If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0444210907004 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.777429,"lon":-112.989016,"icon":""}]} |
Location: 00/07-09-044-21W4/4 | |
Location Alias: 00/07-09-44-21 W4M | |
Location Alias 2: 00/07-09-044-21 W4/04 | |
Province: Alberta | |
County/Municipality: Camrose County | |
Well Name: RIFE FERINTOSH 7-9-44-21 | |
Operator Name: | |
License Number: 0155144 | |
License Date: 1992-12-14 | |
License Status: Abandoned | |
Spud Date: 1993-01-07 | |
Final Drill Date: 1993-01-15 | |
Well Total Depth: 1425 m | |
Surface Hole Latitude: 52.777429 | |
Surface Hole Longitude: -112.989016 |
Start Date | Depth (m) | Reason |
---|---|---|
1993-01-10 | 528 |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1993-02-14 | Perforation | 1332.4 | 1333.4 | 13 |
2000-02-13 | Perforation | 1376.2 | 1377.2 | 17 |
2004-06-02 | Perforation | 1307.5 | 1310 | 20 |
2004-09-29 | Packing Device Capped w/Cement | 1292 | 1300 | 0 |
2004-09-29 | Perforation | 1129.5 | 1132 | 20 |
2005-09-14 | Packing Device Capped w/Cement | 1117 | 1125 | 0 |
2005-09-14 | Perforation | 607.5 | 610 | 20 |
2006-03-02 | Fracture | 607.5 | 610 | 0 |
2006-09-06 | Acid Treatment | 607.5 | 610 | 0 |
2018-11-15 | Packing Device Capped w/Cement | 589.9 | 600 | 0 |
2018-11-28 | Perforation | 359 | 360 | 17 |
2018-12-02 | Remedial Casing Cementing | 359 | 360 | 0 |
2018-12-06 | Cement Plug | 340 | 359 | 0 |
2018-12-12 | Perforation | 338 | 339 | 17 |
2018-12-12 | Perforation | 325.6 | 326.6 | 17 |
2018-12-13 | Remedial Casing Cementing | 325.6 | 326.6 | 0 |
2018-12-13 | Remedial Casing Cementing | 338 | 339 | 0 |
2018-12-14 | Cement Plug | 310 | 325.6 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 701 | 17.9 | 0.0 | 1.8 |
2006 | 2409 | 259.1 | 0.0 | 157.9 |
2007 | 10 | 0.0 | 0.0 | 10.3 |
For data sources see[5]