If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0444210907004 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.777429,"lon":-112.989016,"icon":""}]} |
Location: 00/07-09-044-21W4/4 | |
Location Alias: 00/07-09-44-21 W4M | |
Location Alias 2: 00/07-09-044-21 W4/04 | |
Country: Canada | |
Province: Alberta | |
Township: 044 | |
Meridian: 4 | |
Range: 21 | |
Section: 09 | |
County/Municipality: Camrose County | |
Well Name: RIFE FERINTOSH 7-9-44-21 | |
Operator Name: Rife Resources Ltd. | |
License Number: 0155144 | |
License Date: 1992-12-14 | |
License Status: Abandoned | |
Spud Date: 1993-01-07 | |
Final Drill Date: 1993-01-15 | |
Well Total Depth: 1425.00 m | |
Surface Hole Latitude: 52.777429 | |
Surface Hole Longitude: -112.989016 |
Date | Event |
---|---|
1992-12-14 | Obtained License |
1993-01-08 | Surface Casing Operation Performed |
1993-01-10 | Direction Drilling Operation Performed - Deviate |
1993-01-13 | Well Log Performed |
1993-01-15 | Finished Drilling |
1993-01-15 | Well Log Performed |
1993-01-15 | Well Mode changed to Drilled and Cased |
1993-01-19 | Well Log Performed |
1993-01-21 | Production Casing Operation Performed |
1993-01-21 | Rig Released |
1993-02-12 | Well Log Performed |
1993-02-13 | Well Log Performed |
1993-02-14 | Perforation Treatment Performed - Jet Perforation |
1999-11-20 | Well Log Performed |
1999-11-21 | Well Log Performed |
2000-02-13 | Perforation Treatment Performed - Jet Perforation |
2000-02-13 | Well Log Performed |
2000-02-21 | Production Casing Operation Performed |
2004-06-02 | Perforation Treatment Performed - Jet Perforation |
2004-06-02 | Well Log Performed |
2004-09-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-09-29 | Perforation Treatment Performed - Jet Perforation |
2004-09-29 | Plug Back Performed |
2004-09-29 | Well Log Performed |
2005-09-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-09-14 | Perforation Treatment Performed - Jet Perforation |
2005-09-14 | Plug Back Performed |
2005-09-14 | Well Log Performed |
2005-09-30 | Well Began Production |
2005-09-30 | Well Fluid changed to Gas |
2005-09-30 | Well Mode changed to Flowing |
2006-03-02 | Perforation Treatment Performed - Fractured |
2006-09-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2017-08-31 | Well Fluid changed to Gas |
2017-08-31 | Well Mode changed to Suspended |
2018-11-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2018-11-15 | Plug Back Performed |
2018-11-15 | Well Fluid changed to Gas |
2018-11-15 | Well Mode changed to Abandoned Zone |
2018-11-28 | Perforation Treatment Performed - Jet Perforation |
2018-11-28 | Well Log Performed |
2018-12-02 | Perforation Treatment Performed - Remedial Casing |
2018-12-06 | Perforation Treatment Performed - Cement Plug |
2018-12-06 | Plug Back Performed |
2018-12-12 | Perforation Treatment Performed - Jet Perforation |
2018-12-13 | Perforation Treatment Performed - Remedial Casing |
2018-12-14 | Perforation Treatment Performed - Cement Plug |
2018-12-14 | Plug Back Performed |
2018-12-18 | Well Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1993-01-10 | 528.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1993-02-14 | Perforation | 1332.40 | 1333.40 | 13 |
2018-11-15 | Packing Device Capped w/Cement | 589.90 | 600.00 | 0 |
2018-11-28 | Perforation | 359.00 | 360.00 | 17 |
2018-12-02 | Remedial Casing Cementing | 359.00 | 360.00 | 0 |
2018-12-06 | Cement Plug | 340.00 | 359.00 | 0 |
2018-12-12 | Perforation | 338.00 | 339.00 | 17 |
2018-12-12 | Perforation | 325.60 | 326.60 | 17 |
2018-12-13 | Remedial Casing Cementing | 325.60 | 326.60 | 0 |
2018-12-13 | Remedial Casing Cementing | 338.00 | 339.00 | 0 |
2018-12-14 | Cement Plug | 310.00 | 325.60 | 0 |
2000-02-13 | Perforation | 1376.20 | 1377.20 | 17 |
2004-06-02 | Perforation | 1307.50 | 1310.00 | 20 |
2004-09-29 | Packing Device Capped w/Cement | 1292.00 | 1300.00 | 0 |
2004-09-29 | Perforation | 1129.50 | 1132.00 | 20 |
2005-09-14 | Packing Device Capped w/Cement | 1117.00 | 1125.00 | 0 |
2005-09-14 | Perforation | 607.50 | 610.00 | 20 |
2006-03-02 | Fracture | 607.50 | 610.00 | 0 |
2006-09-06 | Acid Treatment | 607.50 | 610.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 701 | 0.0 | 0.0 | 0.0 |
2006 | 2409 | 0.0 | 0.0 | 0.0 |
2007 | 10 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-11-15 | No Incident Encountered | 0.00 | 0.00 |
2018-11-28 | No Incident Encountered | 0.00 | 0.00 |
2018-12-02 | No Incident Encountered | 0.00 | 0.00 |
2018-12-06 | No Incident Encountered | 0.00 | 0.00 |
2018-12-11 | No Incident Encountered | 0.00 | 0.00 |
2018-12-12 | No Incident Encountered | 0.00 | 0.00 |
2018-12-13 | No Incident Encountered | 0.00 | 0.00 |
2018-12-14 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]