If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-121-24494 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.91360026,"lon":-81.31426097,"icon":""}]} |
County: Noble | |
Municipality: | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2014-06-23 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 39.91360026 | |
Longitude: -81.31426097 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2015-1 | 370907.0 | 90.0 | 5708.0 | 90.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-1272889710 | 2014-07-29 | My inspection today finds Patterson rig 316 is drilling 8.75 hole at a depth of 7270' at thirty degrees of inclination building the curve. | ||||
-1972742216 | 2014-07-16 | My inspection today finds Patterson Drilling rig 316 drilled 440' of 24 hole. The rig ran 417' of 18.625 J-55 casing with four centralizers. Allied Oil and Gas Services circulated 815 sacks of class A cement into place. I witnessed 69 barrels of cement returns to surface. | ||||
-2143873544 | 2015-02-11 | My inspection today finds the well site meets the preliminary restoration requirements. The tank battery is comprised of eight 500 barrel tanks set inside a liquid tight plastic liner. | ||||
549587996 | 2014-06-24 | I am onsite to witness the cementing operations of the conductor casing. Express Energy Services drilled 100' of 32 hole with an auger rig. They ran 100' of 26 casing. Express circulated 330 sacks of class A cement with 18 barrels of cement returning to surface. |
For data sources see[2]