X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-059-26963

Well Details

Well ID: 37-059-26963
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Gray Township
Operator Name: RICE DRILLING B LLC
Well Pad ID: 152172
Farm/Lease Name: GRECOE 8H
License Status: Active
Spud Date: 2015-10-17
Permit Date: 2015-10-16
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 39.920167
Longitude: -80.380094

For data sources see[1][2][3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-08-11 2016-09-23 7952 9,882,180.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 40/70 Mesh Sand Keane Proppant Crystalline Silica in the form of Quartz 14808-60-7 100 4.69898 4,327,080.0
Other Chemical(s) Listed Above See Trade Name(s) List Quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 10 0.00161076 1483.27
Ethylene Glycol 107-21-1 20 0.0580168 53425.1
Ammonium Chloride 12125-02-9 0.9 0.000578571 532.78
Citric Acid 77-92-9 30 0.000914289 841.927
Oleic Acid Diethanolamide 93-83-4 2 0.00128571 1183.95
Propargly Alcohol 107-19-7 1 0.00001550 14.27
Polyacrylamide 69418-26-4 30 0.0192857 17759.3
Distillates (Petroleum), Hydrotreated Light 64742-47-8 20 0.0128571 11839.6
Potassium Iodide 7681-11-0 5 0.00007748 71.35
Alcohols, C12-16, Ethoxylated 68551-12-2 2 0.00128571 1183.95
Water Vantage Carrier/ Base Fluid Water 7732-18-5 100 89.5546 82,466,800.0
Al-11 Keane Corrosion Inhibitor Propargyl Alcohol Derivative Proprietary 60 0.000929785 856.197
Propargly Alcohol 107-19-7 1 0.00001550 14.27
Potassium Iodide 7681-11-0 5 0.00007748 71.35
Bactron K-219 NALCO Biocide Quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 10 0.00161076 1483.27
Methanol 67-56-1 30 0.00483227 4449.82
100 Mesh Keane Proppant Crystalline Silica in the form of Quartz 14808-60-7 100 4.83416 4,451,560.0
EC6486A Scale Inhibitor NALCO Scale Inhibitor Ethylene Glycol 107-21-1 20 0.0580168 53425.1
Amine Triphosphate Proprietary 20 0.0580168 53425.1
7.5% HCL Keane Acid Hydrochloric Acid 7647-01-0 7.5 0.0402879 37099.3
TXP-34 Keane Friction Reducer Ammonium Chloride 12125-02-9 0.9 0.000578571 532.78
Oleic Acid Diethanolamide 93-83-4 2 0.00128571 1183.95
Water 7732-18-5 43 0.0276428 25455
Distillates (Petroleum), Hydrotreated Light 64742-47-8 20 0.0128571 11839.6
Polyacrylamide 69418-26-4 30 0.0192857 17759.3
Alcohols, C12-16, Ethoxylated 68551-12-2 2 0.00128571 1183.95
FEAC-20 Keane Iron Control Acetic Acid 64-19-7 45 0.00137143 1262.89
Citric Acid 77-92-9 30 0.000914289 841.927

