If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-029-21816 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.68,"lon":-80.91,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Columbiana | |
Municipality: Franklin Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-000717 | |
Farm/Lease Name: PITTS 22-14-4 | |
License Status: Producing | |
License Date: 2013-12-17 | |
Spud Date: 2013-10-29 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2014-02-26 | |
Well Total Depth: 14312.00 ft | |
Configuration: Horizontal | |
Latitude: 40.680000 | |
Longitude: -80.910000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-05-09 | Proposed Formations:TRENTON BLACK RIVER, Issued Date:5/9/2013, Expired Date:5/9/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2013-12-17 | Proposed Formations:POINT PLEASANT, Issued Date:12/17/2013, Expired Date:12/17/2015 12:00:00 PM, Drilling unit acres:459.64, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2014-02-26 | |
Correction to Well | 2014-07-11 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Completion Report Received | 2015-01-12 | |
Construction Permit Expires | 2015-12-17 | |
Record Last Modified | 2019-06-11 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-11-03 | 8558 | 14103 | 0 |
8558 | 14103 | 0 | |
8558 | 14103 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 07/20/2014 | 07/26/2014 | 7859 | 8,111,800.0 | 672459 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | ||||||||
A264, B244, B317, J218, J475, J580,
J609, J610, L058, Acid, Hydrochloric 7.5pct, Northern White Sand, 100 Mesh Sand |
SCHLUMBERGER | Anti-Bacterial Agent, Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent, Scale Inhibitor, Acid, Proppant - Natural | Aliphatic alcohols, ethoxylated # 1 | NA | 30 | 0.00031 | 0 | |
Potassium Hydroxide | 001310-58-3 | 15 | 0.006 | 0 | ||||
Ammonium Sulfate | 007783-20-2 | 30 | 0.01361 | 0 | ||||
Ammonium Persulfate | 007727-54-0 | 100 | 0.00231 | 0 | ||||
Trisodium Ortho Phosphate | 007601-54-9 | 5 | 0.00061 | 0 | ||||
Aliphatic acid | NA | 30 | 0.00031 | 0 | ||||
Aliphatic polyol | NA | 30 | 0.012 | 0 | ||||
Ethylene Glycol | 000107-21-1 | 5 | 0.00061 | 0 | ||||
Glutaraldehyde (Pentanediol) | 000111-30-8 | 25 | 0.0048 | 0 | ||||
Hydrochloric Acid | 007647-01-0 | 8 | 0.08801 | 0 | ||||
Aliphatic amine polymer | NA | 30 | 0.01361 | 0 | ||||
Propargyl Alcohol (2-Propynol) | 000107-19-7 | 10 | 0.0001 | 0 | ||||
Ammonium Persulfate | 007727-54-0 | 100 | 0.00041 | 0 | ||||
Sodium Erythorbate | 006381-77-7 | 100 | 0.00036 | 0 | ||||
Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 10.4371 | 0 | ||||
Carbohydrate polymer | NA | 100 | 0.06564 | 0 | ||||
Methanol (Methyl Alcohol) | 000067-56-1 | 40 | 0.00042 | 0 | ||||
Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 4.3472 | 0 | ||||
Water | 007732-18-5 | 93 | 1.08543 | 0 | ||||
Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 76.5378 | 0 | |
Recycled Produced Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 7.3179 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-07-26 | H2O | 8 | 2827 Bbl | 336240 | Schlumberger | STAGE 36/36
30 SHOTS |
2014-07-20 | H2O | 8 | 3076 Bbl | 335340 | Schlumberger | STAGE 1/36
30 SHOTS STAGES 2-35 SEE IMAGES |
H2O | 8 | 0 | 0 | Schlumberger |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | CHESAPEAKE EXPLORATION LLC | 224709 | 3748 | 52 |
2015 | CHESAPEAKE EXPLORATION LLC | 1105945 | 5539 | 341 |
2016 | CHESAPEAKE EXPLORATION LLC | 691873 | 913 | 351 |
2017 | CHESAPEAKE EXPLORATION LLC | 510797 | 300 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | 403391 | 117 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | 86984 | 11 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | CHESAPEAKE EXPLORATION LLC | Brine | 8836 | 52 |
2015 | CHESAPEAKE EXPLORATION LLC | Brine | 10749 | 341 |
2016 | CHESAPEAKE EXPLORATION LLC | Brine | 2041 | 351 |
