If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0625260910000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.341479,"lon":-117.80345,"icon":""}]} |
Location: 00/10-09-062-26W5/0 | |
Location Alias: 00/10-09-62-26 W5M | |
Location Alias 2: 00/10-09-062-26 W5/00 | |
Province: Alberta | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: CEQUENCE HZ SIMON 10-9-62-26 | |
Operator Name: Cequence Energy Ltd. | |
License Number: 0438641 | |
License Date: 2011-11-09 | |
License Status: Amended | |
Spud Date: 2011-12-16 | |
Final Drill Date: 2012-01-16 | |
Well Total Depth: 4800 m | |
Surface Hole Latitude: 54.341479 | |
Surface Hole Longitude: -117.80345 |
Start Date | Depth (m) | Reason |
---|---|---|
2011-12-18 | 2514 | Horizontal |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-02-01 | Open Hole/Barefoot Completion | 4762.9 | 4800 | 0 |
2012-02-02 | Multi-Stage Fracture | 4740 | 4741 | 0 |
2012-02-02 | Multi-Stage Fracture | 4609.8 | 4609.9 | 0 |
2012-02-02 | Multi-Stage Fracture | 4482.8 | 4482.9 | 0 |
2012-02-02 | Multi-Stage Fracture | 4354.1 | 4354.2 | 0 |
2012-02-02 | Multi-Stage Fracture | 4225.2 | 4225.3 | 0 |
2012-02-02 | Multi-Stage Fracture | 4085.7 | 4085.8 | 0 |
2012-02-02 | Multi-Stage Fracture | 3961.3 | 3961.4 | 0 |
2012-02-02 | Multi-Stage Fracture | 3835.7 | 3835.8 | 0 |
2012-02-03 | Multi-Stage Fracture | 3698.8 | 3698.9 | 0 |
2012-02-03 | Multi-Stage Fracture | 3600 | 3600.1 | 0 |
2012-02-03 | Multi-Stage Fracture | 3474.6 | 3474.7 | 0 |
2012-02-03 | Multi-Stage Fracture | 3376.1 | 3376.2 | 0 |
2012-02-03 | Multi-Stage Fracture | 3268.9 | 3269 | 0 |
2012-02-03 | Multi-Stage Fracture | 3184.1 | 3184.2 | 0 |
2012-02-03 | Multi-Stage Fracture | 3076.1 | 3076.2 | 0 |
2012-02-04 | Multi-Stage Fracture | 2983.2 | 2983.3 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 6127 | 4540.6 | 0.0 | 0.0 |
2013 | 7824 | 2238.4 | 0.0 | 334.3 |
2014 | 8255 | 2025.6 | 0.0 | 543.4 |
2015 | 720 | 370.5 | 0.0 | 98.7 |
2016 | 1129 | 318.9 | 0.0 | 72.7 |
2017 | 7560 | 1927.9 | 0.0 | 173.7 |
2018 | 601 | 75.6 | 0.0 | 0.0 |
For data sources see[5]