If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-31257 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.743919,"lon":-79.646539,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: South Buffalo Township | |
Operator Name: MDS ENERGY DEV LLC | |
Well Pad ID: 152316 | |
Farm/Lease Name: BIBLICAL LIFE | |
License Status: Active | |
Spud Date: 2016-03-01 | |
Permit Date: 2016-03-04 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.743919 | |
Longitude: -79.646539 |
Date | Event |
---|---|
2016-03-04 | New Permit Application |
2016-03-15 | Performed Spud Operation |
2016-05-06 | Drilling Completion |
2016-06-15 | Drilling Completion |
2016-07-18 | Performed Stage 1 of Stimulation |
2016-07-19 | Perforation |
2016-07-19 | Performed Stage 2 of Stimulation |
2016-07-19 | Performed Stage 3 of Stimulation |
2016-07-20 | Perforation |
2016-07-20 | Performed Stage 4 of Stimulation |
2016-07-21 | Perforation |
2016-07-21 | Performed Stage 5 of Stimulation |
2016-07-21 | Performed Stage 6 of Stimulation |
2016-07-22 | Perforation |
2016-07-22 | Performed Stage 7 of Stimulation |
2016-07-23 | Performed Stage 8 of Stimulation |
2016-07-23 | Performed Stage 9 of Stimulation |
2016-07-24 | Perforation |
2016-07-24 | Performed Stage 10 of Stimulation |
2016-07-25 | Perforation |
2016-07-25 | Performed Stage 11 of Stimulation |
2016-07-25 | Performed Stage 12 of Stimulation |
2016-07-26 | Perforation |
2016-07-26 | Performed Stage 13 of Stimulation |
2016-07-26 | Performed Stage 14 of Stimulation |
2016-07-27 | Perforation |
2016-07-27 | Performed Stage 15 of Stimulation |
2016-07-27 | Performed Stage 16 of Stimulation |
2016-07-28 | Perforation |
2016-07-28 | Performed Stage 17 of Stimulation |
2016-07-28 | Performed Stage 18 of Stimulation |
2016-07-29 | Perforation |
2016-07-29 | Performed Stage 19 of Stimulation |
2016-07-29 | Performed Stage 20 of Stimulation |
2016-07-29 | Performed Stage 21 of Stimulation |
2016-07-30 | Perforation |
2016-07-30 | Performed Stage 22 of Stimulation |
2016-07-30 | Performed Stage 23 of Stimulation |
2016-07-31 | Perforation |
2016-07-31 | Performed Stage 24 of Stimulation |
2016-07-31 | Performed Stage 25 of Stimulation |
2016-07-31 | Performed Stage 26 of Stimulation |
2016-08-01 | Perforation |
2016-08-01 | Performed Stage 27 of Stimulation |
2016-08-01 | Performed Stage 28 of Stimulation |
2016-08-02 | Perforation |
2016-08-02 | Performed Stage 29 of Stimulation |
2016-08-02 | Performed Stage 30 of Stimulation |
2016-08-02 | Performed Stage 31 of Stimulation |
2016-08-03 | Perforation |
2016-08-03 | Performed Stage 32 of Stimulation |
2016-08-03 | Performed Stage 33 of Stimulation |
2016-08-04 | Perforation |
2019-06-06 | Deviated |
2019-06-06 | Newly Drilled |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2016-07-18 | 2016-08-03 | 6,694 | 10,400,900 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Sand (Proppant) | Keane | Proppant | Silica Substrate | 14808-60-7 | 100 | 9.67839 | 9,381,720.0 |
KFR-25 | Keane | Friction Reducer | Water | 7732-18-5 | 50 | 0.00390406 | 3784.39 | |
distillates (petroleum), hydrotreated light | 64742-47-8 | 18.5 | 0.0014445 | 1400.22 | ||||
Oleic Acid Diethanolamide | 93-83-4 | 1.5 | 0.000117122 | 113.532 | ||||
Ammonium chloride | 12125-02-9 | 2 | 0.000156163 | 151.376 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 1.5 | 0.000117122 | 113.532 | ||||
MBC-516 | Keane | Biocide | Ethanol | 64-17-5 | 2.8 | 0.000244655 | 237.156 | |
Didecyl dimethyl ammonium chloride | 7173-51-5 | 8.3 | 0.000725228 | 702.998 | ||||
