If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-22983 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.23,"lon":-81.43,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: OHIO VALLEY ENERGY SYSTEMS COR | |
Well Pad ID: | |
Farm/Lease Name: SCHULTZ | |
License Status: Producing | |
License Date: 2006-06-29 | |
Spud Date: 2006-07-17 | |
Spud Drilling Contractor: WILDCAT DRILLING | |
Final Drill Date: 2006-07-20 | |
Well Total Depth: 4117.00 ft | |
Configuration: Vertical | |
Latitude: 41.230000 | |
Longitude: -81.430000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2006-06-29 | Proposed Formations:OHIO SHALE THRU CLINTON, Issued Date:6/29/2006, Expired Date:6/29/2007 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Original Spud | 2006-07-17 | |
Completed | 2006-07-20 | |
Reached Total Depth | 2006-07-20 | |
Completion Report Received | 2006-11-09 | |
Construction Permit Expires | 2007-06-29 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2007-01-14 | 3860 | 3902 | 94 |
3860 | 3902 | 94 | |
3860 | 3902 | 94 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 15 | 2690 Bbl | 80000 | 1000 GALLONS IC ACID |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2007 | OHIO VALLEY ENERGY SYSTEMS COR | 10065.00 | 926.00 | 259 |
2008 | OHIO VALLEY ENERGY SYSTEMS COR | 7857.00 | 486.00 | 365 |
2009 | OHIO VALLEY ENERGY SYSTEMS COR | 5731.00 | 392.00 | 365 |
2010 | OHIO VALLEY ENERGY SYSTEMS COR | 5352.00 | 299.00 | 365 |
2011 | OHIO VALLEY ENERGY SYSTEMS COR | 5381.00 | 173.00 | 365 |
2012 | OHIO VALLEY ENERGY SYSTEMS COR | 4656.00 | 255.00 | 366 |
2013 | OHIO VALLEY ENERGY SYSTEMS COR | 3761.00 | 160.00 | 365 |
2014 | OHIO VALLEY ENERGY SYSTEMS COR | 3813.00 | 242.00 | 365 |
2015 | OHIO VALLEY ENERGY SYSTEMS COR | 3877.00 | 93.00 | 365 |
2016 | OHIO VALLEY ENERGY SYSTEMS COR | 1756.00 | 95.00 | 324 |
2017 | OHIO VALLEY ENERGY SYSTEMS COR | 1314.00 | 0.00 | 365 |
2018 | OHIO VALLEY ENERGY SYSTEMS COR | 3914.00 | 188.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2007 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 754 | 259 |
2008 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 300 | 365 |
2009 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 324 | 365 |
2010 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 149 | 365 |
2011 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 84 | 365 |
2012 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 72 | 366 |
2013 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 144 | 365 |
2014 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 45 | 365 |
2015 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 227 | 365 |
2016 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 0 | 324 |
2017 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 0 | 365 |
2018 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 164 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1134584584 | 2006-8-3 0:00:0 | DD | No Violations | |
-1908962749 | 2018-4-26 0:00: | UP | No Violations | |
-2120068165 | 2006-7-17 0:00: | DD | No Violations | |
-306475010 | 2006-8-10 0:00: | DD | No Violations | |
0306475010 | 2006-08-10 | Drill / Deepen / Reopen | No Violations | Dons Excavating was on site to solidify the drilling pits. Chemtech delivered the dust. |
0748621878 | 2006-08-14 | Drill / Deepen / Reopen | No Violations | The drilling pits have been solidified and closed over. No violations at this time. |
0838759094 | 2006-07-31 | Drill / Deepen / Reopen | No Violations | The pits are full and Pander Trucking will transfer water to the next drilling location as soon as possible. The pits have been diked up and there does not appear to be any immediate threat of release. |
1134584584 | 2006-08-03 | Drill / Deepen / Reopen | No Violations | Pits are in good condition. No violations at this time. |
1154034587 | 2006-07-24 | Drill / Deepen / Reopen | No Violations | Wildcat has moved off the location. The pits are fenced off, lined and in good condition. No violations at this time. |
1908962749 | 2018-04-26 | UrbanProduction Wells | No Violations | Access was gained by walking to both the tank battery and wellhead. A short driveway off of Ravenna Road leads to the meter station and load lines. The tank battery was locked and fenced. I.D. signage was posted. The tank battery consisted of one (1) 140 barrel stock tank, one (1) 50 barrel poly brine tank and 2408 separator with meter. An earthen dike surrounded the tank battery. The stock tank had a pressure hatch, relief valve and lightning arrestor. No leaks were identified. The well was operated as a plunger lift well. There was a locked fence and I. D. signage posted. A 8.625 X 4.5 manifold allowed monitoring of the annular space. No leaks were found at the wellhead. No violations found during this inspection. |
1941267873 | 2006-08-02 | Drill / Deepen / Reopen | No Violations | The pits are being pumped down by Pander Trucking with the water being transferred to the Camp drilling location. |
1998510249 | 2007-05-17 | Preliminary Restoration | No Violations | Preliminary restoration is approved. |
2120068165 | 2006-07-17 | Drill / Deepen / Reopen | No Violations | Wildcat Drilling is moving on the location anc should spud later today. The pits are being dug in good clay. No violations at this time. |
748621878 | 2006-8-14 0:00: | DD | No Violations | |
838759094 | 2006-7-31 0:00: | DD | No Violations |
For data sources see[9]