346100 | 2013-10-09 | Casing String Witnessed | No Violations | On the day of my inspection I found that Kilbarger Drilling rig 1 drilled an 11 surface hole on air to 798 and ran new 8.625 surface casing to 759. They were circulating the hole with the mud pump upon my arrival. Petroset broke circulation and pumped 270 sacks of class A cement. Good circulation was maintained throughout the job with 11 barrels of cement returns. |
1610835078 | 2013-10-09 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that Kilbarger Drilling rig 1 had drilled an 11; surface hole on air to 798. They were in the process of running new 8.625 surface casing. The permit was on display in the doghouse, there were no sags or tears in the pit liners and there were no leaks or spills. |
1789777297 | 2013-10-08 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that Kilbarger Drilling rig 1 was drilling an 11 surface hole on air. They were at a depth of 206 and reported that they were in hard material which was slowing them down considerably. The permit was on display in the doghouse, there were no sags or tears in the pit liners and there were no leaks or spills. |
1926990058 | 2015-04-07 | Preliminary Restoration | No Violations | On the day of my inspection I found that the portion of the site that still needed erosion control was now planted in agricultural crops. This site passes preliminary restoration. |
1967470023 | 2013-12-30 | Preliminary Restoration | No Violations | On the day of my inspection I found that the well was not equipped for production. No production equipment had been installed and nothing had been done to restore the drill site. The ground was snow covered. |
1968594870 | 2016-08-17 | Production Wells | No Violations | On the day of my inspection I found that the well was being produced with a plunger lift system. The flow lines were connected and the valves were open. I found no leaks or spills around the wellhead. The tank battery consisted of one 100 barrel steel tank, one 50 barrel steel tank and one horizontal separator. An earthen dike was in place around the production equipment. Correct, legible identification was posted and there were no leaks or spills. |
1984684645 | 2014-06-06 | Preliminary Restoration | No Violations | On the day of my inspection I found that the drill site was graded out to the approximate original contour and the pits were closed. The wellhead was equipped with a plunger lift system and the tank battery was in place with dike. The site still needs to be planted for erosion control. |
2082404984 | 2013-10-22 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that all of the drilling equipment had been removed from the location. The mud pit was still open and 75% drained. The blow pit was in the process of being solidified and closed. The well head was shut in and there were no leaks or spills. |
For data sources see[9]