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 VANTAGE ENERGY APPALACHIA II LLC 0.00 0 0.00 0 0.00 0
2016 VANTAGE ENERGY APPALACHIA II LLC 0.00 0 0.00 0 0.00 0
2017 VANTAGE ENERGY APPALACHIA II LLC 2,095,918.76 329 0.00 0 0.00 0
2018 RICE DRILLING B LLC 1,523,536.00 365 0.00 0 0.00 0
2019 RICE DRILLING B LLC 269,930.00 90 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2015-M10 Drill Cuttings (in Tons) 230.20 Tons LANDFILL PAD059087072
2015-M10 Drill Cuttings (in Tons) 101.05 Tons RESIDUAL WASTE TRANSFER FACILITY 301071
2015-M10 Drilling Fluid Waste (in Barrels) 60.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015-M11 Drill Cuttings (in Tons) 589.55 Tons LANDFILL PAD059087072
2015-M11 Drill Cuttings (in Tons) 160.22 Tons RESIDUAL WASTE TRANSFER FACILITY 301071
2015-M11 Drilling Fluid Waste (in Barrels) 665.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2015-M11 Drilling Fluid Waste (in Barrels) 1,023.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015-M12 Drilling Fluid Waste (in Barrels) 458.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016-M02 Drill Cuttings (in Tons) RWC 810 723.98 Tons LANDFILL PAD059087072
2016-M02 Drilling Fluid Waste (in Barrels) RWC 803 47.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2016-M02 Drilling Fluid Waste (in Barrels) RWC 803 116.50 Bbl REUSE OTHER THAN ROAD SPREADING
2016-M02 Other Oil & Gas Wastes (in Barrels) RWC 899 80.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016-M02 Synthetic Liner Materials (in Tons) RWC 806 6.97 Tons LANDFILL PAD059087072
2016-M03 Drill Cuttings (in Tons) RWC 810 10.53 Tons LANDFILL PAD059087072
2016-M03 Drilling Fluid Waste (in Barrels) RWC 803 131.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2016-M03 Drilling Fluid Waste (in Barrels) RWC 803 89.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016-M03 Other Oil & Gas Wastes (in Barrels) RWC 899 26.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2016-M03 Other Oil & Gas Wastes (in Barrels) RWC 899 66.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016-M04 Other Oil & Gas Wastes (in Barrels) RWC 899 17.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016-M04 Servicing Fluid (in Barrels) RWC 808 23.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016-M05 Servicing Fluid (in Tons) RWC 808 422.00 Tons REUSE OTHER THAN ROAD SPREADING
2016-M08 Other Oil & Gas Wastes (in Barrels) RWC 899 93.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016-M08 Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 18.04 Tons LANDFILL 100172
2016-M08 Synthetic Liner Materials (in Tons) RWC 806 1.14 Tons LANDFILL 100172
2016-M08 Synthetic Liner Materials (in Tons) RWC 806 1.19 Tons LANDFILL 100620
2016-M09 Fracturing Fluid Waste (in Barrels) RWC 805 147.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016-M09 Other Oil & Gas Wastes (in Barrels) RWC 899 59.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016-M09 Synthetic Liner Materials (in Tons) RWC 806 1.88 Tons LANDFILL 100172
2016-M10 Fracturing Fluid Waste (in Barrels) RWC 805 470.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016-M10 Fracturing Fluid Waste (in Tons) RWC 805 1.49 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2016-M10 Fracturing Fluid Waste (in Tons) RWC 805 25.01 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2016-M10 Other Oil & Gas Wastes (in Barrels) RWC 899 349.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2016-M10 Other Oil & Gas Wastes (in Barrels) RWC 899 52.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016-M10 Synthetic Liner Materials (in Tons) RWC 806 0.58 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2016-M11 Fracturing Fluid Waste (in Barrels) RWC 805 311.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2016-M11 Fracturing Fluid Waste (in Barrels) RWC 805 16.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016-M11 Fracturing Fluid Waste (in Tons) RWC 805 10.80 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2016-M11 Other Oil & Gas Wastes (in Barrels) RWC 899 3.60 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016-M11 Other Oil & Gas Wastes (in Barrels) RWC 899 50.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2016-M11 Other Oil & Gas Wastes (in Barrels) RWC 899 9.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016-M11 Other Oil & Gas Wastes (in Barrels) RWC 899 11.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016-M11 Produced Fluid (in Barrels) RWC 802 9.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016-M12 Drilling Fluid Waste (in Barrels) RWC 803 29.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016-M12 Other Oil & Gas Wastes (in Barrels) RWC 899 13.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016-M12 Other Oil & Gas Wastes (in Barrels) RWC 899 90.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016-M12 Synthetic Liner Materials (in Tons) RWC 806 10.81 Tons LANDFILL 100663
2016-M12 Waste Water Treatment Sludge (in Tons) RWC 804 1.10 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2017-M01 Other Oil & Gas Wastes (in Barrels) RWC 899 6.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-M01 Other Oil & Gas Wastes (in Barrels) RWC 899 38.50 Bbl REUSE (AT WELL PAD)
2017-M01 Produced Fluid (in Barrels) RWC 802 64.56 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-M01 Produced Fluid (in Barrels) RWC 802 611.13 Bbl REUSE (AT WELL PAD)
2017-M01 Synthetic Liner Materials (in Tons) RWC 806 0.99 Tons LANDFILL 100663
2017-M02 Other Oil & Gas Wastes (in Barrels) RWC 899 1.25 Bbl REUSE (AT WELL PAD)
2017-M02 Produced Fluid (in Barrels) RWC 802 13.75 Bbl REUSE (AT WELL PAD)
2017-M03 Other Oil & Gas Wastes (in Barrels) RWC 899 1.82 Bbl REUSE (AT WELL PAD)
2017-M03 Produced Fluid (in Barrels) RWC 802 39.10 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017-M03 Produced Fluid (in Barrels) RWC 802 19.84 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-M03 Produced Fluid (in Barrels) RWC 802 197.59 Bbl REUSE (AT WELL PAD)