Glutaraldehyde | 111-30-8 | 27 | 0.00235918 | 2286.86 | ||||
N-alkyl dimethyl benzyl ammonium chloride | 68424-85-1 | 5.5 | 0.000480573 | 465.842 | ||||
FR-16FW | Keane | Friction Reducer | Oleic Acid Diethanolamide | 93-83-4 | 1.5 | 0.00102552 | 994.082 | |
distillates (petroleum), hydrotreated light | 64742-47-8 | 17.5 | 0.0119644 | 11597.6 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 1 | 0.000683678 | 662.722 | ||||
Water | 7732-18-5 | 55 | 0.0376023 | 36449.7 | ||||
Ammonium chloride | 12125-02-9 | 1.5 | 0.00102552 | 994.082 | ||||
KSI-16NW | Keane | Scale Inhibitor | ammonia, anhydrous | 7664-41-7 | 0.3 | 0.00002585 | 25.053 | |
Alkyl phosphonic acid | Proprietary | 3 | 0.000258456 | 250.534 | ||||
Hydrochloric Acid (15%) | FSTI | Acidizing | Water | 7732-18-5 | 85 | 0.583423 | 565539 | |
Hydrochloric Acid | 7647-01-0 | 15 | 0.102957 | 99801.1 | ||||
AI-600P | Weatherford | Corrosion Inhibitor | 1-Octanol | 111-87-5 | 3 | 0.00005005 | 48.511 | |
Pyridine, alkyl derives, quaternized with Benzyl chloride | 68909-18-2 | 10 | 0.000166817 | 161.703 | ||||
2-Butoxyethanol | 111-76-2 | 3 | 0.00005005 | 48.511 | ||||
Dimethylformamide | 68-12-2 | 15 | 0.000250225 | 242.555 | ||||
Triethyl Phosphate | 78-40-0 | 1.8 | 0.00002919 | 28.298 | ||||
1-Decanol | 112-30-1 | 3 | 0.00005005 | 48.511 | ||||
Ethylene Glycol | 107-21-1 | 30 | 0.000500451 | 485.11 | ||||
Methanol | 67-56-1 | 1.8 | 0.00002919 | 28.298 | ||||
Nonyl Phenol Ethoxylate, Branched | 127087-87-0 | 10 | 0.000166817 | 161.703 | ||||
Cinnamaldehyde | 104-55-2 | 10 | 0.000166817 | 161.703 | ||||
Alkyl Pyridine | 68391-11-7 | 0.6 | 0.00000917 | 8.894 | ||||
Water | Snyder Brothers | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 89.54 | 86,795,300.0 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2016-07-18 | 1 | 4,437,920 | 8,048 | 8,711 | |
2016-07-19 | 2 | Silica Sand | 4,437,920 | 8,289 | 8,713 |
2016-07-19 | 3 | Silica Sand | 4,437,920 | 7,832 | 8,308 |
2016-07-20 | 4 | Silica Sand | 4,437,920 | 7,815 | 8,308 |
2016-07-21 | 5 | Silica Sand | 4,437,920 | 7,957 | 8,961 |
2016-07-21 | 6 | Silica Sand | 4,437,920 | 8,057 | 8,671 |
2016-07-22 | 7 | Silica Sand | 4,437,920 | 7,977 | 9,275 |
2016-07-23 | 8 | Silica Sand | 4,437,920 | 8,361 | 8,698 |
2016-07-23 | 9 | Silica Sand | 4,437,920 | 7,837 | 9,330 |
2016-07-24 | 10 | Silica Sand | 4,437,920 | 7,972 | 8,762 |
2016-07-25 | 11 | Silica Sand | 4,437,920 | 8,199 | 9,275 |
2016-07-25 | 12 | Silica Sand | 4,437,920 | 7,757 | 8,109 |
2016-07-26 | 13 | Silica Sand | 4,437,920 | 7,543 | 9,496 |
2016-07-26 | 14 | Silica Sand | 4,437,920 | 7,858 | 8,146 |
2016-07-27 | 15 | Silica Sand | 4,437,920 | 7,482 | 9,313 |
2016-07-27 | 16 | Silica Sand | 4,437,920 | 7,774 | 9,377 |
2016-07-28 | 17 | Silica Sand | 4,437,920 | 7,982 | 9,243 |
2016-07-28 | 18 | Silica Sand | 4,437,920 | 7,752 | 9,128 |
2016-07-29 | 19 | Silica Sand | 4,437,920 | 7,650 | 8,352 |
2016-07-29 | 20 | Silica Sand | 4,437,920 | 7,501 | 9,215 |
2016-07-29 | 21 | Silica Sand | 4,437,920 | 7,621 | 8,618 |
2016-07-30 | 22 | Silica Sand | 4,437,920 | 7,608 | 8,927 |
2016-07-30 | 23 | Silica Sand | 4,437,920 | 7,966 | 9,364 |
2016-07-31 | 24 | Silica Sand | 4,437,920 | 7,451 | 8,928 |
2016-07-31 | 25 | Silica Sand | 4,437,920 | 7,360 | 8,803 |
2016-07-31 | 26 | Silica Sand | 4,437,920 | 7,311 | 8,683 |
2016-08-01 | 27 | Silica Sand | 4,437,920 | 7,287 | 8,645 |
2016-08-01 | 28 | Silica Sand | 4,437,920 | 7,616 | 8,841 |
2016-08-02 | 29 | Silica Sand | 4,437,920 | 7,540 | 8,492 |
