If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0625271611000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.35651,"lon":-117.976785,"icon":""}]} |
Location: 00/11-16-062-27W5/0 | |
Location Alias: 00/11-16-62-27 W5M | |
Location Alias 2: 00/11-16-062-27 W5/00 | |
Province: Alberta | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: CEQUENCE HZ SIMON 11-16-62-27 | |
Operator Name: Cequence Energy Ltd. | |
License Number: 0424793 | |
License Date: 2010-10-19 | |
License Status: Amended | |
Spud Date: 2010-11-03 | |
Final Drill Date: 2010-11-21 | |
Well Total Depth: 3720 m | |
Surface Hole Latitude: 54.35651 | |
Surface Hole Longitude: -117.976785 |
Start Date | Depth (m) | Reason |
---|---|---|
2010-11-09 | 2392 | Horizontal |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-12-07 | Open Hole/Barefoot Completion | 3454 | 3720 | 0 |
2010-12-08 | Multi-Stage Fracture | 3427.9 | 3432 | 0 |
2010-12-08 | Multi-Stage Fracture | 3391.2 | 3391.3 | 0 |
2010-12-08 | Multi-Stage Fracture | 3330.3 | 3330.4 | 0 |
2010-12-08 | Multi-Stage Fracture | 3259.5 | 3259.6 | 0 |
2010-12-09 | Multi-Stage Fracture | 3322.2 | 3322.3 | 0 |
2010-12-09 | Multi-Stage Fracture | 3132.8 | 3132.9 | 0 |
2010-12-09 | Multi-Stage Fracture | 3100.2 | 3100.3 | 0 |
2010-12-09 | Multi-Stage Fracture | 3052.9 | 3053 | 0 |
2010-12-09 | Multi-Stage Fracture | 3005.6 | 3005.7 | 0 |
2010-12-09 | Multi-Stage Fracture | 2930.5 | 2930.6 | 0 |
2010-12-10 | Multi-Stage Fracture | 2869.6 | 2869.7 | 0 |
2010-12-10 | Multi-Stage Fracture | 2808.6 | 2808.7 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 8111 | 7832.4 | 0.0 | 0.0 |
2012 | 8399 | 4348.8 | 0.0 | 0.0 |
2013 | 7872 | 3342.7 | 0.0 | 0.0 |
2014 | 8567 | 4437.1 | 0.0 | 0.0 |
2015 | 3120 | 2160.1 | 0.0 | 0.0 |
2016 | 6672 | 3820.3 | 0.0 | 0.0 |
2017 | 8208 | 3318.6 | 0.0 | 179.0 |
2018 | 7559 | 2694.2 | 0.0 | 202.0 |
2019 | 1872 | 553.8 | 0.0 | 20.5 |
For data sources see[5]