X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-005-31257

Well Details

Well ID: 37-005-31257
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: South Buffalo Township
Operator Name: MDS ENERGY DEV LLC
Well Pad ID: 152316
Farm/Lease Name: BIBLICAL LIFE 4H
License Status: Active
Spud Date: 03/15/2016
Permit Date: 3/4/2016
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 40.743919
Longitude: -79.646539

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2016 MDS ENERGY DEV LLC 172,242.00 29 0.00 0 0.00 0
2017 MDS ENERGY DEV LLC 1,497,413.00 347 0.00 0 0.00 0
2018 MDS ENERGY DEV LLC 1,308,301.00 365 0.00 0 0.00 0
2019 MDS ENERGY DEV LLC 309,950.00 90 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
16DECU Fracturing Fluid Waste (in Barrels) RWC 805 200.27 Bbl INJECTION DISPOSAL WELL 34-007-24355
16DECU Fracturing Fluid Waste (in Barrels) RWC 805 977.15 Bbl INJECTION DISPOSAL WELL 34-099-23158
16DECU Fracturing Fluid Waste (in Barrels) RWC 805 255.07 Bbl INJECTION DISPOSAL WELL 34-155-23196
16DECU Fracturing Fluid Waste (in Barrels) RWC 805 519.39 Bbl INJECTION DISPOSAL WELL 34-155-24063
16DECU Produced Fluid (in Barrels) RWC 802 1,159.09 Bbl INJECTION DISPOSAL WELL 34-099-23158
16DECU Produced Fluid (in Barrels) RWC 802 79.23 Bbl INJECTION DISPOSAL WELL 34-133-24462
16DECU Produced Fluid (in Barrels) RWC 802 235.49 Bbl INJECTION DISPOSAL WELL 34-155-23196
16DECU Produced Fluid (in Barrels) RWC 802 384.04 Bbl INJECTION DISPOSAL WELL 34-155-24063
16DECU Produced Fluid (in Barrels) RWC 802 191.47 Bbl INJECTION DISPOSAL WELL 34-155-24079
16DECU Produced Fluid (in Barrels) RWC 802 169.46 Bbl REUSE OTHER THAN ROAD SPREADING
16NOVU Fracturing Fluid Waste (in Barrels) RWC 805 2,866.76 Bbl REUSE OTHER THAN ROAD SPREADING
2016-1 Drill Cuttings (in Tons) RWC 810 1,317.51 Tons LANDFILL 100585
2016-11 Fracturing Fluid Waste (in Barrels) RWC 805 2,866.76 Bbl REUSE OTHER THAN ROAD SPREADING
2016-12 Fracturing Fluid Waste (in Barrels) RWC 805 200.27 Bbl INJECTION DISPOSAL WELL 34-007-24355
2016-12 Fracturing Fluid Waste (in Barrels) RWC 805 977.15 Bbl INJECTION DISPOSAL WELL 34-099-23158
2016-12 Fracturing Fluid Waste (in Barrels) RWC 805 255.07 Bbl INJECTION DISPOSAL WELL 34-155-23196
2016-12 Fracturing Fluid Waste (in Barrels) RWC 805 519.39 Bbl INJECTION DISPOSAL WELL 34-155-24063
2016-12 Produced Fluid (in Barrels) RWC 802 1,159.09 Bbl INJECTION DISPOSAL WELL 34-099-23158
2016-12 Produced Fluid (in Barrels) RWC 802 79.23 Bbl INJECTION DISPOSAL WELL 34-133-24462
2016-12 Produced Fluid (in Barrels) RWC 802 235.49 Bbl INJECTION DISPOSAL WELL 34-155-23196
2016-12 Produced Fluid (in Barrels) RWC 802 384.04 Bbl INJECTION DISPOSAL WELL 34-155-24063
2016-12 Produced Fluid (in Barrels) RWC 802 191.47 Bbl INJECTION DISPOSAL WELL 34-155-24079
2016-12 Produced Fluid (in Barrels) RWC 802 169.46 Bbl REUSE OTHER THAN ROAD SPREADING
2016-2 Fracturing Fluid Waste (in Tons) RWC 805 38.35 Tons LANDFILL 100585
2016-2 Other Oil & Gas Wastes (in Tons) RWC 899 1.15 Tons LANDFILL 100585
2016-2 Synthetic Liner Materials (in Tons) RWC 806 1.55 Tons LANDFILL 100434
2017-01 Produced Fluid (in Barrels) RWC 802 781.72 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017-01 Produced Fluid (in Barrels) RWC 802 581.01 Bbl REUSE (AT WELL PAD)
2017-01 Synthetic Liner Materials (in Tons) RWC 806 1.72 Tons LANDFILL 100594
2017-02 Produced Fluid (in Barrels) RWC 802 24.21 Bbl INJECTION DISPOSAL WELL 34-099-23158
2017-02 Produced Fluid (in Barrels) RWC 802 90.23 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017-02 Produced Fluid (in Barrels) RWC 802 1,186.23 Bbl REUSE (AT WELL PAD)
2017-02 Synthetic Liner Materials (in Tons) RWC 806 3.31 Tons LANDFILL 100585
2017-02 Synthetic Liner Materials (in Tons) RWC 806 2.86 Tons LANDFILL 100594
2017-02 Waste Water Treatment Sludge (in Tons) RWC 804 3.21 Tons LANDFILL 100585
2017-02 Waste Water Treatment Sludge (in Tons) RWC 804 2.78 Tons LANDFILL 100594
2017-03 Produced Fluid (in Barrels) RWC 802 1,280.86 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017-03 Produced Fluid (in Barrels) RWC 802 217.88 Bbl REUSE (AT WELL PAD)