2016-08-02 | 30 | Silica Sand | 4,437,920 | 7,889 | 9,318 |
2016-08-02 | 31 | Silica Sand | 4,437,920 | 7,431 | 8,622 |
2016-08-03 | 32 | Silica Sand | 4,437,920 | 7,262 | 7,736 |
2016-08-03 | 33 | Silica Sand | 4,437,920 | 7,332 | 7,671 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2016 | MDS ENERGY DEV LLC | 172,242.00 | 29 | 0.00 | 0 | 0.00 | 0 |
2017 | MDS ENERGY DEV LLC | 1,497,413.00 | 347 | 0.00 | 0 | 0.00 | 0 |
2018 | MDS ENERGY DEV LLC | 1,308,301.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | MDS ENERGY DEV LLC | 1,110,796.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2016 | MDS ENERGY DEV LLC | Fracturing Fluid Waste | 519.39 Bbl | INJECTION DISPOSAL WELL | 34-155-24063 |
2016 | MDS ENERGY DEV LLC | 3,036.22 Bbl | REUSE OTHER THAN ROAD SPREADING | ||
2016 | MDS ENERGY DEV LLC | 519.39 Bbl | INJECTION DISPOSAL WELL | 34-155-24063 | |
2016 | MDS ENERGY DEV LLC | Fracturing Fluid Waste | 200.27 Bbl | INJECTION DISPOSAL WELL | 34-007-24355 |
2016 | MDS ENERGY DEV LLC | 79.23 Bbl | INJECTION DISPOSAL WELL | 34-133-24462 | |
2016 | MDS ENERGY DEV LLC | Produced Fluid | 191.47 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2016 | MDS ENERGY DEV LLC | 191.47 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 | |
2016 | MDS ENERGY DEV LLC | Produced Fluid | 235.49 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2016 | MDS ENERGY DEV LLC | Drill Cuttings | 1,317.51 Tons | LANDFILL | 100585 |
2016 | MDS ENERGY DEV LLC | Fracturing Fluid Waste | 2,866.76 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | MDS ENERGY DEV LLC | Synthetic Liner Materials | 1.55 Tons | LANDFILL | 100434 |
2016 | MDS ENERGY DEV LLC | Produced Fluid | 384.04 Bbl | INJECTION DISPOSAL WELL | 34-155-24063 |
2016 | MDS ENERGY DEV LLC | 1,159.09 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 | |
2016 | MDS ENERGY DEV LLC | Other Oil & Gas Wastes | 1.15 Tons | LANDFILL | 100585 |
2016 | MDS ENERGY DEV LLC | 200.27 Bbl | INJECTION DISPOSAL WELL | 34-007-24355 | |
2016 | MDS ENERGY DEV LLC | 255.07 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 | |
2016 | MDS ENERGY DEV LLC | Fracturing Fluid Waste | 977.15 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2016 | MDS ENERGY DEV LLC | Produced Fluid | 1,159.09 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2016 | MDS ENERGY DEV LLC | Fracturing Fluid Waste | 38.35 Tons | LANDFILL | 100585 |
2016 | MDS ENERGY DEV LLC | Produced Fluid | 79.23 Bbl | INJECTION DISPOSAL WELL | 34-133-24462 |
2016 | MDS ENERGY DEV LLC | Fracturing Fluid Waste | 255.07 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2016 | MDS ENERGY DEV LLC | Produced Fluid | 169.46 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | MDS ENERGY DEV LLC | 6,621.31 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 | |
2017 | MDS ENERGY DEV LLC | 3,587.08 Bbl | REUSE (AT WELL PAD) | ||
2017 | MDS ENERGY DEV LLC | Waste Water Treatment Sludge | 4.90 Tons | LANDFILL | 100594 |
2017 | MDS ENERGY DEV LLC | 1.72 Tons | LANDFILL | 100594 | |
2017 | MDS ENERGY DEV LLC | Synthetic Liner Materials | 4.58 Tons | LANDFILL | 100594 |
2017 | MDS ENERGY DEV LLC | Produced Fluid | 603.61 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2017 | MDS ENERGY DEV LLC | Waste Water Treatment Sludge | 3.21 Tons | LANDFILL | 100585 |
2017 | MDS ENERGY DEV LLC | 24.21 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 | |
2017 | MDS ENERGY DEV LLC | Produced Fluid | 7,716.21 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2017 | MDS ENERGY DEV LLC | Synthetic Liner Materials | 3.31 Tons | LANDFILL | 100585 |
