34-029-21816

Well Details

Well ID: 34-029-21816
Loading map...
County: Columbiana
Municipality:
Operator Name: CHESAPEAKE EXPLORATION LLC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2013-10-29
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 40.68520998
Longitude: -80.9152129

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2014-4 224709.0 52.0 3748.0 52.0
2015-1 358696.0 88.0 3044.0 88.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1001970677 2013-10-29 I was at the site to check the progress on the conductor drilling operation. Precision Rathole was on location and had just begun drilling the conductor hole for the Pitts 1. A second rig was on site and had just begun drilling the conductor hole for the Pitts 6.
1395692430 2014-02-26 I was at the site to discuss the surface and intermediate sections of the well, and pick up the associated casing and cementing paperwork. I met with Larry Williamson, drilling consultant. Mr. Williamson informed me that the rig should reach total depth for the well tonight, and likely cement production casing tomorrow night.
-1594859826 2014-12-11 I was onsite to conduct a preliminary restoration inspection. There are a total of six wells on the pad. Access road entry is on east side of Nature Road NE approximately 1.17 miles south of Merline Road NE. There is a sign board at the entrance featuring the well names, permit numbers and emergency contact information. There is a padlocked gate at the entrance of the access road. The access road is in good repair, and drainage and erosion controls are in place. Ground cover is well established along the access road. I found the drilling/production pad to be enclosed entirely with a chain link fence with barbed wire at the top, and with a padlocked gate. The pad has a crushed limestone surface, and is in good repair. The well is constructed with a
-1990408174 2013-10-31 I witnessed the cementing of the conductor casing. Precision Rathole drilled a 30
-509901833 2014-02-28 I went to the site to witness the cementing of the production casing. The drilling contractor, Nomac 43, drilled an 8.75 diameter hole from beneath the base of the intermediate casing at 1660

For data sources see[2]