2017-03 Waste Water Treatment Sludge (in Tons) RWC 804 2.12 Tons LANDFILL 100594
2017-04 Produced Fluid (in Barrels) RWC 802 629.43 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017-04 Produced Fluid (in Barrels) RWC 802 581.01 Bbl REUSE (AT WELL PAD)
2017-05 Produced Fluid (in Barrels) RWC 802 1,432.72 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017-06 Produced Fluid (in Barrels) RWC 802 1,168.62 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017-07 Produced Fluid (in Barrels) RWC 802 929.18 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017-07 Produced Fluid (in Barrels) RWC 802 128.53 Bbl REUSE (AT WELL PAD)
2017-08 Produced Fluid (in Barrels) RWC 802 807.69 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017-08 Produced Fluid (in Barrels) RWC 802 529.29 Bbl REUSE (AT WELL PAD)
2017-09 Produced Fluid (in Barrels) RWC 802 103.44 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017-09 Produced Fluid (in Barrels) RWC 802 420.35 Bbl REUSE (AT WELL PAD)
2017-10 Produced Fluid (in Barrels) RWC 802 61.62 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017-10 Produced Fluid (in Barrels) RWC 802 48.42 Bbl REUSE (AT WELL PAD)
2017-11 Produced Fluid (in Barrels) RWC 802 32.10 Bbl INJECTION DISPOSAL WELL 34-099-23158
2017-11 Produced Fluid (in Barrels) RWC 802 216.10 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017-11 Produced Fluid (in Barrels) RWC 802 24.20 Bbl REUSE (AT WELL PAD)
2017-12 Produced Fluid (in Barrels) RWC 802 547.30 Bbl INJECTION DISPOSAL WELL 34-099-23158
2017-12 Produced Fluid (in Barrels) RWC 802 214.60 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017-12 Produced Fluid (in Barrels) RWC 802 268.50 Bbl REUSE (AT WELL PAD)
2018-01 Produced Fluid (in Barrels) RWC 802 1,249.40 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018-02 Produced Fluid (in Barrels) RWC 802 633.80 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018-03 Produced Fluid (in Barrels) RWC 802 864.90 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018-04 Produced Fluid (in Barrels) RWC 802 625.00 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018-04 Produced Fluid (in Barrels) RWC 802 33.00 Bbl INJECTION DISPOSAL WELL 34-155-24079
2018-05 Produced Fluid (in Barrels) RWC 802 658.00 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018-06 Produced Fluid (in Barrels) RWC 802 226.70 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018-07 Produced Fluid (in Barrels) RWC 802 258.60 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018-07 Produced Fluid (in Barrels) RWC 802 255.30 Bbl REUSE (AT WELL PAD)
2018-08 Produced Fluid (in Barrels) RWC 802 1,228.00 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018-09 Produced Fluid (in Barrels) RWC 802 819.80 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018-09 Produced Fluid (in Barrels) RWC 802 198.10 Bbl REUSE (AT WELL PAD)
2018-10 Produced Fluid (in Barrels) RWC 802 787.90 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018-10 Produced Fluid (in Barrels) RWC 802 33.00 Bbl INJECTION DISPOSAL WELL 34-155-24079
2018-11 Produced Fluid (in Barrels) RWC 802 916.90 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018-11 Produced Fluid (in Barrels) RWC 802 160.70 Bbl INJECTION DISPOSAL WELL 34-155-24079
2018-12 Produced Fluid (in Barrels) RWC 802 948.50 Bbl INJECTION DISPOSAL WELL 34-099-23158
2019-01 Produced Fluid (in Barrels) RWC 802 829.70 Bbl INJECTION DISPOSAL WELL 34-099-23158
2019-02 Produced Fluid (in Barrels) RWC 802 720.80 Bbl INJECTION DISPOSAL WELL 34-099-23158
2019-03 Produced Fluid (in Barrels) RWC 802 750.50 Bbl INJECTION DISPOSAL WELL 34-099-23158

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2463268 Primary Facility 2016-03-10 Preoperation Inspection No Violations Noted Site construction had been effectively completed as outlined in the E&S plan contained within the ESCGP. All E&S controls had been constructed and all disturbed earth had been temporarily stabilized. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2466910 Primary Facility 2016-03-21 Drilling/Alteration No Violations Noted Set 6'x6' cellar 3/15/16. Drilled 32" hole to 42' - set 42' of 26" conductor - grouted inside-out.
