If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-121-45793 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.379569,"lon":-79.764356,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Venango | |
| Municipality: Cranberry Township | |
| Operator Name: CATALYST ENERGY INC | |
| Well Pad ID: | |
| Farm/Lease Name: DEEP HOLLOW 3421 | |
| License Status: Active | |
| Spud Date: 02/09/2015 | |
| Permit Date: 11/3/2014 | |
| Unconventional Well: N | |
| Configuration: Vertical Well | |
| Latitude: 41.379569 | |
| Longitude: -79.764356 |
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2015 | 0.00 | 0.00 | 0.00 | ||||
| 2016 | CATALYST ENERGY INC | 0.00 | 1,419.57 | 213 | 0.00 | ||
| 2017 | CATALYST ENERGY INC | 0.00 | 471.68 | 365 | 0.00 | ||
| 2018 | CATALYST ENERGY INC | 0.00 | 286.05 | 365 | 0.00 |
For data sources see[4]
| Period | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|
| 2016-0 | Produced Fluid (in Barrels) RWC 802 | 2,163.85 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2016-0 | Produced Fluid (in Barrels) RWC 802 | 7.69 Bbl | ROAD SPREADING | |
| 2016-0 | Produced Fluid (in Barrels) RWC 802 | 8.46 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
| 2017-0 | Produced Fluid (in Barrels) RWC 802 | 3,451.83 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2017-0 | Produced Fluid (in Barrels) RWC 802 | 64.62 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
| 2017-0 | Produced Fluid (in Barrels) RWC 802 | 80.77 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA | |
| 2017-0 | Produced Fluid (in Barrels) RWC 802 | 11.54 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
| 2017-0 | Produced Fluid (in Barrels) RWC 802 | 42.31 Bbl | ROAD SPREADING | |
| 2018-0 | Produced Fluid (in Barrels) RWC 802 | 2,118.35 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2018-0 | Produced Fluid (in Barrels) RWC 802 | 46.92 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
| 2018-0 | Produced Fluid (in Barrels) RWC 802 | 21.08 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
| 2018-0 | Produced Fluid (in Barrels) RWC 802 | 157.69 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
| 2018-0 | Produced Fluid (in Barrels) RWC 802 | 8.46 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
For data sources see[5]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 2343022 | Primary Facility | 02/11/2015 | Administrative/File Review | No Violations Noted | |
| 2348664 | Primary Facility | 03/04/2015 | Administrative/File Review | No Violations Noted | |
| 2414759 | Primary Facility | 10/07/2015 | Routine/Complete Inspection | No Violations Noted | |
| 2416326 | Primary Facility | 10/13/2015 | Routine/Complete Inspection | No Violations Noted | |
| 2422181 | Primary Facility | 10/28/2015 | Site Restoration | No Violations Noted | |
| 2506768 | Primary Facility | 2016-08-02 | Drilling/Alteration | No Violations Noted | |
| 2509767 | Primary Facility | 2016-08-09 | Routine/Complete Inspection | No Violations Noted | |
| 2510792 | Primary Facility | 2016-08-16 | Administrative/File Review | No Violations Noted | |
| 2658152 | Primary Facility | 2017-11-07 | Site Restoration | No Violations Noted | Onsite for a restoration inspection. The well is producing, labeled, and the annulus is vented. The site has greater than 70% vegetative coverage and is stable. There are no E&S issues. The site is considered restored. |
| 2767554 | Primary Facility | 2018-08-24 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. There is a tank battery located at the well site that appears in good shape housing three 210 bbl. steel tanks and a 100 bbl. fiber glass tank. There is also a lower tank battery that houses a 50 bbl. poly tank and a 50 bbl. steel tank. The site is stable with no E&S issues. |
For data sources see[6]