X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625271611000

Well Details

Well ID: 0625271611000
Loading map...
Location: 00/11-16-062-27W5/0
Location Alias: 00/11-16-62-27 W5M
Location Alias 2: 00/11-16-062-27 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 27
Section: 16
County/Municipality: Municipal District of Greenview No. 16
Well Name: CEQUENCE HZ SIMON 11-16-62-27
Operator Name: Cequence Energy Ltd.
License Number: 0424793
License Date: 2010-10-19
License Status: Amended
Spud Date: 2010-11-03
Final Drill Date: 2010-11-21
Well Total Depth: 3720.00 m
Surface Hole Latitude: 54.356510
Surface Hole Longitude: -117.976785

For data sources see[1][2]

Well History

Date Event
2010-10-19 Obtained License
2010-11-04 Surface Casing Operation Performed
2010-11-09 Direction Drilling Operation Performed - Horizontal
2010-11-14 Intermediate Casing Operation Performed
2010-11-21 Finished Drilling
2010-11-21 Well Mode changed to Drilled and Cased
2010-11-24 Liner Casing Operation Performed
2010-11-25 Rig Released
2010-12-01 Well Log Performed
2010-12-07 Perforation Treatment Performed - Open-Hole Completion
2010-12-08 Perforation Treatment Performed - Multi-Stage Fracture
2010-12-09 Perforation Treatment Performed - Multi-Stage Fracture
2010-12-10 Perforation Treatment Performed - Multi-Stage Fracture
2011-01-12 Well Began Production
2011-01-12 Well Fluid changed to Gas
2011-01-12 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-11-09 2392.20 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-12-07 Open Hole/Barefoot Completion 3454.00 3720.00 0
2010-12-09 Multi-Stage Fracture 3005.60 3005.70 0
2010-12-09 Multi-Stage Fracture 2930.50 2930.60 0
2010-12-10 Multi-Stage Fracture 2869.60 2869.70 0
2010-12-10 Multi-Stage Fracture 2808.60 2808.70 0
2010-12-08 Multi-Stage Fracture 3427.90 3432.00 0
2010-12-08 Multi-Stage Fracture 3391.20 3391.30 0
2010-12-08 Multi-Stage Fracture 3330.30 3330.40 0
2010-12-08 Multi-Stage Fracture 3259.50 3259.60 0
2010-12-09 Multi-Stage Fracture 3322.20 3322.30 0
2010-12-09 Multi-Stage Fracture 3132.80 3132.90 0
2010-12-09 Multi-Stage Fracture 3100.20 3100.30 0
2010-12-09 Multi-Stage Fracture 3052.90 3053.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 8111 0.0 0.0 0.0
2012 8399 0.0 0.0 0.0
2013 7872 0.0 0.0 0.0
2014 8567 0.0 0.0 0.0
2015 3120 0.0 0.0 0.0
2016 6672 0.0 0.0 0.0
2017 8208 0.0 0.0 0.0
2018 7559 0.0 0.0 0.0
2019 8064 0.0 0.0 0.0
2020 2088 0.0 0.0 0.0

For data sources see[6]

References