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 4678 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 3005 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | Brine | 869 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1057435392 | 2015-4-28 0:00: | PW | No Violations | 1.00 |
-1594859826 | 2014-12-11 0:00 | PL | No Violations | |
-1977332889 | 2017-1-30 0:00: | PW | No Violations | 1.00 |
-1990408174 | 2013-10-31 0:00 | CS | No Violations | |
-509901833 | 2014-2-28 0:00: | CS | No Violations | |
-672417290 | 2016-3-29 0:00: | PW | No Violations | |
0509901833 | 2014-02-28 | Casing String Witnessed | No Violations
-based mud used to drill and condition the hole, a lead cement followed by a tail cement were pumped. The Mudpush spacer was mudscaled, and pumped at 12.5 pounds per gallon (ppg). Schlumberger then pumped 260 bbls of lead cement at 13.5 ppg, and 313 bbls of tail cement at 15.0 ppg. The plug was dropped and displaced with 310 bbls of water as measured by pump truck tanks. The plug bumped the float collar at 6:55am on 02/28/2014. The plug landing pressure was 2883 psi, and it was raised to 3378 psi, and held for 5 minutes. Pressure held. The float held when the pressure was released, and 4.0 bbls of water bled back. | |
0672417290 | 2016-03-29 | Production Wells | No Violations | I was on location for a status check. My inspection found the access road gate locked and the
access road is in good repair. An identification sign at the access road entrance, well, and tank battery. The pad is fenced and all man doors are locked. The #1H well is in production. The well is equipped with a christmas tree valve assembly. There is a steel dike around the tank battery. The equipment on the pad consists of the following: 6 - Storage tanks 400 bbl 1 - Vapor recovery unit (VRU) 6 - Gas processing units (GPU) 1 - Vertical separator 6 - Sand separator 1 - Thermal electric generator 6 - Producing wells Site fenced and man doors locked |
1001970677 | 2013-10-29 | Drill / Deepen / Reopen | No Violations | I was at the site to check the progress on the conductor drilling operation. Precision Rathole was on location and had just begun drilling the conductor hole for the Pitts 1. A second rig was on site and had just begun drilling the conductor hole for the Pitts 6. |
1057435392 | 2015-04-28 | Production Wells | No Violations | I meet with the Federal EPA at this location. They performed an Air Quality Inspection of the well and tank battery. I performed a status check of the tank battery and well head. ID signs are posted. No violations were noted at this time. |
1395692430 | 2014-02-26 | Drill / Deepen / Reopen | No Violations | I was at the site to discuss the surface and intermediate sections of the well, and pick up the associated casing and cementing paperwork. I met with Larry Williamson, drilling consultant. Mr. Williamson informed me that the rig should reach total depth for the well tonight, and likely cement production casing tomorrow night. |
1594859826 | 2014-12-11 | Preliminary Restoration | No Violations
-lined and sealed secondary containment. There are concrete barriers protecting the containment from vehicles. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipaters. There is a truck grounding area for trucks collecting condensate and/or produced water. Along the interior of the chain link fence there are two site drains installed. There is an earthen berm, with well-established ground cover. The soil stockpile is well stabilized with vegetation. Crops, woodlands and/or underbrush are growing normally outside the area of disturbance. Drainage and erosion controls outside the pad are in place and functioning. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. Preliminary | |
1977332889 | 2017-01-30 | Production Wells | No Violations | The purpose for my inspection was to conduct a status check on well (#2-1816-00- |
1990408174 | 2013-10-31 | Casing String Witnessed | No Violations | |
734438482 | 2020-7-8 0:00:0 | PW | No Violations | 1.00 |
For data sources see[10]