2017-M04 Other Oil & Gas Wastes (in Barrels) RWC 899 4.09 Bbl REUSE (AT WELL PAD)
2017-M04 Produced Fluid (in Barrels) RWC 802 140.69 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-M04 Produced Fluid (in Barrels) RWC 802 30.00 Bbl REUSE (AT WELL PAD)
2017-M05 Other Oil & Gas Wastes (in Barrels) RWC 899 10.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017-M05 Other Oil & Gas Wastes (in Barrels) RWC 899 2.27 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-M05 Produced Fluid (in Barrels) RWC 802 305.91 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017-M05 Produced Fluid (in Barrels) RWC 802 395.92 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-M05 Produced Fluid (in Barrels) RWC 802 713.71 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017-M05 Produced Fluid (in Barrels) RWC 802 419.53 Bbl REUSE (AT WELL PAD)
2017-M06 Other Oil & Gas Wastes (in Barrels) RWC 899 10.00 Bbl REUSE (AT WELL PAD)
2017-M06 Produced Fluid (in Barrels) RWC 802 126.01 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-M06 Produced Fluid (in Barrels) RWC 802 29.47 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017-M06 Produced Fluid (in Barrels) RWC 802 1,615.60 Bbl REUSE (AT WELL PAD)
2017-M07 Other Oil & Gas Wastes (in Barrels) RWC 899 12.27 Bbl REUSE (AT WELL PAD)
2017-M07 Produced Fluid (in Barrels) RWC 802 19.19 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-M07 Produced Fluid (in Barrels) RWC 802 51.22 Bbl REUSE (AT WELL PAD)
2017-M08 Produced Fluid (in Tons) RWC 802 2.48 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2017-M08 Synthetic Liner Materials (in Tons) RWC 806 0.77 Tons LANDFILL 100663
2017-M09 Produced Fluid (in Tons) RWC 802 0.18 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2017-M10 Produced Fluid (in Barrels) RWC 802 407.82 Bbl REUSE (AT WELL PAD)
2017-M11 Produced Fluid (in Barrels) RWC 802 50.49 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-M11 Produced Fluid (in Barrels) RWC 802 53.74 Bbl REUSE (AT WELL PAD)
2017-M12 Produced Fluid (in Barrels) RWC 802 19.93 Bbl REUSE (AT WELL PAD)
2018-M01 Produced Fluid (in Barrels) RWC 802 14.19 Bbl INJECTION DISPOSAL WELL 34-157-25511
2018-M01 Produced Fluid (in Barrels) RWC 802 85.11 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-M01 Produced Fluid (in Barrels) RWC 802 14.31 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018-M01 Produced Fluid (in Barrels) RWC 802 25.79 Bbl REUSE (AT WELL PAD)
2018-M01 Produced Fluid (in Barrels) RWC 802 11.61 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018-M02 Produced Fluid (in Barrels) RWC 802 25.41 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-M02 Produced Fluid (in Barrels) RWC 802 12.71 Bbl REUSE (AT WELL PAD)
2018-M03 Other Oil & Gas Wastes (in Barrels) RWC 899 12.22 Bbl REUSE (AT WELL PAD)
2018-M03 Produced Fluid (in Barrels) RWC 802 68.42 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-M03 Produced Fluid (in Barrels) RWC 802 17.11 Bbl REUSE (AT WELL PAD)
2018-M03 Produced Fluid (in Barrels) RWC 802 17.11 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018-M04 Other Oil & Gas Wastes (in Barrels) RWC 899 27.78 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-M04 Other Oil & Gas Wastes (in Barrels) RWC 899 12.22 Bbl REUSE (AT WELL PAD)
2018-M04 Produced Fluid (in Barrels) RWC 802 18.60 Bbl REUSE (AT WELL PAD)
2018-M05 Other Oil & Gas Wastes (in Barrels) RWC 899 13.33 Bbl REUSE (AT WELL PAD)
2018-M05 Produced Fluid (in Barrels) RWC 802 73.44 Bbl REUSE (AT WELL PAD)
2018-M05 Produced Fluid (in Barrels) RWC 802 17.99 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018-M06 Other Oil & Gas Wastes (in Barrels) RWC 899 21.11 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-M06 Other Oil & Gas Wastes (in Barrels) RWC 899 37.78 Bbl REUSE (AT WELL PAD)
2018-M06 Produced Fluid (in Barrels) RWC 802 69.08 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-M06 Produced Fluid (in Barrels) RWC 802 37.68 Bbl REUSE (AT WELL PAD)
2018-M07 Other Oil & Gas Wastes (in Barrels) RWC 899 43.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-M07 Other Oil & Gas Wastes (in Barrels) RWC 899 14.44 Bbl REUSE (AT WELL PAD)
2018-M07 Produced Fluid (in Barrels) RWC 802 201.70 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-M07 Produced Fluid (in Barrels) RWC 802 63.78 Bbl REUSE (AT WELL PAD)
2018-M08 Other Oil & Gas Wastes (in Barrels) RWC 899 11.11 Bbl REUSE (AT WELL PAD)
2018-M08 Produced Fluid (in Barrels) RWC 802 16.24 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-M08 Produced Fluid (in Barrels) RWC 802 16.24 Bbl REUSE (AT WELL PAD)
2018-M09 Produced Fluid (in Barrels) RWC 802 16.32 Bbl REUSE (AT WELL PAD)
2018-M10 Servicing Fluid (in Barrels) RWC 808 13.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-M10 Servicing Fluid (in Barrels) RWC 808 497.72 Bbl REUSE (AT WELL PAD)
2018-M10 Servicing Fluid (in Barrels) RWC 808 112.68 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018-M11 Other Oil & Gas Wastes (in Barrels) RWC 899 18.89 Bbl REUSE (AT WELL PAD)
2018-M11 Produced Fluid (in Barrels) RWC 802 55.33 Bbl REUSE (AT WELL PAD)
2018-M12 Produced Fluid (in Barrels) RWC 802 38.75 Bbl REUSE (AT WELL PAD)
2019-M01 Other Oil & Gas Wastes (in Barrels) RWC 899 43.33 Bbl REUSE (AT WELL PAD)
2019-M01 Produced Fluid (in Barrels) RWC 802 863.82 Bbl REUSE (AT WELL PAD)
2019-M02 Other Oil & Gas Wastes (in Barrels) RWC 899 32.73 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019-M02 Produced Fluid (in Barrels) RWC 802 76.56 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2019-M02 Produced Fluid (in Barrels) RWC 802 10.15 Bbl REUSE (AT WELL PAD)
2019-M03 Other Oil & Gas Wastes (in Barrels) RWC 899 220.00 Bbl REUSE (AT WELL PAD)
2019-M03 Produced Fluid (in Barrels) RWC 802 12.09 Bbl REUSE (AT WELL PAD)