2467302 Primary Facility 2016-03-23 Routine/Complete Inspection No Violations Noted Drilling had commenced but was not ongoing at the time of the inspection. All site and acces sroad E&S controls outlined in the E&S plan within the ESCGP had been properly implemented. Al disturbed areas had been temporarily stabilized.
2480952 Primary Facility 2016-05-02 Drilling/Alteration No Violations Noted Rig drilling @ 2310' @ time of inspection. Ran/cemented 866' of 13 3/8 pipe-14 bbl return. Ran/cemented 2103' of 9 5/8" pipe-40 bbl return. Daily drilling log-equipment looked ok.
2486441 Primary Facility 2016-05-23 Routine/Complete Inspection No Violations Noted Drilling had commenced, but was not ongoing at the time of the inspection. Work was underway to set up the NOMAC drilling rig onsite. Also final touches were being made on the construction of the freshwater impundment and its security fencing along with the tank pad for the flowback tanks to be located onsite. There was no observed accelerated erosion or sedimentation in relation to the site or access road. All erosion controls had been implemented and maintained as outlined in the E&S plan contained within the ESCGP.
2492320 Primary Facility 2016-06-13 Drilling/Alteration No Violations Noted Nomac #78 finishing Rig was drilling in the curve of this well @ 7,665' at the time of this inspection. The BOP test chart - daily drilling information and on site equipment looked ok.
2494676 Primary Facility 2016-06-17 Drilling/Alteration No Violations Noted Nomac Rig # 78 had just tripped out of the hole and was rigging down @ the time of this inspection. Drilling site/equipment looked ok. Rig had just run 13,087' of production casing and cemented it back to surface with a 30 bbl return on cement.
2495386 Primary Facility 2016-06-23 Routine/Complete Inspection No Violations Noted Drilling appeared to have been completed, NOMAC drilling rig had been rigged down and moved off-site. OG-71 approved Aboveground Storare Tank (AST) had been constructed onsite in preparation for well stimulation activities. Freshwater impoundment construction had been completed, the impoundment had been lined, and was being filled with purchased water from a nearby hydrant. All disturbed areas had been temporarily stabilized with vegetation. E&S controls had been implemented and maintained as outlined in the E&S plan within the ESCGP and there was no observed accelerated erosion or sedimentation in relation to the site or access road.
2503686 Primary Facility 2016-07-19 Drilling/Alteration No Violations Noted Keane frac crew was pumping the 2nd stage of the planned 151 stage zipper frac on the 4H at the time of this inspection. All equipment and containments on site looked ok.
2503728 Primary Facility 2016-07-20 Drilling/Alteration No Violations Noted Keane frac crew zipper fracking 4th stage on this 4H well @ the time of this inspection. Conducted entire site inspection along with DEP Air Quality Specialist Cary Miller. All equipment and containment on site looked ok.
2552430 Primary Facility 2017-01-13 Routine/Complete Inspection No Violations Noted Drilling had been completed, wells were equipped for production. Brine tanks located onsite within secondary containment. Tanks and containment appeared to be in sound condition. Site had been constructed, E&S Controls had been maintained and the site had been stabilized with vegetation as outlined in the E&S plan contained within the ESCGP. Based upon the condition if the site and the completeness if the Restoration Extension Request submission the request will be granted extending the restoration deadline until March 15, 2019.
