34-121-24494

Well Details

Well ID: 34-121-24494
Loading map...
Country: United States
State: Ohio
County: Noble
Municipality: Beaver Township
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID: US-OH-000626
Farm/Lease Name: GRISSOM UNIT
License Status: Producing
License Date: 2014-05-23
Spud Date: 2014-06-23
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2014-08-06
Well Total Depth: 15269.00 ft
Configuration: Horizontal
Latitude: 39.910000
Longitude: -81.310000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-05-23 Proposed Formations:POINT PLEASANT, Issued Date:5/23/2014, Expired Date:5/22/2016 12:00:00 PM, Drilling unit acres:487.822, Proposed Well Type:OG, Proposed Well Class:EOUT
Reached Total Depth 2014-08-06
Correction to Well 2015-01-30 CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
Completion Report Received 2015-04-20
Construction Permit Expires 2016-05-22
Record Last Modified 2017-10-23

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2015-04-20 7976 15194 0
7976 15194 0
7976 15194 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 12/05/2014 12/15/2014 7901 10,413,800.0 492499

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 AI-301 U.S. Well Services, LLC Acid Corrosion Inhibitors Hydrogen Chloride 7647-01-0 10 0.00007000 70.6231
Coco amine 61791-14-8 5 0.00003000 28.0057
Diethylene Glycol 111-46-6 30 0.00021 204.381
Polyethylene polyamine 68603-67-8 10 0.00006000 61.3082
Methenamine 100-97-0 20 0.00017 161.946
HCL Acid (12.6%-18.0%) U.S. Well Services, LLC Bulk Acid Water 7732-18-5 87.5 0.13726 133046
Hydrogen Chloride 7647-01-1 18 0.03279 31780.4
Water Antero Resources Base Fluid Water 7732-18-5 100 89.6039 86,850,900.0
K-BAC 1020 U.S. Well Services, LLC Anti-Bacterial Agent 2,2-dibromo-3-nitrilopropionamide 10222-01-2 20 0.00435 4215
Deionized Water 7732-18-5 28 0.00248 2407.59
LGC-15 U.S. Well Services, LLC Gelling Agents Suspending agent (solid) 14808-60-7 3 0.00644 6241.09
Guar Gum 9000-30-0 50 0.0421 40807.1
Petroleum Distillates 64742-47-8 60 0.03987 38646.7
Surfactant 68439-51-0 3 0.00253 2448.43
WFRA-405 U.S. Well Services, LLC Friction Reducer Crystalline Salt 12125-02-9 5 0.00374 3624.15
Petroleum Distillates 64742-47-8 40 0.02408 23339.5
Ethoxylated alcohol blend Proprietary 5 0.00374 3624.15
Water 7732-18-5 40 0.02991 28993.2
Anionic Polyacrylamide Proprietary 40 0.02991 28993.2
AP One U.S. Well Services, LLC Gel Breakers Ammonium Persulfate 7727-54-0 100 0.00171 1655
Sand U.S. Well Services, LLC Proppant Crystalline Silica, quartz 14808-60-7 100 10.0082 9,700,660.0
SI-1100 U.S. Well Services Scale Inhibitor hexamethylenediamine tetra (methylene phosphonic acid) 38820-59-6 10 0.00172 1670.09
Copolymer of Maleic and Acrylic acid 26677-99-6 10 0.00163 1577
Acrylic polymer 52255-49-9 5 0.00069 668.034
bis (hexamethylene) tramine penta

(methylene phosphonic acid) - phosphate acid

40623-75-4 10 0.00159 1536.48
2-Phosphonobutane 1,2,4 tricarboxylic salt 37971-36-1 10 0.00178 1723.53
Potassium salt of diethylene triamine

penta (methylene phosphonic acid)

15827-60-8 10 0.00186 1803.69
Ethylene Glycol 107-21-1 40 0.00623 6039.03
Di Water 7732-18-5 80 0.01103 10688.5

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-12-15 H2O 15 5996 Bbl 241660 US Well Services Inc STAGE 41/41

60 SHOTS

2014-12-05 H2O 15 6467 Bbl 239320 US Well Services Inc STAGE 1/41

60 SHOTS STAGES 2-40 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2015 ANTERO RESOURCES CORPORATION 1864700 16982 365
2016 ANTERO RESOURCES CORPORATION 969762 2931 346
2017 ANTERO RESOURCES CORPORATION 542860 1355 365
2018 ANTERO RESOURCES CORPORATION 402824 1070 359
2019 ANTERO RESOURCES CORPORATION 74285 155 88

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2015 ANTERO RESOURCES CORPORATION Brine 19293 365
2016 ANTERO RESOURCES CORPORATION Brine 9047 346
2017 ANTERO RESOURCES CORPORATION Brine 4378 365
2018 ANTERO RESOURCES CORPORATION Brine 2779 359
2019 ANTERO RESOURCES CORPORATION Brine 551 88

