If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0616021211002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.2651,"lon":-118.199584,"icon":""}]} |
Location: 00/11-12-061-02W6/2 | |
Location Alias: 00/11-12-61-02 W6M | |
Location Alias 2: 00/11-12-061-02 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 061 | |
Meridian: 6 | |
Range: 02 | |
Section: 12 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: CEQUENCE 13-11 HZ RESTHA 11-12-61-2 | |
Operator Name: Cequence Energy Ltd. | |
License Number: 0467457 | |
License Date: 2014-06-18 | |
License Status: Amended | |
Spud Date: 2014-06-24 | |
Final Drill Date: 2014-08-10 | |
Well Total Depth: 4950.00 m | |
Surface Hole Latitude: 54.265100 | |
Surface Hole Longitude: -118.199584 |
Date | Event |
---|---|
2014-06-18 | Obtained License |
2014-06-27 | Surface Casing Operation Performed |
2014-07-02 | Direction Drilling Operation Performed - Deviate |
2014-07-06 | Direction Drilling Operation Performed - Horizontal |
2014-07-10 | Intermediate Casing Operation Performed |
2014-07-25 | Direction Drilling Operation Performed - Horizontal |
2014-08-06 | Well Log Performed |
2014-08-10 | Finished Drilling |
2014-08-10 | Liner Casing Operation Performed |
2014-08-10 | Rig Released |
2014-08-10 | Well Mode changed to Drilled and Cased |
2014-08-19 | Perforation Treatment Performed - Open-Hole Completion |
2014-08-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-08-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-08-22 | Well Began Production |
2014-08-22 | Well Fluid changed to Gas |
2014-08-22 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2014-07-02 | 2184.70 | Deviate (5 - 79 degrees) |
2014-07-06 | 2879.10 | Horizontal |
2014-07-25 | 2972.50 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-08-19 | Open Hole/Barefoot Completion | 4937.90 | 4950.00 | 0 |
2014-08-20 | Multi-Stage Fracture | 4224.80 | 4224.90 | 0 |
2014-08-20 | Multi-Stage Fracture | 4139.40 | 4139.50 | 0 |
2014-08-20 | Multi-Stage Fracture | 4055.90 | 4056.00 | 0 |
2014-08-20 | Multi-Stage Fracture | 3988.40 | 3988.50 | 0 |
2014-08-20 | Multi-Stage Fracture | 3903.90 | 3904.00 | 0 |
2014-08-20 | Multi-Stage Fracture | 3822.30 | 3822.40 | 0 |
2014-08-21 | Multi-Stage Fracture | 3752.50 | 3752.60 | 0 |
2014-08-21 | Multi-Stage Fracture | 3669.30 | 3669.40 | 0 |
2014-08-21 | Multi-Stage Fracture | 3585.60 | 3585.70 | 0 |
2014-08-21 | Multi-Stage Fracture | 3517.90 | 3518.00 | 0 |
2014-08-20 | Multi-Stage Fracture | 4917.70 | 4917.80 | 0 |
2014-08-21 | Multi-Stage Fracture | 3434.30 | 3434.40 | 0 |
2014-08-21 | Multi-Stage Fracture | 3349.10 | 3349.20 | 0 |
2014-08-21 | Multi-Stage Fracture | 3265.30 | 3265.40 | 0 |
2014-08-21 | Multi-Stage Fracture | 3182.30 | 3182.40 | 0 |
2014-08-21 | Multi-Stage Fracture | 3097.30 | 3097.40 | 0 |
2014-08-21 | Multi-Stage Fracture | 3014.90 | 3015.00 | 0 |
2014-08-20 | Multi-Stage Fracture | 4768.60 | 4768.70 | 0 |
2014-08-20 | Multi-Stage Fracture | 4699.00 | 4699.10 | 0 |
2014-08-20 | Multi-Stage Fracture | 4615.50 | 4615.60 | 0 |
2014-08-20 | Multi-Stage Fracture | 4531.80 | 4531.90 | 0 |
2014-08-20 | Multi-Stage Fracture | 4461.70 | 4461.80 | 0 |
2014-08-20 | Multi-Stage Fracture | 4378.80 | 4378.90 | 0 |
2014-08-20 | Multi-Stage Fracture | 4294.80 | 4294.90 | 0 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-08-20 | 2014-08-21 | 2,599 | 4,394 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 80.9491 | N/A | |||
30/50 Prime Plus | Calfrac | Quartz | 14808-60-7 | 100 | 2.3315 | N/A | ||
30/50 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 13.9469 | N/A | ||
50/140 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 0.4663 | N/A | ||
DWP-962 | Calfrac | Bactericide/Biocide | Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) | 55566-30-8 | 100 | 0.0125 | N/A | |
Water | 7732-18-5 | 100 | 0.013 | N/A | ||||
DWP-913 | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0771 | N/A | |
DWP-937 | Calfrac | Demulsifier | Citrus terpenes | 94266-47-4 | 100 | 0.0816 | N/A | |
Isopropanol | 67-63-0 | 100 | 0.0824 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.0816 | N/A | ||||
Triethylene glycol | 112-27-6 | 100 | 0.0824 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0819 | N/A | ||||
Nitrogen | Calfrac | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 2.4616 | N/A | |
DWP-621 | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0925 | N/A |
For data sources see[6]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2014-07-04 | 2014-07-16 | Oilfield Produced Water | 1007 |
2014-07-16 | 2014-07-16 | Oilfield Produced Water | 24 |
2014-07-14 | 2014-07-14 | Recycled Fracturing Water (treated at well site) | 60 |
2014-07-13 | 2014-07-13 | Recycled Fracturing Water (treated at well site) | 20 |
2014-07-13 | 2014-07-13 | Recycled Fracturing Water (treated at well site) | 40 |
2014-07-11 | 2014-07-15 | Recycled Fracturing Water (treated at well site) | 367 |
2014-07-09 | 2014-08-16 | Recycled Fracturing Water (treated at well site) | 3510 |
For data sources see[7]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2014 | 2982 | 0.0 | 0.0 | 0.0 |
2015 | 7991 | 0.0 | 0.0 | 0.0 |
2016 | 8184 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8711 | 0.0 | 0.0 | 0.0 |
2019 | 8423 | 0.0 | 0.0 | 0.0 |
2020 | 2111 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-08-10 | No Incident Encountered | 0.00 | 0.00 |
2014-08-29 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]