2569468 Primary Facility 2017-03-08 Routine/Complete Inspection No Violations Noted Well tagged-in production. Well head casing-production set equipment-tank battery-dike containment looked ok.
2589360 Primary Facility 2017-05-02 Routine/Complete Inspection No Violations Noted All site and access road erosion had been properly implemented and maintained as outlined in the ESCGP. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Site had been effectively stabilized with vegetative cover. Waste fluid storage tanks located onsite within secondary containment. Both the tanks and containment appeared to be in sound condition. Well development impoundment located onsite and it contained withdrawn fluids.
2589361 Primary Facility 2017-05-02 Routine/Complete Inspection No Violations Noted All site and access road erosion controls had been properly implemented and maintained as outlined in the ESCGP. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Site had been effectively stabilized with vegetative cover. Waste fluid storage tanks located onsite within secondary containment. Both the tanks and containment appeared to be in sound condition. Well development impoundment located onsite and it contained withdrawn fluids.
2595538 Primary Facility 2017-05-17 Routine/Complete Inspection No Violations Noted Well tagged-on. Well head casing-production set equipment-tank battery-dike containment look ok.
2689117 Primary Facility 2018-01-31 Routine/Partial Inspection No Violations Noted Multi-well pad. At time of inspection, well 4H drilled and appears equipped for production. Wells 1H, 2H, and 3H all drilled and appear equipped for production.
2766346 Primary Facility 2018-08-23 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment, containment dike and tank battery look ok.
2821588 Primary Facility 2019-01-03 Routine/Complete Inspection No Violations Noted This well is tagged and in production with the annulus open. The well head casing, piping, production set equipment, containment dike and tank battery look ok.

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 07/18/2016 08/03/2016 6694 10,400,900.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand (Proppant) Keane Proppant Silica Substrate 14808-60-7 100 9.67839 9,381,720.0
KFR-25 Keane Friction Reducer Water 7732-18-5 50 0.00390406 3784.39
distillates (petroleum), hydrotreated light 64742-47-8 18.5 0.0014445 1400.22
Oleic Acid Diethanolamide 93-83-4 1.5 0.000117122 113.532
Ammonium chloride 12125-02-9 2 0.000156163 151.376
Alcohols, C12-16, ethoxylated 68551-12-2 1.5 0.000117122 113.532
MBC-516 Keane Biocide Ethanol 64-17-5 2.8 0.000244655 237.156
Didecyl dimethyl ammonium chloride 7173-51-5 8.3 0.000725228 702.998
Glutaraldehyde 111-30-8 27 0.00235918 2286.86
N-alkyl dimethyl benzyl ammonium chloride 68424-85-1 5.5 0.000480573 465.842
FR-16FW Keane Friction Reducer Oleic Acid Diethanolamide 93-83-4 1.5 0.00102552 994.082
distillates (petroleum), hydrotreated light 64742-47-8 17.5 0.0119644 11597.6
Alcohols, C12-16, ethoxylated 68551-12-2 1 0.000683678 662.722
Water 7732-18-5 55 0.0376023 36449.7
Ammonium chloride 12125-02-9 1.5 0.00102552 994.082
KSI-16NW Keane Scale Inhibitor ammonia, anhydrous 7664-41-7 0.3 0.00002585 25.053
Alkyl phosphonic acid Proprietary 3 0.000258456 250.534
Hydrochloric Acid (15%) FSTI Acidizing Water 7732-18-5 85 0.583423 565539
Hydrochloric Acid 7647-01-0 15 0.102957 99801.1
AI-600P Weatherford Corrosion Inhibitor 1-Octanol 111-87-5 3 0.00005005 48.511
Pyridine, alkyl derives, quaternized with Benzyl chloride 68909-18-2 10 0.000166817 161.703
2-Butoxyethanol 111-76-2 3 0.00005005 48.511
Dimethylformamide 68-12-2 15 0.000250225 242.555
Triethyl Phosphate 78-40-0 1.8 0.00002919 28.298
1-Decanol 112-30-1 3 0.00005005 48.511
Ethylene Glycol 107-21-1 30 0.000500451 485.11
Methanol 67-56-1 1.8 0.00002919 28.298
Nonyl Phenol Ethoxylate, Branched 127087-87-0 10 0.000166817 161.703
Cinnamaldehyde 104-55-2 10 0.000166817 161.703
Alkyl Pyridine 68391-11-7 0.6 0.00000917 8.894
Water Snyder Brothers Carrier/Base Fluid Water 7732-18-5 100 89.54 86,795,300.0