0816042014000

Well Details

Well ID: 0816042014000
Loading map...
Location: 00/14-20-081-04W6/0
Location Alias: 00/14-20-81-04 W6M
Location Alias 2: 00/14-20-081-04 W6/00
Province: Alberta
County/Municipality: Municipal District of Fairview No. 136
Well Name: CNRL DGU DUNVEG 14-20-81-4
Operator Name:
License Number: 0081959
License Date: 1980-04-02
License Status: Abandoned
Spud Date: 1980-05-07
Final Drill Date: 1980-05-27
Well Total Depth: 1720 m
Surface Hole Latitude: 56.040856
Surface Hole Longitude: -118.580925

For data sources see[1][2]

Directional Drilling

Start Date Depth (m) Reason
1980-05-07 299 Conversion

For data sources see[3]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-07-23 Perforation 1653.2 1654 3
1980-07-23 Selective Jet Perforation 1648.5 1648.5 0
1980-07-23 Selective Jet Perforation 1649.5 1649.5 0
1980-07-23 Selective Jet Perforation 1650.5 1650.5 0
1980-07-23 Perforation 1642.5 1646.5 3
1980-07-23 Perforation 1640.7 1641.3 3
1980-07-23 Perforation 1638.5 1640 3
1980-07-23 Perforation 1637 1637.8 3
1980-07-23 Perforation 1635.5 1636.2 3
1980-07-23 Selective Jet Perforation 1633 1633 0
1980-07-24 Acid Treatment 1633 1654 0
1980-07-25 Fracture 1633 1654 0
1980-07-29 Perforation 1625 1625.5 3
1980-07-29 Perforation 1622 1624 3
1980-07-29 Perforation 1619.5 1621 3
1980-07-29 Perforation 1614.8 1615.2 3
1980-07-29 Perforation 1611.8 1613.3 3
1980-07-29 Acid Treatment 1611.8 1625.5 0
1980-07-30 Fracture 1611.8 1625.5 0
1980-08-02 Perforation 1596.8 1603.8 9
1980-08-02 Perforation 1594.3 1595 3
1980-08-02 Selective Jet Perforation 1592.6 1592.6 0
1980-08-03 Fracture 1592.6 1603.8 0
1980-08-04 Selective Jet Perforation 1576 1576 0
1980-08-04 Perforation 1578 1579.5 3
1980-08-04 Perforation 1581.3 1582.5 3
1980-08-05 Acid Treatment 1576 1582.5 0
1980-08-06 Fracture 1576 1582.5 0
2013-05-10 Packing Device Capped w/Cement 659 1569 0
2013-05-10 Cement Plug 10 659 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 687 3895.2 0.0 6.9
1981 6041 20017.7 0.0 48.4
1982 8233 14359.7 0.0 18.9
1983 7556 20785.3 0.0 36.7
1984 5359 19100.0 0.0 44.0
1985 7989 24176.2 0.0 66.4
1986 6044 17895.7 0.0 32.7
1987 7597 20166.9 0.0 34.5
1988 8004 20609.2 0.0 33.6
1989 7986 17917.4 0.0 47.3
1990 6770 14296.5 0.0 73.6
1991 6873 12594.9 0.0 53.1
1992 7956 13359.3 0.0 24.6
1993 8082 11460.0 0.0 19.1
1994 8534 10258.6 0.0 20.6
1995 8540 9365.8 0.0 82.0
1996 7941 8749.1 0.0 117.0
1997 8449 8423.7 0.0 21.6
1998 8341 7926.9 0.0 11.6
1999 7897 7184.2 0.0 874.1
2000 8451 8137.8 0.0 349.7
2001 8329 7157.9 0.0 469.2
2002 8528 6673.6 0.0 42.9
2003 8381 5823.1 0.0 11.0
2004 8702 5917.2 0.0 42.3
2005 8591 5559.4 0.0 30.8
2006 8647 4974.3 0.0 36.8
2007 8519 4832.1 0.0 23.0
2008 8471 4739.8 0.0 47.2
2009 8416 4381.3 0.0 36.3
2010 8537 3679.8 0.0 15.1
2011 8277 3829.5 0.0 58.4
2012 8172 3945.4 0.0 192.8
2013 2951 1216.2 0.0 48.6

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-05-07 Lost Circulation 1.00 7.60
1980-05-09 Lost Circulation 241.00 270.00
2013-05-05 No Incident N/A N/A

For data sources see[6]