X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-153-22983

Well Details

Well ID: 34-153-22983
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Country: United States
State: Ohio
County: Summit
Municipality: Hudson
Operator Name: OHIO VALLEY ENERGY SYSTEM CORP
Well Pad ID:
Farm/Lease Name: SCHULTZ
License Status: Producing
License Date: 2007-01-14
Spud Date: 2006-07-17
Spud Drilling Contractor: WILDCAT DRILLING
Final Drill Date: 2006-07-20
Well Total Depth: 4117 ft
Configuration: Vertical
Latitude: 41.235216804
Longitude: -81.43508066

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2006-06-29 Proposed Formations:OHIO SHALE THRU CLINTON, Issued Date:6/29/2006, Expired Date:6/29/2007 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL
Original Spud 2006-07-17
Completed 2006-07-20
Reached Total Depth 2006-07-20
Completion Report Received 2006-11-09
Construction Permit Expires 2007-06-29
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2007-01-14 3860 3902 94

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 15 2690 Bbl 80000 1000 GALLONS IC ACID

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2007 OHIO VALLEY ENERGY SYSTEM CORP 10065 926 259
2008 OHIO VALLEY ENERGY SYSTEM CORP 7857 486 365
2009 OHIO VALLEY ENERGY SYSTEM CORP 5731 392 365
2010 OHIO VALLEY ENERGY SYSTEM CORP 5352 299 365
2011 OHIO VALLEY ENERGY SYSTEM CORP 5381 173 365
2012 OHIO VALLEY ENERGY SYSTEM CORP 4656 255 366
2013 OHIO VALLEY ENERGY SYSTEM CORP 3761 160 365
2014 OHIO VALLEY ENERGY SYSTEM CORP 3813 242 365
2015 OHIO VALLEY ENERGY SYSTEM CORP 3877 93 365
2016 OHIO VALLEY ENERGY SYSTEM CORP 1756 95 324
2017 OHIO VALLEY ENERGY SYSTEM CORP 1314 0 365
2018 OHIO VALLEY ENERGY SYSTEM CORP 3914 188 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2007 OHIO VALLEY ENERGY SYSTEM CORP Brine 754 259
2008 OHIO VALLEY ENERGY SYSTEM CORP Brine 300 365
2009 OHIO VALLEY ENERGY SYSTEM CORP Brine 324 365
2010 OHIO VALLEY ENERGY SYSTEM CORP Brine 149 365
2011 OHIO VALLEY ENERGY SYSTEM CORP Brine 84 365
2012 OHIO VALLEY ENERGY SYSTEM CORP Brine 72 366
2013 OHIO VALLEY ENERGY SYSTEM CORP Brine 144 365
2014 OHIO VALLEY ENERGY SYSTEM CORP Brine 45 365
2015 OHIO VALLEY ENERGY SYSTEM CORP Brine 227 365
2016 OHIO VALLEY ENERGY SYSTEM CORP Brine 0 324
2017 OHIO VALLEY ENERGY SYSTEM CORP Brine 0 365
2018 OHIO VALLEY ENERGY SYSTEM CORP Brine 164 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0306475010 2006-08-10 Drill / Deepen / Reopen No Violations Dons Excavating was on site to solidify the drilling pits. Chemtech delivered the dust.
0748621878 2006-08-14 Drill / Deepen / Reopen No Violations The drilling pits have been solidified and closed over. No violations at this time.
0838759094 2006-07-31 Drill / Deepen / Reopen No Violations The pits are full and Pander Trucking will transfer water to the next drilling location as soon as possible. The pits have been diked up and there does not appear to be any immediate threat of release.
1134584584 2006-08-03 Drill / Deepen / Reopen No Violations Pits are in good condition. No violations at this time.
1154034587 2006-07-24 Drill / Deepen / Reopen No Violations Wildcat has moved off the location. The pits are fenced off, lined and in good condition. No violations at this time.
1908962749 2018-04-26 UrbanProduction Wells No Violations Access was gained by walking to both the tank battery and wellhead. A short driveway off of Ravenna Road leads to the meter station and load lines. The tank battery was locked and fenced. I.D. signage was posted. The tank battery consisted of one (1) 140 barrel stock tank, one (1) 50 barrel poly brine tank and 2408 separator with meter. An earthen dike surrounded the tank battery. The stock tank had a pressure hatch, relief valve and lightning arrestor. No leaks were identified. The well was operated as a plunger lift well. There was a locked fence and I. D. signage posted. A 8.625 X 4.5 manifold allowed monitoring of the annular space. No leaks were found at the wellhead. No violations found during this inspection.
1941267873 2006-08-02 Drill / Deepen / Reopen No Violations The pits are being pumped down by Pander Trucking with the water being transferred to the Camp drilling location.
1998510249 2007-05-17 Preliminary Restoration No Violations Preliminary restoration is approved.
2120068165 2006-07-17 Drill / Deepen / Reopen No Violations Wildcat Drilling is moving on the location anc should spud later today. The pits are being dug in good clay. No violations at this time.

For data sources see[9]

References

BESbswy