If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0615272202000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.294664,"lon":-117.974924,"icon":""}]} |
Location: 00/02-22-061-27W5/0 | |
Location Alias: 00/02-22-61-27 W5M | |
Location Alias 2: 00/02-22-061-27 W5/00 | |
Province: Alberta | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: CEQUENCE WANYAN 2-22-61-27 | |
Operator Name: Cequence Energy Ltd. | |
License Number: 0425860 | |
License Date: 2010-11-16 | |
License Status: Amended | |
Spud Date: 2010-11-28 | |
Final Drill Date: 2010-12-29 | |
Well Total Depth: 4470 m | |
Surface Hole Latitude: 54.294664 | |
Surface Hole Longitude: -117.974924 |
Start Date | Depth (m) | Reason |
---|---|---|
2010-12-11 | 2840 | Horizontal |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-01-26 | Multi-Stage Fracture | 4441.9 | 4442 | 0 |
2011-01-26 | Multi-Stage Fracture | 4376.8 | 4376.9 | 0 |
2011-01-26 | Multi-Stage Fracture | 4299.8 | 4300 | 0 |
2011-01-26 | Multi-Stage Fracture | 4211.7 | 4211.8 | 0 |
2011-01-26 | Multi-Stage Fracture | 4134.7 | 4134.8 | 0 |
2011-01-27 | Multi-Stage Fracture | 4034.1 | 4034.2 | 0 |
2011-01-27 | Multi-Stage Fracture | 3945.4 | 3945.5 | 0 |
2011-01-27 | Multi-Stage Fracture | 3866.4 | 3866.5 | 0 |
2011-01-27 | Multi-Stage Fracture | 3779.7 | 3779.8 | 0 |
2011-01-27 | Multi-Stage Fracture | 3679.2 | 3679.3 | 0 |
2011-01-27 | Multi-Stage Fracture | 3602.2 | 3602.3 | 0 |
2011-01-28 | Multi-Stage Fracture | 3513.4 | 3513.5 | 0 |
2011-01-28 | Multi-Stage Fracture | 3396.1 | 3396.2 | 0 |
2011-01-28 | Multi-Stage Fracture | 3295.5 | 3295.6 | 0 |
2011-01-28 | Multi-Stage Fracture | 3205.8 | 3205.9 | 0 |
2011-01-29 | Open Hole/Barefoot Completion | 4465.5 | 4466 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 7355 | 14045.7 | 0.0 | 1829.1 |
2012 | 7087 | 6173.7 | 0.0 | 723.2 |
2013 | 8584 | 4475.6 | 0.0 | 686.5 |
2014 | 8555 | 4019.4 | 0.0 | 475.0 |
2015 | 2424 | 1764.9 | 0.0 | 231.4 |
2016 | 8568 | 3805.9 | 0.0 | 329.4 |
2017 | 6072 | 1603.8 | 0.0 | 284.7 |
2018 | 8495 | 2027.3 | 0.0 | 133.6 |
2019 | 1824 | 434.4 | 0.0 | 54.3 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2010-12-03 | Lost Circulation | 1080.00 | 4470.00 |
For data sources see[6]