2017 | MDS ENERGY DEV LLC | Produced Fluid | 3,985.42 Bbl | REUSE (AT WELL PAD) | |
2018 | MDS ENERGY DEV LLC | Produced Fluid | 9,217.50 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2018 | MDS ENERGY DEV LLC | Produced Fluid | 453.40 Bbl | REUSE (AT WELL PAD) | |
2018 | MDS ENERGY DEV LLC | Produced Fluid | 226.70 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2019 | MDS ENERGY DEV LLC | Produced Fluid | 223.40 Bbl | INJECTION DISPOSAL WELL | 34-099-23171 |
2019 | MDS ENERGY DEV LLC | Produced Fluid | 1,177.50 Bbl | REUSE (AT WELL PAD) | |
2019 | MDS ENERGY DEV LLC | Produced Fluid | 58.30 Bbl | INJECTION DISPOSAL WELL | 34-099-2-3171 |
2019 | MDS ENERGY DEV LLC | Produced Fluid | 5,885.10 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2463268 | Primary Facility | 2016-03-10 | Preoperation Inspection | No Violations Noted | Site construction had been effectively completed as outlined in the E&S plan contained within the ESCGP. All E&S controls had been constructed and all disturbed earth had been temporarily stabilized. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2466910 | Primary Facility | 2016-03-21 | Drilling/Alteration | No Violations Noted | Set 6'x6' cellar 3/15/16. Drilled 32" hole to 42' - set 42' of 26" conductor - grouted inside-out. |
2467302 | Primary Facility | 2016-03-23 | Routine/Complete Inspection | No Violations Noted | Drilling had commenced but was not ongoing at the time of the inspection. All site and acces sroad E&S controls outlined in the E&S plan within the ESCGP had been properly implemented. Al disturbed areas had been temporarily stabilized. |
2480952 | Primary Facility | 2016-05-02 | Drilling/Alteration | No Violations Noted | Rig drilling @ 2310' @ time of inspection. Ran/cemented 866' of 13 3/8 pipe-14 bbl return. Ran/cemented 2103' of 9 5/8" pipe-40 bbl return. Daily drilling log-equipment looked ok. |
2486441 | Primary Facility | 2016-05-23 | Routine/Complete Inspection | No Violations Noted | Drilling had commenced, but was not ongoing at the time of the inspection. Work was underway to set up the NOMAC drilling rig onsite. Also final touches were being made on the construction of the freshwater impundment and its security fencing along with the tank pad for the flowback tanks to be located onsite. There was no observed accelerated erosion or sedimentation in relation to the site or access road. All erosion controls had been implemented and maintained as outlined in the E&S plan contained within the ESCGP. |
2492320 | Primary Facility | 2016-06-13 | Drilling/Alteration | No Violations Noted | Nomac #78 finishing Rig was drilling in the curve of this well @ 7,665' at the time of this inspection. The BOP test chart - daily drilling information and on site equipment looked ok. |
2494676 | Primary Facility | 2016-06-17 | Drilling/Alteration | No Violations Noted | Nomac Rig # 78 had just tripped out of the hole and was rigging down @ the time of this inspection. Drilling site/equipment looked ok. Rig had just run 13,087' of production casing and cemented it back to surface with a 30 bbl return on cement. |
