X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615272202000

Well Details

Well ID: 0615272202000
Loading map...
Location: 00/02-22-061-27W5/0
Location Alias: 00/02-22-61-27 W5M
Location Alias 2: 00/02-22-061-27 W5/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 27
Section: 22
County/Municipality: Municipal District of Greenview No. 16
Well Name: CEQUENCE WANYAN 2-22-61-27
Operator Name: Cequence Energy Ltd.
License Number: 0425860
License Date: 2010-11-16
License Status: Amended
Spud Date: 2010-11-28
Final Drill Date: 2010-12-29
Well Total Depth: 4470.00 m
Surface Hole Latitude: 54.294664
Surface Hole Longitude: -117.974924

For data sources see[1][2]

Well History

Date Event
2010-11-16 Obtained License
2010-12-01 Surface Casing Operation Performed
2010-12-03 Lost Circulation Occurred
2010-12-11 Direction Drilling Operation Performed - Horizontal
2010-12-18 Well Log Performed
2010-12-19 Well Log Performed
2010-12-20 Intermediate Casing Operation Performed
2010-12-29 Finished Drilling
2010-12-29 Well Log Performed
2010-12-29 Well Mode changed to Drilled and Cased
2010-12-31 Liner Casing Operation Performed
2011-01-02 Rig Released
2011-01-26 Perforation Treatment Performed - Multi-Stage Fracture
2011-01-27 Perforation Treatment Performed - Multi-Stage Fracture
2011-01-28 Perforation Treatment Performed - Multi-Stage Fracture
2011-01-29 Perforation Treatment Performed - Open-Hole Completion
2011-02-04 Well Began Production
2011-02-04 Well Fluid changed to Gas
2011-02-04 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-12-11 2840.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-01-26 Multi-Stage Fracture 4441.90 4442.00 0
2011-01-27 Multi-Stage Fracture 3679.20 3679.30 0
2011-01-27 Multi-Stage Fracture 3602.20 3602.30 0
2011-01-28 Multi-Stage Fracture 3513.40 3513.50 0
2011-01-28 Multi-Stage Fracture 3396.10 3396.20 0
2011-01-28 Multi-Stage Fracture 3295.50 3295.60 0
2011-01-28 Multi-Stage Fracture 3205.80 3205.90 0
2011-01-29 Open Hole/Barefoot Completion 4465.50 4466.00 0
2011-01-26 Multi-Stage Fracture 4376.80 4376.90 0
2011-01-26 Multi-Stage Fracture 4299.80 4300.00 0
2011-01-26 Multi-Stage Fracture 4211.70 4211.80 0
2011-01-26 Multi-Stage Fracture 4134.70 4134.80 0
2011-01-27 Multi-Stage Fracture 4034.10 4034.20 0
2011-01-27 Multi-Stage Fracture 3945.40 3945.50 0
2011-01-27 Multi-Stage Fracture 3866.40 3866.50 0
2011-01-27 Multi-Stage Fracture 3779.70 3779.80 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 7355 0.0 0.0 0.0
2012 7087 0.0 0.0 0.0
2013 8584 0.0 0.0 0.0
2014 8555 0.0 0.0 0.0
2015 2424 0.0 0.0 0.0
2016 8568 0.0 0.0 0.0
2017 6072 0.0 0.0 0.0
2018 8495 0.0 0.0 0.0
2019 8160 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-12-03 Lost Circulation 1080.00 4470.00

For data sources see[7]

References