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2419160 Primary Facility 2015-10-20 Drilling/Alteration No Violations Noted Well spud on 10/18/2015. Operator drilled 30-inch borehole and set 26-inch conductor pipe at 40 ft. Conductor pipe cemented to surface.
2432223 Primary Facility 2015-11-24 Drilling/Alteration No Violations Noted Decker Rig #8. Operator plugged vertical portion of the borehole back to KOP. Borehole loaded with SOBM.
2432227 Primary Facility 2015-11-04 Drilling/Alteration No Violations Noted Decker Rig #8. Intermediate portion of borehole drilled to 2,732’. Performing reamer run with tri-cone bit. Site ok.
2432231 Primary Facility 2015-11-18 Drilling/Alteration No Violations Noted Decker Rig #8. Top hole portion of well drilled to 7,870’ MD. Preparing to log borehole.
2432233 Primary Facility 2015-10-30 Drilling/Alteration No Violations Noted Decker Rig #8. Coal protective casing (13 3/8”) set and cemented to surface with no issues on 10/29/15. Casing shoe TD is 1,336’. Drilled out shoe. Conduct site inspection. Site ok.
2432237 Primary Facility 2015-10-28 Drilling/Alteration No Violations Noted Decker Rig #8. Surface casing (18 5/8”) set and cemented to surface with no issues on 10/27/15. Operator currently drilling ahead @ 741’.
2432240 Primary Facility 2015-11-12 Drilling/Alteration No Violations Noted Decker Rig #8. Intermediate portion of borehole drilled to 2,732’. Intermediate casing (9 5/8”) set @2,713’ and cemented on 11/1/15. 9 5/8” Casing shoe TD is 2,713’. Drilling ahead @ 7,228’.
2472164 Primary Facility 2016-03-01 Drilling/Alteration No Violations Noted Drilling complete. Well drilled to 13,926’ TMD / 7,551’ TVD. Production casing set @ 13,906’ and cemented to the surface.


Note: Conservation well

2480002 Primary Facility 2016-03-30 Routine/Complete Inspection No Violations Noted Well spud and drilled.
2508541 Primary Facility 2016-08-02 Routine/Complete Inspection No Violations Noted Well drilled. Well for hydrualic fracturing operations to begin.
2513498 Primary Facility 2016-08-24 Routine/Complete Inspection No Violations Noted Well drilled. Hydraulic fracturing operations on site.
2518401 Primary Facility 2016-09-06 Routine/Complete Inspection No Violations Noted Hydraulic Fracturing operations ongoing on site.
2714369 Primary Facility 2018-04-04 Routine/Complete Inspection No Violations Noted Unable to observe the well. The well is located below grade and covered by a steel plate and containment. The operator is currently drilling on site. The well is producing. Five 400 bbl production tanks are on site and equipped with containment.

For data sources see[7]

References