2495386 | Primary Facility | 2016-06-23 | Routine/Complete Inspection | No Violations Noted | Drilling appeared to have been completed, NOMAC drilling rig had been rigged down and moved off-site. OG-71 approved Aboveground Storare Tank (AST) had been constructed onsite in preparation for well stimulation activities. Freshwater impoundment construction had been completed, the impoundment had been lined, and was being filled with purchased water from a nearby hydrant. All disturbed areas had been temporarily stabilized with vegetation. E&S controls had been implemented and maintained as outlined in the E&S plan within the ESCGP and there was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2503686 | Primary Facility | 2016-07-19 | Drilling/Alteration | No Violations Noted | Keane frac crew was pumping the 2nd stage of the planned 151 stage zipper frac on the 4H at the time of this inspection. All equipment and containments on site looked ok. |
2503728 | Primary Facility | 2016-07-20 | Drilling/Alteration | No Violations Noted | Keane frac crew zipper fracking 4th stage on this 4H well @ the time of this inspection. Conducted entire site inspection along with DEP Air Quality Specialist Cary Miller. All equipment and containment on site looked ok. |
2552430 | Primary Facility | 2017-01-13 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed, wells were equipped for production. Brine tanks located onsite within secondary containment. Tanks and containment appeared to be in sound condition. Site had been constructed, E&S Controls had been maintained and the site had been stabilized with vegetation as outlined in the E&S plan contained within the ESCGP. Based upon the condition if the site and the completeness if the Restoration Extension Request submission the request will be granted extending the restoration deadline until March 15, 2019. |
2569468 | Primary Facility | 2017-03-08 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Well head casing-production set equipment-tank battery-dike containment looked ok. |
2589360 | Primary Facility | 2017-05-02 | Routine/Complete Inspection | No Violations Noted | All site and access road erosion had been properly implemented and maintained as outlined in the ESCGP. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Site had been effectively stabilized with vegetative cover. Waste fluid storage tanks located onsite within secondary containment. Both the tanks and containment appeared to be in sound condition. Well development impoundment located onsite and it contained withdrawn fluids. |
2589361 | Primary Facility | 2017-05-02 | Routine/Complete Inspection | No Violations Noted | All site and access road erosion controls had been properly implemented and maintained as outlined in the ESCGP. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Site had been effectively stabilized with vegetative cover. Waste fluid storage tanks located onsite within secondary containment. Both the tanks and containment appeared to be in sound condition. Well development impoundment located onsite and it contained withdrawn fluids. |
2595538 | Primary Facility | 2017-05-17 | Routine/Complete Inspection | No Violations Noted | Well tagged-on. Well head casing-production set equipment-tank battery-dike containment look ok. |
2689117 | Primary Facility | 2018-01-31 | Routine/Partial Inspection | No Violations Noted | Multi-well pad. At time of inspection, well 4H drilled and appears equipped for production. Wells 1H, 2H, and 3H all drilled and appear equipped for production. |
2766346 | Primary Facility | 2018-08-23 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment, containment dike and tank battery look ok. |
2821588 | Primary Facility | 2019-01-03 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production with the annulus open. The well head casing, piping, production set equipment, containment dike and tank battery look ok. |
For data sources see[9]