X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0616021211002

Well Details

Well ID: 0616021211002
Loading map...
Location: 00/11-12-061-02W6/2
Location Alias: 00/11-12-61-02 W6M
Location Alias 2: 00/11-12-061-02 W6/02
Province: Alberta
County/Municipality: Municipal District of Greenview No. 16
Well Name: CEQUENCE 13-11 HZ RESTHA 11-12-61-2
Operator Name: Cequence Energy Ltd.
License Number: 0467457
License Date: 2014-06-18
License Status: Amended
Spud Date: 2014-06-24
Final Drill Date: 2014-08-10
Well Total Depth: 4950 m
Surface Hole Latitude: 54.2651
Surface Hole Longitude: -118.199584

For data sources see[1][2]

Directional Drilling

Start Date Depth (m) Reason
2014-07-02 2185
2014-07-06 2879 Horizontal
2014-07-25 2972 Horizontal

For data sources see[3]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-08-19 Open Hole/Barefoot Completion 4937.9 4950 0
2014-08-20 Multi-Stage Fracture 4917.7 4917.8 0
2014-08-20 Multi-Stage Fracture 4768.6 4768.7 0
2014-08-20 Multi-Stage Fracture 4699 4699.1 0
2014-08-20 Multi-Stage Fracture 4615.5 4615.6 0
2014-08-20 Multi-Stage Fracture 4531.8 4531.9 0
2014-08-20 Multi-Stage Fracture 4461.7 4461.8 0
2014-08-20 Multi-Stage Fracture 4378.8 4378.9 0
2014-08-20 Multi-Stage Fracture 4294.8 4294.9 0
2014-08-20 Multi-Stage Fracture 4224.8 4224.9 0
2014-08-20 Multi-Stage Fracture 4139.4 4139.5 0
2014-08-20 Multi-Stage Fracture 4055.9 4056 0
2014-08-20 Multi-Stage Fracture 3988.4 3988.5 0
2014-08-20 Multi-Stage Fracture 3903.9 3904 0
2014-08-20 Multi-Stage Fracture 3822.3 3822.4 0
2014-08-21 Multi-Stage Fracture 3752.5 3752.6 0
2014-08-21 Multi-Stage Fracture 3669.3 3669.4 0
2014-08-21 Multi-Stage Fracture 3585.6 3585.7 0
2014-08-21 Multi-Stage Fracture 3517.9 3518 0
2014-08-21 Multi-Stage Fracture 3434.3 3434.4 0
2014-08-21 Multi-Stage Fracture 3349.1 3349.2 0
2014-08-21 Multi-Stage Fracture 3265.3 3265.4 0
2014-08-21 Multi-Stage Fracture 3182.3 3182.4 0
2014-08-21 Multi-Stage Fracture 3097.3 3097.4 0
2014-08-21 Multi-Stage Fracture 3014.9 3015 0

For data sources see[4]

Fracking Activities

Start Date End Date Chemical Name CAS Number Purpose Job Percentage Supplier
08/20/2014 08/21/2014 non-hazardous ingredients Trade Secret Clay Control 0.0771 Calfrac
Crystalline Silica (Quartz) 14808-60-7 0.4663 Calfrac
Crystalline silica (Quartz) 14808-60-7 13.9469 Calfrac
Crystalline silica (Quartz) 14808-60-7 0.4663 Calfrac
Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) 55566-30-8 Bactericide/Biocide 0.0125 Calfrac
Water 7732-18-5 Bactericide/Biocide 0.013 Calfrac
Non-Hazardous Ingredients Trade Secret Clay Control 0.0771 Calfrac
Citrus terpenes 94266-47-4 Demulsifier 0.0816 Calfrac
Isopropanol 67-63-0 Demulsifier 0.0824 Calfrac
Non-Hazardous Ingredients Trade Secret Demulsifier 0.0816 Calfrac
Triethylene glycol 112-27-6 Demulsifier 0.0824 Calfrac
Water 7732-18-5 Demulsifier 0.0819 Calfrac
Nitrogen 7727-37-9 Energizing Fluid 2.4616 Calfrac
Non-Hazardous Ingredients Trade Secret Friction Reducer 0.0925 Calfrac

For data sources see[5]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
7/4/2014 0 7/16/2014 0:00 Oilfield Produced Water 1007
7/14/2014 7/14/2014 0:00 Recycled Fracturing Water (treated at well site) 60

For data sources see[6]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 2982 22982.2 0.0 0.0
2015 7991 30553.5 0.0 0.0
2016 8184 18140.4 0.0 0.0
2017 8759 12778.0 0.0 143.2
2018 8711 10115.7 0.0 188.5
2019 1943 2010.1 0.0 25.4

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-08-10 No Incident N/A N/A
2014-08-29 No Incident N/A N/A

For data sources see[8]

References