X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0816042014000

Well Details

Well ID: 0816042014000
Loading map...
Location: 00/14-20-081-04W6/0
Location Alias: 00/14-20-81-04 W6M
Location Alias 2: 00/14-20-081-04 W6/00
Country: Canada
Province: Alberta
Township: 081
Meridian: 6
Range: 04
Section: 20
County/Municipality: Municipal District of Fairview No. 136
Well Name: CNRL DGU DUNVEG 14-20-81-4
Operator Name: Canadian Natural Resources Limited
License Number: 0081959
License Date: 1980-04-02
License Status: Abandoned
Spud Date: 1980-05-07
Final Drill Date: 1980-05-27
Well Total Depth: 1720.00 m
Surface Hole Latitude: 56.040856
Surface Hole Longitude: -118.580925

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-04-02 Obtained License
1980-05-07 Direction Drilling Operation Performed - 98
1980-05-07 Lost Circulation Occurred
1980-05-09 Lost Circulation Occurred
1980-05-27 Finished Drilling
1980-05-27 Well Log Performed
1980-05-29 Production Casing Operation Performed
1980-05-30 Well Mode changed to Drilled and Cased
1980-07-23 Perforation Treatment Performed - Jet Perforation
1980-07-23 Perforation Treatment Performed - Selective Jet Perforations
1980-07-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-07-25 Perforation Treatment Performed - Fractured
1980-07-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-07-29 Perforation Treatment Performed - Jet Perforation
1980-07-30 Perforation Treatment Performed - Fractured
1980-08-02 Perforation Treatment Performed - Jet Perforation
1980-08-02 Perforation Treatment Performed - Selective Jet Perforations
1980-08-03 Perforation Treatment Performed - Fractured
1980-08-04 Perforation Treatment Performed - Jet Perforation
1980-08-04 Perforation Treatment Performed - Selective Jet Perforations
1980-08-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-08-06 Perforation Treatment Performed - Fractured
1980-10-03 Well Began Production
1980-10-03 Well Fluid changed to Gas
1980-10-03 Well Mode changed to Flowing
1983-05-01 Well Fluid changed to Gas
1983-05-01 Well Mode changed to Flowing
2013-05-08 Well Log Performed
2013-05-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-05-10 Perforation Treatment Performed - Cement Plug
2013-05-10 Plug Back Performed
2013-05-10 Well Fluid changed to Gas
2013-05-10 Well Mode changed to Abandoned Zone
2013-05-11 Well Abandoned
2013-05-11 Well Fluid changed to Gas
2013-05-11 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1980-05-07 299.00 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-07-23 Perforation 1653.20 1654.00 3
1980-07-23 Selective Jet Perforations 1633.00 1633.00 0
1980-07-24 Acid Treatment 1633.00 1654.00 0
1980-07-25 Fracture 1633.00 1654.00 0
1980-07-29 Perforation 1625.00 1625.50 3
1980-07-29 Perforation 1622.00 1624.00 3
1980-07-29 Perforation 1619.50 1621.00 3
1980-07-29 Perforation 1614.80 1615.20 3
1980-07-29 Perforation 1611.80 1613.30 3
1980-07-29 Acid Treatment 1611.80 1625.50 0
1980-07-30 Fracture 1611.80 1625.50 0
1980-07-23 Selective Jet Perforations 1648.50 1648.50 0
1980-08-02 Perforation 1596.80 1603.80 9
1980-08-02 Perforation 1594.30 1595.00 3
1980-08-02 Selective Jet Perforations 1592.60 1592.60 0
1980-08-03 Fracture 1592.60 1603.80 0
1980-08-04 Selective Jet Perforations 1576.00 1576.00 0
1980-08-04 Perforation 1578.00 1579.50 3
1980-08-04 Perforation 1581.30 1582.50 3
1980-08-05 Acid Treatment 1576.00 1582.50 0
1980-08-06 Fracture 1576.00 1582.50 0
2013-05-10 Packing Device Capped w/Cement 659.00 1569.00 0
1980-07-23 Selective Jet Perforations 1649.50 1649.50 0
2013-05-10 Cement Plug 10.00 659.00 0
1980-07-23 Selective Jet Perforations 1650.50 1650.50 0
1980-07-23 Perforation 1642.50 1646.50 3
1980-07-23 Perforation 1640.70 1641.30 3
1980-07-23 Perforation 1638.50 1640.00 3
1980-07-23 Perforation 1637.00 1637.80 3
1980-07-23 Perforation 1635.50 1636.20 3

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 687 0.0 0.0 0.0
1981 6041 0.0 0.0 0.0
1982 8233 0.0 0.0 0.0
1983 7556 0.0 0.0 0.0
1984 5359 0.0 0.0 0.0
1985 7989 0.0 0.0 0.0
1986 6044 0.0 0.0 0.0
1987 7597 0.0 0.0 0.0
1988 8004 0.0 0.0 0.0
1989 7986 0.0 0.0 0.0
1990 6770 0.0 0.0 0.0
1991 6873 0.0 0.0 0.0
1992 7956 0.0 0.0 0.0
1993 8082 0.0 0.0 0.0
1994 8534 0.0 0.0 0.0
1995 8540 0.0 0.0 0.0
1996 7941 0.0 0.0 0.0
1997 8449 0.0 0.0 0.0
1998 8341 0.0 0.0 0.0
1999 7897 0.0 0.0 0.0
2000 8451 0.0 0.0 0.0
2001 8329 0.0 0.0 0.0
2002 8528 0.0 0.0 0.0
2003 8381 0.0 0.0 0.0
2004 8702 0.0 0.0 0.0
2005 8591 0.0 0.0 0.0
2006 8647 0.0 0.0 0.0
2007 8519 0.0 0.0 0.0
2008 8471 0.0 0.0 0.0
2009 8416 0.0 0.0 0.0
2010 8537 0.0 0.0 0.0
2011 8277 0.0 0.0 0.0
2012 8172 0.0 0.0 0.0
2013 2951 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-05-07 Lost Circulation 1.00 7.60
1980-05-09 Lost Circulation 241.00 270.00
2013-05-05 No Incident Encountered 0.00 0.00

For data sources see[7]

References