X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625260910000

Well Details

Well ID: 0625260910000
Loading map...
Location: 00/10-09-062-26W5/0
Location Alias: 00/10-09-62-26 W5M
Location Alias 2: 00/10-09-062-26 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 26
Section: 09
County/Municipality: Municipal District of Greenview No. 16
Well Name: CEQUENCE HZ SIMON 10-9-62-26
Operator Name: Cequence Energy Ltd.
License Number: 0438641
License Date: 2011-11-09
License Status: Amended
Spud Date: 2011-12-16
Final Drill Date: 2012-01-16
Well Total Depth: 4800.00 m
Surface Hole Latitude: 54.341479
Surface Hole Longitude: -117.803450

For data sources see[1][2]

Well History

Date Event
2011-11-09 Obtained License
2011-12-18 Direction Drilling Operation Performed - Horizontal
2011-12-19 Surface Casing Operation Performed
2011-12-31 Well Log Performed
2012-01-01 Well Log Performed
2012-01-02 Intermediate Casing Operation Performed
2012-01-16 Finished Drilling
2012-01-16 Well Mode changed to Drilled and Cased
2012-01-19 Liner Casing Operation Performed
2012-01-21 Rig Released
2012-02-01 Perforation Treatment Performed - Open-Hole Completion
2012-02-02 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-03 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-04 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-05 Well Began Production
2012-02-05 Well Fluid changed to Gas
2012-02-05 Well Mode changed to Flowing
2019-06-30 Well Fluid changed to Gas
2019-06-30 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-12-18 2514.50 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-01 Open Hole/Barefoot Completion 4762.90 4800.00 0
2012-02-03 Multi-Stage Fracture 3698.80 3698.90 0
2012-02-03 Multi-Stage Fracture 3600.00 3600.10 0
2012-02-03 Multi-Stage Fracture 3474.60 3474.70 0
2012-02-03 Multi-Stage Fracture 3376.10 3376.20 0
2012-02-03 Multi-Stage Fracture 3268.90 3269.00 0
2012-02-03 Multi-Stage Fracture 3184.10 3184.20 0
2012-02-03 Multi-Stage Fracture 3076.10 3076.20 0
2012-02-04 Multi-Stage Fracture 2983.20 2983.30 0
2012-02-02 Multi-Stage Fracture 4740.00 4741.00 0
2012-02-02 Multi-Stage Fracture 4609.80 4609.90 0
2012-02-02 Multi-Stage Fracture 4482.80 4482.90 0
2012-02-02 Multi-Stage Fracture 4354.10 4354.20 0
2012-02-02 Multi-Stage Fracture 4225.20 4225.30 0
2012-02-02 Multi-Stage Fracture 4085.70 4085.80 0
2012-02-02 Multi-Stage Fracture 3961.30 3961.40 0
2012-02-02 Multi-Stage Fracture 3835.70 3835.80 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6127 0.0 0.0 0.0
2013 7824 0.0 0.0 0.0
2014 8255 0.0 0.0 0.0
2015 720 0.0 0.0 0.0
2016 1129 0.0 0.0 0.0
2017 7560 0.0 0.0 0.0
2018 601 0.0 0.0 0.0

For data sources see[6]

References