If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-003-22308 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.617786,"lon":-79.803469,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Allegheny | |
Municipality: Frazer Township | |
Operator Name: RANGE RESOURCES APPALACHIA LLC | |
Well Pad ID: | |
Farm/Lease Name: GULICK UNIT 4H | |
License Status: | |
Spud Date: | |
Permit Date: 9/15/2014 | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Latitude: 40.617786 | |
Longitude: -79.803469 |
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2379667 | Primary Facility | 06/02/2015 | Routine/Complete Inspection | No Violations Noted | On 6/02/15, I inspected the Gulick Unit and made the following observations: |
2379807 | Primary Facility | 06/05/2015 | Follow-up Inspection | No Violations Noted | On 6/5/15, I inspected the Gulick site as a follow up to the 6/2/15 inspection of the site and made the following observations: |
2379990 | Primary Facility | 06/09/2015 | Follow-up Inspection | No Violations Noted | On 6/9/15, I inspected the Gulick site as a follow up to previous inspections of the site on 6/2/15 & 6/5/15 and made the following observations: |
2380926 | Primary Facility | 06/16/2015 | Incident- Response to Accident or Event | No Violations Noted | On 6/16/15, I inspected the Gulick site in response to an operator reported incident and made the following observations: |
2381810 | Primary Facility | 06/19/2015 | Follow-up Inspection | No Violations Noted | On 6/19/15, I inspected the Gulick site as a follow up to a prior incident inspection and made the following observations: |
2390614 | Primary Facility | 07/17/2015 | Preoperation Inspection | No Violations Noted | On 7/16/15, I inspected the Gulick site for its preoperation inspection and made the following observations: |
2395019 | Primary Facility | 07/28/2015 | Follow-up Inspection | No Violations Noted | On 7/28/15, I inspected the Gulick site as a follow up to a previous inspection and made the following observations: |
2414934 | Primary Facility | 10/02/2015 | Routine/Complete Inspection | No Violations Noted | On 10/2/15, I performed a routine inspection for the Gulick site as a follow up to previous inspections and made the following observations: |
2484601 | Primary Facility | 2016-01-04 | Routine/Partial Inspection | No Violations Noted | On 1/4/16, I performed a routine partial inspection at the Gulick site and made the following observations:
•Landslides/slumps along the access road have not been remediated but have do not seem to have gotten worse. No violation. •A small drilling rig and associated equipment was on site at the time of inspection. |
2485989 | Primary Facility | 2016-01-22 | Incident- Response to Accident or Event | In Compliance with Policy | On 1/22/16, I performed an incident inspection at the Gulick site in response to a spill report received that morning and made the following observations:
•Per the operator a hose disconnected/was not connected properly while transferring reuse water between from a truck to a storage tank allowing roughly 50 gallons to spill out of containment and onto ice on the pad. Of the 50 gallons spilled roughly half was reported to have been immediately removed via vacuum truck before the ice was melted. The remaining amount was to be removed once the pad thawed (pad surface was hard frozen at the time of inspection). |
2486298 | Primary Facility | 2016-04-07 | Compliance Evaluation | No Violations Noted | On 4/7/16, I performed a compliance evaluation inspection at the Gulick site in response to a spill report received 1/22/16 and made the following observations:
•Visual inspection indicated that the spill was fully remediated; vegetation near location of spill was not visibly impacted. •The operator provided receipts from Weavertown Environmental detailing materials removed and disposed. •The containment and storage tanks where the spill occurred had been removed at the time of the inspection. |
2514395 | Primary Facility | 2016-04-19 | Routine/Partial Inspection | No Violations Noted | On 4/19/16, I performed a routine partial inspection at the Gulick site in response to an operator request for review of a minor modification and made the following observations:
•The operator reported that the landowner was requesting access to a vegetated slope below the well pad and needed a pipe and gravel crossing be added to an existing roadside culvert to allow access. This request was approved as a minor modification. •The vegetation cut slope north of the site entrance continues to be sparse with a number of small slumps present. No violation. •Two erosion channels along the access road have been repaired with rock linings. No violation. |
For data sources see[4]