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1272889710 2014-7-29 0:00: DD No Violations 1.00
-1352221090 2017-8-15 0:00: PW No Violations 0.50
-1917344247 2018-4-20 0:00: PW No Violations 0.20
-1926642015 2020-4-28 0:00: PW No Violations 0.20
-1972742216 2014-7-16 0:00: CS No Violations 4.00
-1979259492 2019-10-10 0:00 PW No Violations 0.50
-2143873544 2015-2-11 0:00: PL No Violations
-51808447 2015-6-16 0:00: PW No Violations 0.20
-558974933 2018-7-16 0:00: PW No Violations 0.10
0051808447 2015-06-16 Production Wells No Violations The well is equipped in a manner consistent with being capable of production. All drainage sumps on the location are closed. No violations were noted during the inspection.
0549587996 2014-06-24 Casing String Witnessed No Violations I am onsite to witness the cementing operations of the conductor casing. Express Energy Services drilled 100 of 32 hole with an auger rig. They ran 100 of 26 casing. Express circulated 330 sacks of class A cement with 18 barrels of cement returning to surface.
0554232922 2018-03-05 Production Wells No Violations
0558974933 2018-07-16 Production Wells No Violations The purpose of my inspection today was to witness Antero re-assembling the Grissom 1H plunger lift system. The well was equipped with a production tree style wellhead with valves in the open position. A pressure gauge was present on all casing strings. Accompanied by Antero Production Superintendent during my inspection.
1030921061 2018-03-08 Production Wells No Violations The purpose of my inspection was a status check on a cut slope slip failure. The pad name is Roe and there are a total of 7 wells. The slip occurred in the cut slope of the pad in the Northwest corner where the eight 400 barrel tanks and two vapor recovery towers were located. That equipment had been removed in order for Antero to take remedial action on the slope failure. The remaining production equipment and wellheads were outside the area of concern. ODNR Division of Oil and Gas Engineering Section is currently working with Antero Resources with planning the material modification to repair the slope.
1272889710 2014-07-29 Drill / Deepen / Reopen No Violations My inspection today finds Patterson rig 316 is drilling 8.75 hole at a depth of 7270 at thirty degrees of inclination building the curve.
1352221090 2017-08-15 Production Wells No Violations The purpose of my inspection was a status check on a production well. The pad is named Roe and there are a total of 7 wells. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Gauges present read 324 pounds per square inch on the casing, 175 pounds per square inch on the tubing, and 160 pounds per square inch on the annulus. The production equipment for the well consists of eight 400 barrel tanks, seven gas processing units, two compressors, and two Cimarron combustors. The pipeline tie in is located on the west side of the pad. The production records are current, and the identification is located at the wellhead.
1409074565 2018-03-21 Production Wells No Violations The purpose of my inspection was a status check. The pad is named Roe and there are a total of 7 wells. During my inspection construction equipment was on location to make repairs to the slips located on the cut slope and fill slopes of the pad. Antero is actively working with ODNR Division of Oil and Gas Engineering section to make necessary slip repairs. The slips do not oppose any threat to the wells and the wells are under continuous pressure monitoring.
1485175271 2017-01-20 Production Wells No Violations The purpose of my inspection is a status check on a producing well. The pad name is Roe and there are a total of 7 wells on this pad. During my inspection the well was equipped with a production tree style wellhead. The production equipment for this well consists of eight 400 barrel tanks within containment, and seven gas processing units. The vapor recovery system consists of two compressors and three Cimarron combustors. The production records are current, the identification is located at the wellhead, and there are no violations present.
1494334994 2017-05-09 Production Wells No Violations The purpose of my inspection was a status check on a producing well. The pad is named Roe and there are a total of 7 wells on this pad. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Gauges present read 350 pounds per square inch on the casing and 110 pounds per square inch on the tubing. Annular pressure monitoring was present. The production equipment for this well consists of eight 400 barrel tanks, seven gas processing units, two compressors, and two Cimarron combustors. The pipeline tie in is located on the west side of the pad. The production records are current, the identification is located at the wellhead, and there are no violations present.
1528811598 2018-06-12 Production Wells No Violations Prior inspection found contractors for Antero relocating and reassembling production equipment due to a slip in the cut slope of the North side if the pad. During my inspection today, the tank battery had been moved and reset within steel containment and the vapor recovery system had been connected. The well was equipped with a production tree style wellhead. Production valves were in the open position. A gauge was present on the production tubing reading 160 pounds per square inch, 280 pounds per square inch on the production casing, 200 pounds per square inch on the 9.625 inch diameter intermediate casing, and 0 pounds per square inch on the 13.375 inch diameter surface casing. The production equipment consisted of four 400 barrel tanks, seven gas production units, and two combustors. The identification was located at the wellhead.
1917344247 2018-04-20 Production Wells No Violations During my inspection contractors for Antero Resources were on location running lines to the combustors. The production equipment had been relocated due to a slip near the old orientation of the production equipment on the north side of the pad.
1972742216 2014-07-16 Casing String Witnessed No Violations My inspection today finds Patterson Drilling rig 316 drilled 440 of 24 hole. The rig ran 417 of 18.625 J-55 casing with four centralizers. Allied Oil and Gas Services circulated 815 sacks of class A cement into place. I witnessed 69 barrels of cement returns to surface.
2143873544 2015-02-11 Preliminary Restoration No Violations My inspection today finds the well site meets the preliminary restoration requirements. The tank battery is comprised of eight 500 barrel tanks set inside a liquid tight plastic liner.
549587996 2014-6-24 0:00: CS No Violations
554232922 2018-3-5 0:00:0 PW No Violations 0.50

For data sources see[10]