If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0244282315000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.072033,"lon":-113.794504,"icon":""}]} |
| Location: 00/15-23-024-28W4/0 | |
| Location Alias: 00/15-23-24-28 W4M | |
| Location Alias 2: 00/15-23-024-28 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 024 | |
| Meridian: 4 | |
| Range: 28 | |
| Section: 23 | |
| County/Municipality: Rocky View County | |
| Well Name: PCP 15B CROSSFIELD 15-23-24-28 | |
| Operator Name: Ovintiv Canada ULC | |
| License Number: 0188375 | |
| License Date: 1996-06-05 | |
| License Status: RecCertified | |
| Spud Date: 1996-06-18 | |
| Final Drill Date: 1996-07-26 | |
| Well Total Depth: 2510.00 m | |
| Surface Hole Latitude: 51.072033 | |
| Surface Hole Longitude: -113.794504 |
| Date | Event |
|---|---|
| 1996-06-05 | Obtained License |
| 1996-06-18 | Direction Drilling Operation Performed - Deviate |
| 1996-06-21 | Surface Casing Operation Performed |
| 1996-06-29 | Plug Back Performed |
| 1996-06-30 | Direction Drilling Operation Performed - Deviate |
| 1996-07-02 | Well Log Performed |
| 1996-07-16 | Plug Back Performed |
| 1996-07-18 | Direction Drilling Operation Performed - Sidetrack Fish |
| 1996-07-26 | Finished Drilling |
| 1996-07-26 | Well Log Performed |
| 1996-07-27 | Well Log Performed |
| 1996-07-29 | Production Casing Operation Performed |
| 1996-07-29 | Rig Released |
| 1996-11-26 | Well Log Performed |
| 1996-11-30 | Well Log Performed |
| 1996-12-01 | Perforation Treatment Performed - Jet Perforation |
| 1996-12-06 | Perforation Treatment Performed - Fractured |
| 1997-09-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1997-09-17 | Plug Back Performed |
| 1997-09-17 | Well Log Performed |
| 1997-09-24 | Well Mode changed to Abandoned |
| 2003-11-22 | Well Log Performed |
| 2003-11-25 | Well Log Performed |
| 2004-05-21 | Perforation Treatment Performed - Abrasa-Jet Perforation |
| 2004-05-22 | Well Log Performed |
| 2004-05-23 | Perforation Treatment Performed - Remedial Casing |
| 2004-05-24 | Perforation Treatment Performed - Abrasa-Jet Perforation |
| 2004-05-28 | Perforation Treatment Performed - Remedial Casing |
| 2004-05-28 | Well Log Performed |
| 2004-05-29 | Perforation Treatment Performed - Abrasa-Jet Perforation |
| 2004-05-30 | Perforation Treatment Performed - Remedial Casing |
| 2004-05-30 | Well Log Performed |
| 2004-05-31 | Perforation Treatment Performed - Abrasa-Jet Perforation |
| 2004-06-01 | Perforation Treatment Performed - Remedial Casing |
| 2004-06-01 | Well Log Performed |
| 2004-06-02 | Perforation Treatment Performed - Abrasa-Jet Perforation |
| 2004-06-03 | Perforation Treatment Performed - Remedial Casing |
| 2004-06-03 | Well Log Performed |
| 2006-06-01 | Perforation Treatment Performed - Jet Perforation |
| 2006-06-01 | Well Log Performed |
| 2006-06-02 | Well Log Performed |
| 2006-06-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2006-06-03 | Perforation Treatment Performed - Jet Perforation |
| 2006-06-03 | Well Log Performed |
| 2006-06-05 | Perforation Treatment Performed - Abrasa-Jet Perforation |
| 2006-06-06 | Perforation Treatment Performed - Cement Squeeze |
| 2006-06-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2007-11-01 | Well Abandoned |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 1996-06-18 | 0.00 | Deviate (5 - 79 degrees) |
| 1996-06-30 | 1453.00 | Deviate (5 - 79 degrees) |
| 1996-07-18 | 1995.00 | Sidetrack fish |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1996-12-01 | Perforation | 2469.00 | 2472.00 | 20 |
| 2004-05-31 | Hydra Jet Perforation | 930.00 | 934.00 | 1 |
| 2004-06-01 | Remedial Casing Cementing | 930.00 | 934.00 | 0 |
| 2004-06-02 | Hydra Jet Perforation | 911.00 | 915.00 | 1 |
| 2004-06-03 | Remedial Casing Cementing | 911.00 | 915.00 | 0 |
| 2006-06-01 | Perforation | 689.00 | 690.00 | 17 |
| 2006-06-01 | Perforation | 688.00 | 689.00 | 17 |
| 2006-06-01 | Perforation | 687.00 | 688.00 | 17 |
| 2006-06-03 | Packing Device Capped w/Cement | 667.80 | 679.80 | 0 |
| 2006-06-03 | Perforation | 500.00 | 501.00 | 17 |
| 2006-06-03 | Perforation | 499.00 | 500.00 | 17 |
| 1996-12-06 | Fracture | 2469.00 | 2472.00 | 0 |
| 2006-06-03 | Perforation | 498.00 | 499.00 | 17 |
| 2006-06-05 | Hydra Jet Perforation | 498.00 | 502.00 | 1 |
| 2006-06-06 | Cement Squeeze | 498.00 | 502.00 | 0 |
| 2006-06-19 | Packing Device Capped w/Cement | 431.50 | 504.80 | 0 |
| 1997-09-17 | Packing Device Capped w/Cement | 2438.00 | 2446.00 | 0 |
| 2004-05-21 | Hydra Jet Perforation | 1164.00 | 1168.00 | 1 |
| 2004-05-23 | Remedial Casing Cementing | 1164.00 | 1168.00 | 0 |
| 2004-05-24 | Hydra Jet Perforation | 1133.00 | 1137.00 | 1 |
| 2004-05-28 | Remedial Casing Cementing | 1133.00 | 1137.00 | 0 |
| 2004-05-29 | Hydra Jet Perforation | 1084.00 | 1088.00 | 1 |
| 2004-05-30 | Remedial Casing Cementing | 1084.00 | 1088.00 | 0 |
For data sources see[5]