X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0244282315000

Well Details

Well ID: 0244282315000
Loading map...
Location: 00/15-23-024-28W4/0
Location Alias: 00/15-23-24-28 W4M
Location Alias 2: 00/15-23-024-28 W4/00
Province: Alberta
County/Municipality: Rocky View County
Well Name: PCP 15B CROSSFIELD 15-23-24-28
Operator Name:
License Number: 0188375
License Date: 1996-06-05
License Status: RecCertified
Spud Date: 1996-06-18
Final Drill Date: 1996-07-26
Well Total Depth: 2510 m
Surface Hole Latitude: 51.072033
Surface Hole Longitude: -113.794504

For data sources see[1][2]

Directional Drilling

Start Date Depth (m) Reason
1996-06-18 0
1996-06-30 1453
1996-07-18 1995 Sidetrack fish

For data sources see[3]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-12-01 Perforation 2469 2472 20
1996-12-06 Fracture 2469 2472 0
1997-09-17 Packing Device Capped w/Cement 2438 2446 0
2004-05-21 Hydra Jet Perforation 1164 1168 1
2004-05-23 Remedial Casing Cementing 1164 1168 0
2004-05-24 Hydra Jet Perforation 1133 1137 1
2004-05-28 Remedial Casing Cementing 1133 1137 0
2004-05-29 Hydra Jet Perforation 1084 1088 1
2004-05-30 Remedial Casing Cementing 1084 1088 0
2004-05-31 Hydra Jet Perforation 930 934 1
2004-06-01 Remedial Casing Cementing 930 934 0
2004-06-02 Hydra Jet Perforation 911 915 1
2004-06-03 Remedial Casing Cementing 911 915 0
2006-06-01 Perforation 689 690 17
2006-06-01 Perforation 688 689 17
2006-06-01 Perforation 687 688 17
2006-06-03 Packing Device Capped w/Cement 667.8 679.8 0
2006-06-03 Perforation 500 501 17
2006-06-03 Perforation 499 500 17
2006-06-03 Perforation 498 499 17
2006-06-05 Hydra Jet Perforation 498 502 1
2006-06-06 Cement Squeeze 498 502 0
2006-06-19 Packing Device Capped w/Cement 431.5 504.8 0

For data sources see[4]



References